PSHLP_PROJ_CHG_FM_ST SAP (Project Master Data structure for Project Change FM) Structure details
Description: Project Master Data structure for Project Change FM
Related tables to PSHLP_PROJ_CHG_FM_ST
Access table PSHLP_PROJ_CHG_FM_ST
Structure field list including key, data, relationships and ABAP select examples
PSHLP_PROJ_CHG_FM_ST is a standard SAP Structure so does not store data like a database table does. It can be used to define the fields of other actual tables or to process "Project Master Data structure for Project Change FM" Information within sap ABAP programs.
This is done by declaring abap internal tables, work areas or database tables based on this Structure. These can then be used to store and process the required data appropriately.
i.e. DATA: wa_PSHLP_PROJ_CHG_FM_ST TYPE PSHLP_PROJ_CHG_FM_ST.
The PSHLP_PROJ_CHG_FM_ST table consists of various fields, each holding specific information or linking keys about Project Master Data structure for Project Change FM data available in SAP. These include PROJ_DEFINITION (PS: Short description (1st text line)), PLANT (Plant), LOCATION (Location), PROFIT_CENTER (Profit Center).. See below for full list along with technical details, documentation, text table, check tables, foreign key relationships, conversion routines, relevant tcodes and example ABAP select code etc. .
Delivery Class:Display/Maintenance via tcode SM30: Display/Maintenance Allowed but with Restrictions
SAP enhancement categories: Cannot Be Enhanced
SAP PSHLP_PROJ_CHG_FM_ST structure fields - Full list of fields found in SAP data dictionary
Field | Description | Data Element | Data Type | length (Dec) | Check table | Conversion Routine | Domain Name | MemoryID | SHLP |
PROJECT_INDEX | Index to Map the Key to the Data | PSHLP_FM_INDEX_DE | NUMC | 4 | PSHLP_FM_INDEX_TD | ||||
PROJ_DEFINITION | PS: Short description (1st text line) | PS_POST1 | CHAR | 40 | TEXT40 | ||||
PLANT | Plant | WERKS_D | CHAR | 4 | Assigned to domain | WERKS | WRK | H_T001W_C | |
LOCATION | Location | PS_STORT | CHAR | 10 | Assigned to domain | AP_STAND | |||
PROFIT_CENTER | Profit Center | PRCTR | CHAR | 10 | Assigned to domain | ALPHA | PRCTR | PRC | PRCTR_EMPTY |
CURRENCY | WBS currency (project definition) | PS_PWHIE | CUKY | 5 | Assigned to domain | WAERS | |||
PERSON_RESPONSIBLE | Number of the responsible person (project manager) | PS_VERNR | NUMC | 8 | Assigned to domain | PS_VERNR | |||
APPLICANT_NUMBER | Applicant number | PS_ASTNR | NUMC | 8 | Assigned to domain | PS_ASTNR | |||
BUDGET_PROFILE | Budget Profile | BP_BPROFIL | CHAR | 6 | Assigned to domain | BP_PROFIL | BP1 | ||
PLANNING_PROFILE | Planning profile | BP_PPROFIL | CHAR | 6 | Assigned to domain | BP_PROFIL | BP1 | ||
INTEREST_PROFILE | Interest Profile for Project/Order Interest Calculation | PS_ZSCHM | CHAR | 7 | Assigned to domain | PS_ZSCHM | |||
NETWORK_PROFILE | Network profile | PROFIDNZPL | CHAR | 7 | Assigned to domain | PROFILID | PNW | ||
INVESTMENT_PROFILE | Investment measure profile | IM_PROFIL | CHAR | 6 | Assigned to domain | IM_PROFIL | |||
RESULT_ANALYSIS_KEY | Results Analysis Key | ABGR_SCHL | CHAR | 6 | Assigned to domain | ABGR_SCHL | ACS | ||
SIMULATION_PROFILE | Simulation profile | SIM_PROFIL | CHAR | 7 | Assigned to domain | SIM_PROFIL | |||
PARTNER_DETERMIN_PROCEDURE | Partner Determination Procedure | PARGR | CHAR | 4 | Assigned to domain | PARGR | |||
OBJECT_CLASS | Object Class | SCOPE_CV | CHAR | 2 | SCOPE | SCOPE_CV | PCO | ||
TAX_JURISDICTION | Tax Jurisdiction | TXJCD | CHAR | 15 | Assigned to domain | TXJCD | TXJ | ||
STATISTICAL_WBS_ELEMENT | Statistical WBS element | PS_XSTAT | CHAR | 1 | XFELD | ||||
INTEGRATEDPLANNING_INDICATOR | Indicator for Integrated Planning | PLINT | CHAR | 1 | XFELD | ||||
SALES_ORGANIZATION | Sales Organization | VKORG | CHAR | 4 | Assigned to domain | VKORG | VKO | C_VKORG | |
DISTRIBUTION_CHANNEL | Distribution Channel | VTWEG | CHAR | 2 | Assigned to domain | VTWEG | VTW | C_VTWEG | |
DIVISION | Division | SPART | CHAR | 2 | Assigned to domain | SPART | SPA | C_SPART | |
DYNAMIC_ITEM_PROCESSOR_PROFILE | Dynamic Item Processor Profile | AD01PROFNR | CHAR | 8 | Assigned to domain | AD01PROFNR | AD0 | DIP_PROFILE | |
PLANNED_START_DATE | Project planned start date | PS_PLFAZ | DATS | 8 | DATUM | ||||
PLANNED_FINISH_DATE | Project planned finish date | PS_PLSEZ | DATS | 8 | DATUM | ||||
FACTORY_CALENDAR | Factory calendar key | FABKL | CHAR | 2 | Assigned to domain | WFCID | |||
TIME_UNIT | Time unit in time scheduling | PS_ZTEHT | UNIT | 3 | Assigned to domain | CUNIT | MEINS | ||
FORECASTED_START_DATE | Forecast start date of project definition | PS_SPROG | DATS | 8 | DATE | ||||
FORECASTED_FINISH_DATE | Forecast finish date for project definition | PS_EPROG | DATS | 8 | DATE | ||||
PROFILE_WBS_SCHEDULING | Profile for WBS scheduling | PS_SCHDPRF | CHAR | 12 | Assigned to domain | PS_SCHDPRF | |||
SCHEDULING_SCENARIO | Scheduling scenario | PS_SCHED_TYPE | CHAR | 1 | PS_SCHED_TYPE | ||||
PLANNINGMETHOD_BASICDATES | Planning method for project basic dates | PS_VGPLF | NUMC | 1 | PSPLFRM | ||||
PLANNINGMETHOD_FORECASTDATES | Planning method for project forecast dates | PS_EWPLF | NUMC | 1 | PSPLFRM |
Key field | Non-key field |
How do I retrieve data from SAP structure PSHLP_PROJ_CHG_FM_ST using ABAP code?
As PSHLP_PROJ_CHG_FM_ST is a database structure and not a table it does not store any data in the SAP data dictionary. The ABAP SELECT statement is therefore not appropriate and can not be performed on PSHLP_PROJ_CHG_FM_ST as there is no data to select.How to access SAP table PSHLP_PROJ_CHG_FM_ST
Within an ECC or HANA version of SAP you can also view further information about PSHLP_PROJ_CHG_FM_ST and the data within it using relevant transactions such asSE11 (ABAP Dictionary Maintenance)
SM30 (Maintain Table Data)
SE80 (Object Navigator)
SE16 (Data Browser).
Search for further information about these or an SAP related objects