/SYCLO/PM_AFVC_STR SAP (Syclo Plant Maintenance Work Order Operation view) Structure details

Dictionary Type: Structure
Description: Syclo Plant Maintenance Work Order Operation view




ABAP Code to SELECT data from /SYCLO/PM_AFVC_STR
Related tables to /SYCLO/PM_AFVC_STR
Access table /SYCLO/PM_AFVC_STR




Structure field list including key, data, relationships and ABAP select examples

/SYCLO/PM_AFVC_STR is a standard SAP Structure so does not store data like a database table does. It can be used to define the fields of other actual tables or to process "Syclo Plant Maintenance Work Order Operation view" Information within sap ABAP programs.

This is done by declaring abap internal tables, work areas or database tables based on this Structure. These can then be used to store and process the required data appropriately.

i.e. DATA: wa_/SYCLO/PM_AFVC_STR TYPE /SYCLO/PM_AFVC_STR.

The /SYCLO/PM_AFVC_STR table consists of various fields, each holding specific information or linking keys about Syclo Plant Maintenance Work Order Operation view data available in SAP. These include MANDT (Client), AUFPL (Routing number of operations in the order), APLZL (General counter for order), PLNFL (Sequence).. See below for full list along with technical details, documentation, text table, check tables, foreign key relationships, conversion routines, relevant tcodes and example ABAP select code etc. .

Delivery Class:
Display/Maintenance via tcode SM30: Display/Maintenance Allowed but with Restrictions
SAP enhancement categories: Can be enhanced (character-type or numeric)


SAP /SYCLO/PM_AFVC_STR structure fields - Full list of fields found in SAP data dictionary

Field Description Data Element Data Type length (Dec) Check table Conversion Routine Domain Name MemoryID SHLP
AUFNROrder Number AUFNRCHAR12Assigned to domainALPHAAUFNRANR
MANDTClient MANDTCLNT3Assigned to domainMANDT
AUFPLRouting number of operations in the order CO_AUFPLNUMC10AUFPL
APLZLGeneral counter for order CO_APLZLNUMC8Assigned to domainCO_APLZL
PLNFLSequence PLNFOLGECHAR6ALPHAPLNFOLGE
PLNKNNumber of the task list node PLNKNNUMC8KNTNR
PLNALGroup Counter PLNALCHAR2ALPHAALTNRPAL
PLNTYTask List Type PLNTYCHAR1Assigned to domainPLNTYPTYH_TCA01
VINTVIncrement between referenced operations VINTVDEC3VINTV
PLNNRKey for Task List Group PLNNRCHAR8ALPHAPLNNRPLNPLKS
ZAEHLInternal counter CIM_COUNTNUMC8CIM_COUNT
VORNROperation/Activity Number VORNRCHAR4NUMCVVORNRVGN
STEUSControl key STEUSCHAR4Assigned to domainSTEUS
ARBIDObject ID of the resource CR_OBJIDNUMC8Assigned to domainCR_OBJID
PDESTPrinter for shop papers CR_PDESTCHAR4Assigned to domainSPDEVRSPOPNAME
WERKSPlant WERKS_DCHAR4Assigned to domainWERKSWRKH_T001W_C
KTSCHStandard text key KTSCHCHAR7Assigned to domainKTSCH
LTXA1Operation short text LTXA1CHAR40TEXT40
LTXA2Second line of the description LTXA2CHAR40TEXT40
TXTSPLanguage Key SPRASLANG1Assigned to domainISOLASPRASSPRH_T002
VPLTYType of the referenced task list VPLNTYCHAR1Assigned to domainPLNTY
