SAP ME_COMP_REQUIREMENT_DATE Function Module for NOTRANSL: Berechnung der Bedarfstermine von LB-Komponenten
ME_COMP_REQUIREMENT_DATE is a standard me comp requirement date SAP function module available within SAP R/3 or S/4 Hana systems, depending on your version and release level. It is used for NOTRANSL: Berechnung der Bedarfstermine von LB-Komponenten processing and below is the pattern details for this FM, showing its interface including any import and export parameters, exceptions etc. there is also a full "cut and paste" ABAP pattern code example, along with implementation ABAP coding, documentation and contribution comments specific to this or related objects.
See here to view full function module documentation and code listing for me comp requirement date FM, simply by entering the name ME_COMP_REQUIREMENT_DATE into the relevant SAP transaction such as SE37 or SE38.
Function Group: EINH
Program Name: SAPLEINH
Main Program: SAPLEINH
Appliation area:
Release date: N/A
Mode(Normal, Remote etc): Normal Function Module
Update:

Function ME_COMP_REQUIREMENT_DATE pattern details
In-order to call this FM within your sap programs, simply using the below ABAP pattern details to trigger the function call...or see the full ABAP code listing at the end of this article. You can simply cut and paste this code into your ABAP progrom as it is, including variable declarations.CALL FUNCTION 'ME_COMP_REQUIREMENT_DATE'"NOTRANSL: Berechnung der Bedarfstermine von LB-Komponenten.
EXPORTING
IM_PLANT = "Plant
IM_FACTORY_CALENDAR = "Key for Factory Calendar
IM_DELIVERY_DATE = "Item Delivery Date
IM_PLANNED_DEL_TIME = "Planned Delivery Time in Days
IMPORTING
EX_REQUIREMENT_DATE = "Item Delivery Date
IMPORTING Parameters details for ME_COMP_REQUIREMENT_DATE
IM_PLANT - Plant
Data type: T001W-WERKSOptional: No
Call by Reference: Yes
IM_FACTORY_CALENDAR - Key for Factory Calendar
Data type: T001W-FABKLOptional: No
Call by Reference: Yes
IM_DELIVERY_DATE - Item Delivery Date
Data type: EBAN-LFDATOptional: No
Call by Reference: Yes
IM_PLANNED_DEL_TIME - Planned Delivery Time in Days
Data type: MARC-PLIFZOptional: No
Call by Reference: Yes
EXPORTING Parameters details for ME_COMP_REQUIREMENT_DATE
EX_REQUIREMENT_DATE - Item Delivery Date
Data type: EBAN-LFDATOptional: No
Call by Reference: Yes
Copy and paste ABAP code example for ME_COMP_REQUIREMENT_DATE Function Module
The ABAP code below is a full code listing to execute function module POPUP_TO_CONFIRM including all data declarations. The code uses the original data declarations rather than the latest in-line data DECLARATION SYNTAX but I have included an ABAP code snippet at the end to show how declarations would look using the newer method of declaring data variables on the fly. This will allow you to compare and fully understand the new inline method. Please note some of the newer syntax such as the @DATA is not available until a later 4.70 service pack (SP8), which i why i have stuck to the origianl for this example.| DATA: | ||||
| lv_im_plant | TYPE T001W-WERKS, " | |||
| lv_ex_requirement_date | TYPE EBAN-LFDAT, " | |||
| lv_im_factory_calendar | TYPE T001W-FABKL, " | |||
| lv_im_delivery_date | TYPE EBAN-LFDAT, " | |||
| lv_im_planned_del_time | TYPE MARC-PLIFZ. " |
|   CALL FUNCTION 'ME_COMP_REQUIREMENT_DATE' "NOTRANSL: Berechnung der Bedarfstermine von LB-Komponenten |
| EXPORTING | ||
| IM_PLANT | = lv_im_plant | |
| IM_FACTORY_CALENDAR | = lv_im_factory_calendar | |
| IM_DELIVERY_DATE | = lv_im_delivery_date | |
| IM_PLANNED_DEL_TIME | = lv_im_planned_del_time | |
| IMPORTING | ||
| EX_REQUIREMENT_DATE | = lv_ex_requirement_date | |
| . " ME_COMP_REQUIREMENT_DATE | ||
ABAP code using 7.40 inline data declarations to call FM ME_COMP_REQUIREMENT_DATE
The below ABAP code uses the newer in-line data declarations. This allows you to see the coding differences/benefits of the later inline syntax. Please note some of the newer syntax below, such as the @DATA is not available until 4.70 EHP 8.| "SELECT single WERKS FROM T001W INTO @DATA(ld_im_plant). | ||||
| "SELECT single LFDAT FROM EBAN INTO @DATA(ld_ex_requirement_date). | ||||
| "SELECT single FABKL FROM T001W INTO @DATA(ld_im_factory_calendar). | ||||
| "SELECT single LFDAT FROM EBAN INTO @DATA(ld_im_delivery_date). | ||||
| "SELECT single PLIFZ FROM MARC INTO @DATA(ld_im_planned_del_time). | ||||