PSIS_GEN_PRTE SAP (Generated structure for LDB PSJ. Do not modify manually.) Structure details
Description: Generated structure for LDB PSJ. Do not modify manually.
Related tables to PSIS_GEN_PRTE
Access table PSIS_GEN_PRTE
Structure field list including key, data, relationships and ABAP select examples
PSIS_GEN_PRTE is a standard SAP Structure so does not store data like a database table does. It can be used to define the fields of other actual tables or to process "Generated structure for LDB PSJ. Do not modify manually." Information within sap ABAP programs.
This is done by declaring abap internal tables, work areas or database tables based on this Structure. These can then be used to store and process the required data appropriately.
i.e. DATA: wa_PSIS_GEN_PRTE TYPE PSIS_GEN_PRTE.
The PSIS_GEN_PRTE table consists of various fields, each holding specific information or linking keys about Generated structure for LDB PSJ. Do not modify manually. data available in SAP. These include PSPHI (Current number of the appropriate project), MANDT (Client), PSTRT (WBS element: Basic start date), ESTRT (Forecasted start date of the WBS element).. See below for full list along with technical details, documentation, text table, check tables, foreign key relationships, conversion routines, relevant tcodes and example ABAP select code etc. .
Delivery Class:Display/Maintenance via tcode SM30: Display/Maintenance Allowed but with Restrictions
SAP enhancement categories: Not classified
SAP PSIS_GEN_PRTE structure fields - Full list of fields found in SAP data dictionary
Field | Description | Data Element | Data Type | length (Dec) | Check table | Conversion Routine | Domain Name | MemoryID | SHLP |
POSNR | WBS Element | PS_POSNR | NUMC | 8 | Assigned to domain | ABPSP | PS_POSNR | ||
PSPHI | Current number of the appropriate project | PS_PSPHI | NUMC | 8 | Assigned to domain | KONPD | PS_PSPNR | ||
MANDT | Client | MANDT | CLNT | 3 | Assigned to domain | MANDT | |||
PSTRT | WBS element: Basic start date | PS_PSTRT | DATS | 8 | DATUM | ||||
ESTRT | Forecasted start date of the WBS element | PS_ESTRT | DATS | 8 | DATUM | ||||
ISTRT | Actual start date for the WBS element | PS_ISTRT | DATS | 8 | DATUM | ||||
PENDE | WBS element: Basic finish date | PS_PENDE | DATS | 8 | DATUM | ||||
EENDE | Forecasted finish date of the WBS element | PS_EENDE | DATS | 8 | DATUM | ||||
IENDE | Actual finish date of the WBS element | PS_IENDE | DATS | 8 | DATUM | ||||
PDAUR | Length (duration) of the basic dates in the WBS element | PS_PDAUR | QUAN | 5(1) | DAUER_4_1 | ||||
EDAUR | Forecasted length (duration) of the WBS element | PS_EDAUR | QUAN | 5(1) | DAUER_4_1 | ||||
IDAUR | Actual length (duration) of the WBS element | PS_IDAUR | QUAN | 5(1) | DAUER_4_1 | ||||
IEINH | Unit for duration of actual WBS element dates | PS_IEINH | UNIT | 3 | CUNIT | EINHEIT | |||
EEINH | Unit for duration of WBS element planned dates | PS_EEINH | UNIT | 3 | CUNIT | EINHEIT | |||
PEINH | Unit for duration of basic WBS element dates | PS_PEINH | UNIT | 3 | CUNIT | EINHEIT | |||
FLGVG | Indicator: There are activities for the WBS elements | PS_FLGVG | CHAR | 1 | X | ||||
FLGEW | Indicator: Expected dates from the activities | PS_FLGEW | CHAR | 1 | X | ||||
FLGEM | Indicator: Forecast dates set manually | PS_FLGEM | CHAR | 1 | X | ||||
FLGVM | Indicator: Basic dates set manually | PS_FLGVM | CHAR | 1 | X | ||||
FLGIM | Indicator: Actual dates set manually | PS_FLGIM | CHAR | 1 | X | ||||
FLGVI | Indicator: Actual dates from the activities | PS_FLGVI | CHAR | 1 | X | ||||
PSTRM | Earliest scheduled start date (Basic) | PS_GSTRS | DATS | 8 | DATUM | ||||
PETRM | Latest scheduled finish date (basic) | PS_GLTRS | DATS | 8 | DATUM | ||||
ESTRM | Scheduled start date (Forecast) | PS_GSTPP | DATS | 8 | DATUM | ||||
EETRM | Latest scheduled finish date (Forecast) | PS_GLTPP | DATS | 8 | DATUM | ||||
VISTR | Tentative actual start date for WBS element | PS_ISTVORL | DATS | 8 | DATUM | ||||
VIEND | Tentative actual finish date for WBS element | PS_IENVORL | DATS | 8 | DATUM | ||||
PSTRS | Latest scheduled start date (basic) | PS_GSTRE | DATS | 8 | DATUM | ||||
PETRF | Earliest scheduled finish date (basic) | PS_GETRE | DATS | 8 | DATUM | ||||
ESTRS | Latest scheduled start date (forecast) | PS_GSTRP | DATS | 8 | DATUM | ||||
EETRF | Earliest scheduled finish date (forecast) | PS_GLTRP | DATS | 8 | DATUM |
Key field | Non-key field |
How do I retrieve data from SAP structure PSIS_GEN_PRTE using ABAP code?
As PSIS_GEN_PRTE is a database structure and not a table it does not store any data in the SAP data dictionary. The ABAP SELECT statement is therefore not appropriate and can not be performed on PSIS_GEN_PRTE as there is no data to select.How to access SAP table PSIS_GEN_PRTE
Within an ECC or HANA version of SAP you can also view further information about PSIS_GEN_PRTE and the data within it using relevant transactions such asSE11 (ABAP Dictionary Maintenance)
SM30 (Maintain Table Data)
SE80 (Object Navigator)
SE16 (Data Browser).
Search for further information about these or an SAP related objects