VPLNRGroup of the referenced task list VPLNNRCHAR8ALPHAPLNNR
VPLALGroup counter of the referenced task list VPLNALCHAR2ALPHAALTNR
VPLFLReferenced sequence in routing VPLBFLCHAR6ALPHAPLNFOLGE
VGWTSStandard value key VORGSCHLCHAR4Assigned to domainVORGSCHL
LAR01Activity Type LSTARCHAR6Assigned to domainLSTARLARLART_EMPTY
LAR02Activity Type LSTARCHAR6Assigned to domainLSTARLARLART_EMPTY
LAR03Activity Type LSTARCHAR6Assigned to domainLSTARLARLART_EMPTY
LAR04Activity Type LSTARCHAR6Assigned to domainLSTARLARLART_EMPTY
LAR05Activity Type LSTARCHAR6Assigned to domainLSTARLARLART_EMPTY
LAR06Activity Type LSTARCHAR6Assigned to domainLSTARLARLART_EMPTY
ZERMAType of standard value calculation DZERMACHAR5Assigned to domainZERMA
ZGDATDate when the standard value was calculated DZGDATCHAR4GJAHRCJAHR
ZCODEReference number for standard value code DZCODECHAR6ZCODE
ZULNRBasis for standard value calculation DZULNRCHAR5ZULNR
LOANZNumber of Time Tickets LOHNANZDEC3LOHNANZ
LOARTWage Type LOHNARTCHAR4LOART
RSANZNumber of confirmation slips CR_RS_ANZNUMC3NUM03
QUALFSuitability QUALFCHAR2Assigned to domainQUALF
ANZMANumber of employees ANZMSDEC5(2) ANZMA
RFGRPSetup group category RUEFAGRPCHAR10Assigned to domainRUEFAGRP
RFSCHSetup group key RUEFASCHLUCHAR10Assigned to domainRUEFASCHLU
RASCHSetup Type Key RUEARSCHLUCHAR2Assigned to domainRUEARSCHLU
AUFAKScrap factor AUSCHUFAKDEC5(3) AUSCHUFAK
LOGRPWage group LOHNGRPCHAR3Assigned to domainLOHNGRP
UEMUSRequired overlapping UEMUSKZCHAR1XFELD
UEKANOptional overlapping UEKANKZCHAR1XFELD
FLIESIndicator: continuous flow production FLIESSKZCHAR1XFELD
SPMUSRequired splitting SPLITTUNGCHAR1XFELD
SPLIMMaximum number of splits SPLITTANZDEC3SPLITTANZ
ABLIPKZIndicator: simultaneous teardown and wait ABLIPKZCHAR1FLAG
RSTRAReduction strategy per operation/activity RSTRACHAR2Assigned to domainRSTRA
SUMNRNode number of the superior operation SUMKNTNRNUMC8KNTNR
SORTLSort Term for Non-Stock Info Records SORTICHAR10CHAR10
LIFNRAccount Number of Vendor or Creditor LIFNRCHAR10Assigned to domainALPHALIFNRLIFKRED_C
PREISPrice PREISCURR11(2) WERT11
PEINHPrice Unit PEINHDEC5PACK3
SAKTOCost Element KSTARCHAR10Assigned to domainALPHAKSTARKAT
WAERSCurrency Key WAERSCUKY5Assigned to domainWAERSFWS
INFNRNumber of Purchasing Info Record INFNRCHAR10Assigned to domainALPHAINFNRINFMEIN_C
ESOKZPurchasing info record category ESOKZCHAR1ESOKZESO
EKORGPurchasing Organization EKORGCHAR4Assigned to domainEKORGEKO
EKGRPPurchasing group for external processing VG_EKGRPCHAR3Assigned to domainEKGRP
KZLGFIndicator: fixed lot external processing KZLGFCHAR1XFELD
KZWRTFIndicator: Fixed price for external processing KZWRTFCHAR1XFELD
MATKLMaterial Group MATKLCHAR9Assigned to domainMATKLMKLS_WBWG
DDEHNIndicator: flexible duration DAUDEHNCHAR1X
ANZZLNumber of capacities required ANZKAPINT13INT1
PRZNTWork percentage APROZENTINT13INT1
MLSTNUsage MILESTONECHAR5Assigned to domainMILESTONE
PPRIOPriority PRIORITAETCHAR2PRIORITAET
BUKRSCompany Code BUKRSCHAR4Assigned to domainBUKRSBUKC_T001
