SAP Messages

SAP message number 213 within class M7 - Required date of production &








Messsage Text for 213(M7)

Required date of production &


What causes this issue?
The system calculated the remaining shelf life of the material on the basis of the production date that you entered.
However, the remaining shelf life is less than the required minimum remaining shelf life as specified in the purchase order or material master record.

System Response
Depending on how the system is set, this message is either a warning or an error message.

How to fix the issue?
INCLUDE NA_EINGABE_PRUEFEN
If this message is an error message, this goods receipt is not allowed.


ABAP Code to add mesage to own reports


MESSAGE W213(M7). "warning message
MESSAGE E213(M7). "Error message
--> See here for more options


Contribute (Add Comments)

Use the comments section below to add any links, information or screen shots that you feel are relevant to this message. This could include issues you have found that cause the messages to appear incorrectly as well as any fixes you have found or relevant SAP OSS notes. You will then be able to find this information quickly, simply by searching on the message class M7 and number 213



Return to Message Class M7