ANFKORequesting cost center ANFKOCHAR10Assigned to domainALPHAKOSTL
ANFKOKRSControlling area of the requesting cost center ANFKOKRSCHAR4Assigned to domainCACCD
INDETKey for calculation INDETCHAR1INDET
LARNTActivity Type LSTARCHAR6Assigned to domainLSTARLARLART_EMPTY
PRKSTCosts in the activity PRKSTCURR11(2) PRKST
APLFLSequence PLNFOLGECHAR6ALPHAPLNFOLGE
RUECKCompletion confirmation number for the operation CO_RUECKNUMC10CO_RUECKRCK
RMZHLConfirmation counter CO_RMZHLNUMC8CIM_COUNTRZL
PROJNWork breakdown structure element (WBS element) PS_PSP_ELENUMC8Assigned to domainKONPRPS_POSNR
OBJNRObject number J_OBJNRCHAR22Assigned to domainJ_OBJNRONR
SPANZActual number of splits SPLITTERMDEC3DEC3
BEDIDID of the capacity requirements record BEDIDNUMC12Assigned to domainBEDID
BEDZLInternal counter CIM_COUNTNUMC8CIM_COUNT
BANFNPurchase requisition number CO_BANFNCHAR10ALPHABANFN
BNFPOItem number of the purchase requisition in the order CO_BNFPONUMC5Assigned to domainBNFPO
LEK01Indicator: No remaining activity expected CO_LEIKZCHAR1XFELD
LEK02Indicator: No remaining activity expected CO_LEIKZCHAR1XFELD
LEK03Indicator: No remaining activity expected CO_LEIKZCHAR1XFELD
LEK04Indicator: No remaining activity expected CO_LEIKZCHAR1XFELD
LEK05Indicator: No remaining activity expected CO_LEIKZCHAR1XFELD
LEK06Indicator: No remaining activity expected CO_LEIKZCHAR1XFELD
SELKZSelection indicator for costing line items CO_SELKZCHAR1Assigned to domainCK_SELKZ
KALIDFactory Calendar WFCIDCHAR2Assigned to domainWFCIDFCI
FRSPEarliest possible activity / Latest possible activity FRSPCHAR1FRSP
STDKNNode of operation within reference operation set STDKNNUMC8KNTNR
ANLZUSyst.Condition ANLZUCHAR1Assigned to domainANLZU
ISTRUAssembly ISTRUCHAR18Assigned to domainMATN1MATNR
ISTTYBOM category STLTYCHAR1STLTY
ISTNRBill of material STNUMCHAR8NUMCVSTNUMSTLNR
ISTKNBOM item node number STLKNNUMC8KNTNR
ISTPOInternal counter CIM_COUNTNUMC8CIM_COUNT
IUPOZSubitem Number UPOSZCHAR4NUMCVSPOSN
EBORTInstallation Point for Subitem EBORTCHAR20TEXT20
VERTLDistr.cap.reqmts (plant maint.,process order, network) CR_VERTNCHAR8Assigned to domainCR_VERTL
LEKNWIndicator: No Remaining Work Expected LEKNWCHAR1XFELD
NPRIOPriority NW_PRIOCHAR1Assigned to domainNW_PRIO
PVZKNGeneral counter for order CO_APLZLNUMC8Assigned to domainCO_APLZL
PHFLGIndicator: Phase PHFLGCHAR1XFELD
PHSEQControl Recipe Destination PHSEQCHAR2Assigned to domainPHSEQ
KNOBJNumber of Object with Assigned Dependencies KNOBJNUMC18KNOBJ
ERFSICHTRecording View QERFSICHTCHAR2QERFSICHTQER
QPPKTABSFlow Variants for Inspection Point Completion QPPKTABSCHAR1QPPKTABS
OTYPEObject Type OTYPECHAR2Assigned to domainOTYPEPOT
OBJEKTIDObject ID OBJEKTIDNUMC8NUM08PON
QLKAPARCapacity category QL_KAPARTCHAR3Assigned to domainKAPARTCAA
RSTUFReduction level which reduces operation lead time RSTUFNUMC1REDST
NPTXTKYInternal text number (12-character) TXTKYCHAR12CHAR12
SUBSYSSubsystem Identifier for QM Subsystem Interface QEIFSUBSYSCHAR6Assigned to domainQEIFSUBSYS
PSPNRStandard WBS element PS_SPS_ELENUMC8Assigned to domainKONPTPS_SPSNR
PACKNOPackage number PACKNONUMC10Assigned to domainPACKNO
TXJCDTax Jurisdiction TXJCDCHAR15Assigned to domainTXJCDTXJ
SCOPEObject Class SCOPE_CVCHAR2SCOPESCOPE_CVPCO
GSBERBusiness Area GSBERCHAR4Assigned to domainGSBERGSB
PRCTRProfit Center PRCTRCHAR10Assigned to domainALPHAPRCTRPRCPRCTR_EMPTY
NO_DISPEffective for Materials Planning NO_DISP_PLUSCHAR1NO_DISP_PLUS
QKZPRZEITInterval = Time (Time-Related) QKZPRZEITCHAR1QKZ
QKZZTMG1Quantity Confirmation for Each Partial Lot QKZZTMG1CHAR1QKZ
QKZPRMENGCreation Cycle = Quantity (Quantity-Reference) QKZPRMENGCHAR1QKZ
QKZPRFREIInterval Without Reference to Time or Quantity QKZPRFREICHAR1QKZ
KZFEATIndicator Is Not Used Currently QKZFEATCHAR1QKZFEAT
QKZTLSBESTOperation with Stock-Related Partial Lot Assignment QKZTLSBESTCHAR1QKZ
AENNRChange Number AENNRCHAR12Assigned to domainAENNRAENNRAEN
CUOBJ_ARBConfiguration (internal object number) CUOBJNUMC18CUOBJCUX
EVGEWAggregation weight for POC (PS progress) EV_WEIGHTDDEC8DEC8
ARBIIActual operating resources object identification CR_OBJID_INUMC8Assigned to domainCR_OBJID
WERKIActual plant WERKS_ICHAR4Assigned to domainWERKSWRK
CY_SEQNRVSequence number operation CY_SEQNRVNUMC14CY_SEQNR
KAPT_PUFFROperation floats after finite scheduling (in seconds) KAPT_PUFFRINT410INT4
EBELNPurchasing Document Number EBELNCHAR10Assigned to domainALPHAEBELNBESMEKK_C
EBELPItem Number of Purchasing Document EBELPNUMC5Assigned to domainEBELPBSP
WEMPFGoods Recipient/Ship-To Party WEMPFCHAR12WEMPF
ABLADUnloading Point ABLADCHAR25TEXT25
CLASFInd.: Take Activity Into Account for Project Summarization CLASFCHAR1XFELD
FRUNVIndicator: External procurement data incomplete FRUNVCHAR1KREUZ
ZSCHLOverhead key AUFZSCHLCHAR6CHAR6
KALSMCosting Sheet AUFKALSMCHAR6Assigned to domainKALSM
SCHED_ENDInd.: Purchase requisition at activity finish date SCEND_ACTCHAR1XFELD
NETZKONTIndicator for the account assignment of a network(hdr/act.) NETZKONTCHAR1NETZKONT
OWAERObject currency for network activity OWAERSCUKY5Assigned to domainWAERS
AFNAMName of Requisitioner/Requester AFNAMCHAR12AFNAM
BEDNRRequirement Tracking Number BEDNRCHAR10CHAR10
KZFIXIndicator: Purchasing info record data are fixed CN_KZFIXCHAR1XFELD
PERNRPersonnel number CO_PERNRNUMC8PERNRPER
FRDLBIndicator: Externally processed op. with subcontracting CO_FRDLBCHAR1CHAR1
QPARTInspection Type QPARTCHAR8Assigned to domainQPARTQLA
LOEKZDeletion flag AUFLOEKZCHAR1XFELD
WKURSExchange Rate WKURSDEC9(5) EXCRTKURSP
PROD_ACTIndicator: Activity is a production activity PROD_ACTCHAR1XFELD
FPLNRBilling plan number / invoicing plan number FPLNRCHAR10Assigned to domainFPLNR
OBJTYPEChange indicator OCM_OBJ_TYPECHAR1OCM_OBJ_TYPE
CH_PROCProcess that has lead to the change of an object OCM_CH_PROCCHAR1OCM_CH_PROC
KLVARCosting Variant CK_KLVARCHAR4Assigned to domainKLVARKRT
KALNRCost Estimate Number for Cost Est. w/o Qty Structure CK_KALNRNUMC12Assigned to domainCK_KALNRKNR
FORDNFramework Order SFORDNCHAR10Assigned to domainALPHAEBELN
FORDPItem of framework order FORDPNUMC5Assigned to domainEBELP
MAT_PRKSTMaterial planning in networks: primary costs MAT_PRKSTCURR11(2) PRKST
PRZ01Business Process CO_PRZNRCHAR12Assigned to domainALPHACO_PRZNRKWP
RFPNTReference point for BOM transfer CN_RFPNTCHAR20Assigned to domainCN_RFPNT
FUNC_AREAFunctional Area FKBERCHAR16Assigned to domainFKBERFBE
TECHSParameter Variant/Standard Variant TECHSCHAR12TECHS
ADPSPReference Element PM/PS ADDCOMPARE_CORECHAR40Assigned to domainADDCOMPARE_COREADCP
RFIPPNTReference Point for Relationship Between iPPE and PS CN_RPIPCHAR20Assigned to domainCN_RFPNT
MES_OPERIDKey of an Operation from an ME System CO_MES_INT_OPERIDCHAR48CHAR48
MES_STEPIDKey of a Step in a Routing (SAP ME) CO_MES_INT_STEPIDCHAR6CHAR6
.INCLU--AP 0
/CUM/CUGUIDUUID in X form (binary) SYSUUID_XRAW16/CUM/AFCUSYSUUID
.INCLU--AP 0
/ISDFPS/OBJNRObject number J_OBJNRCHAR22Assigned to domainJ_OBJNRONR
.INCLU--AP 0
AFVC_STATUSStatus Combination ACTCMB_DELEINT13ACTCMB_TABACTCMB_DOM
.INCLU--AP 0
MILL_OC_AUFNR_MONumber of Combined Order MILL_OC_AUFNR_MOCHAR12Assigned to domainALPHAAUFNR
.INCLU--AP 0
WTY_INDWarranty indicator WTYSC_WTY_INDICATORCHAR1WTYSC_WTY_INDICATOR
TPLNRFunctional Location TPLNRCHAR30Assigned to domainTPLNRTPLNRIFLIFLM
EQUNREquipment Number EQUNRCHAR18Assigned to domainALPHAEQUNREQNEQUI
.INCLU--AP 0
CPD_UPDATTime Stamp /CPD/PFP_TSTMPDEC15TSTLC/CPD/PFP_TSTMP
UVORNSuboperation UVORNCHAR4NUMCVVORNR
ARBPLWork center ARBPLCHAR8ARBPLAGR
QMNUMNotification No QMNUMCHAR12Assigned to domainALPHAQMNUMIQM
MEINHUnit of Measure for Activity/Operation VORMEUNIT3T006CUNITMEINS
UMRENDenominator for converting rtg and op units of measure CP_UMRENDEC5UMBSN
UMREZNumerator for converting task list and oper. un. of measure CP_UMREZDEC5UMBSZ
BMSCHBase Quantity BMSCHQUAN13(3) BMSCH
ZMERHBreak DZMERHQUAN9(3) VGWRT
ZEIERUnit for the break time DZEIERUNIT3T006CUNITMEINS
VGE01Unit of measure for the standard value VGWRTEHUNIT3T006CUNITMEINS
VGW01Standard Value VGWRTQUAN9(3) VGWRT
VGE02Unit of measure for the standard value VGWRTEHUNIT3T006CUNITMEINS
VGW02Standard Value VGWRTQUAN9(3) VGWRT
VGE03Unit of measure for the standard value VGWRTEHUNIT3T006CUNITMEINS
VGW03Standard Value VGWRTQUAN9(3) VGWRT
VGE04Unit of measure for the standard value VGWRTEHUNIT3T006CUNITMEINS
VGW04Standard Value VGWRTQUAN9(3) VGWRT
VGE05Unit of measure for the standard value VGWRTEHUNIT3T006CUNITMEINS
VGW05Standard Value VGWRTQUAN9(3) VGWRT
VGE06Unit of measure for the standard value VGWRTEHUNIT3T006CUNITMEINS
VGW06Standard Value VGWRTQUAN9(3) VGWRT
ZEIMUUnit for the minimum overlap time DZEIMUUNIT3T006CUNITMEINS
ZMINUMinimum overlap time DZMINUQUAN9(3) VGWRT
MINWEMinimum Send-Ahead Quantity MINWEIQUAN13(3) MINWEI
ZEIMBUnit for the minimum processing time DZEIMBUNIT3T006CUNITMEINS
ZMINBMinimum processing time DZMINBQUAN9(3) VGWRT
ZEILMUnit for the maximum wait time DZEILMUNIT3T006CUNITMEINS
ZLMAXMaximum wait time DZLMAXQUAN9(3) VGWRT
ZEILPUnit for the required wait time DZEILPUNIT3T006CUNITMEINS
ZLPROMinimum wait time DZLPROQUAN9(3) VGWRT
ZEIWNUnit for the standard queue time DZEIWNUNIT3T006CUNITMEINS
ZWNORStandard queue time DZWNORQUAN9(3) VGWRT
ZEIWMUnit for the minumum queue time DZEIWMUNIT3T006CUNITMEINS
ZWMINMinimum queue time DZWMINQUAN9(3) VGWRT
ZEITNUnit for the standard move time DZEITNUNIT3T006CUNITMEINS
ZTNORStandard move time DZTNORQUAN9(3) VGWRT
ZEITMUnit for the minimum move time DZEITMUNIT3T006CUNITMEINS
ZTMINMinimum move time DZTMINQUAN9(3) VGWRT
PLIFZPlanned Delivery Time in Days PLIFZDEC3DEC3
DAUNONormal duration of the activity DAUNORQUAN5(1) DAUER_4_1
DAUNENormal duration/unit DAUNOREUNIT3T006CUNITMEINS
DAUMIMinimum activity duration DAUMINQUAN5(1) DAUER_4_1
DAUMEUnit for the minimum duration DAUMINEUNIT3T006CUNITMEINS
EINSAConstraint on the basic start date for the activity EINSCHRACHAR1RESTRIKSTR
EINSEConstraint on the finish date of the activity EINSCHRECHAR1RESTRIKEND
ARBEIWork involved in the activity ARBEITQUAN7(1) ARBEIT
ARBEHUnit for work ARBEITEUNIT3T006CUNITMEINS
MGVRGOperation Quantity MGVRGQUAN13(3) MENG13
ASVRGOperation scrap ASVRGQUAN13(3) MENG13
LMNGATotal Yield Confirmed LMNGAQUAN13(3) MENG13
XMNGATotal scrap quantity confirmed XMNGAQUAN13(3) MENG13
GMNGAConfirmed yield in order unit of measure GMNGAQUAN13(3) MENG13
ISM01Previously confirmed activity CO_RUMNGQUAN13(3) MENGV13
ISM02Previously confirmed activity CO_RUMNGQUAN13(3) MENGV13
ISM03Previously confirmed activity CO_RUMNGQUAN13(3) MENGV13
ISM04Previously confirmed activity CO_RUMNGQUAN13(3) MENGV13
ISM05Previously confirmed activity CO_RUMNGQUAN13(3) MENGV13
ISM06Previously confirmed activity CO_RUMNGQUAN13(3) MENGV13
ISMNWActual work CO_ISMNWQUAN13(3) MENG13
FSAVDEarliest scheduled start: Execution (date) FSAVDDATS8DATUM
FSAVZEarliest scheduled start: Execution (time) FSAVZTIMS6ATIME
FSSBDEarliest scheduled start: Processing (date) FSSBDDATS8DATUM
FSSBZEarliest scheduled start: Processing (time) FSSBZTIMS6ATIME
FSSADEarliest scheduled start: Teardown (date) FSSADDATS8DATUM
FSSAZEarliest scheduled start: Teardown (time) FSSAZTIMS6ATIME
FSEDDEarliest scheduled finish: Execution (date) FSEDDDATS8DATUM
FSEDZEarliest scheduled finish: Execution (time) FSEDZTIMS6ATIME
FSSLDEarliest scheduled start: Wait (date) FSSLDDATS8DATUM
FSSLZEarliest scheduled start: Wait (time) FSSLZTIMS6ATIME
FSELDEarliest scheduled finish: Wait (date) FSELDDATS8DATUM
FSELZEarliest scheduled finish: Wait (time) FSELZTIMS6ATIME
SSAVDLatest scheduled start: Execution (date) SSAVDDATS8DATUM
SSAVZLatest scheduled start: Execution (time) SSAVZTIMS6ATIME
SSSBDLatest scheduled start: Processing (date) SSSBDDATS8DATUM
SSSBZLatest scheduled start: Processing (time) SSSBZTIMS6ATIME
SSSADLatest scheduled start: Teardown (date) SSSADDATS8DATUM
SSSAZLatest scheduled start: Teardown (time) SSSAZTIMS6ATIME
SSEDDLatest scheduled finish: Execution (date) SSEDDDATS8DATUM
SSEDZLatest scheduled finish: Execution (time) SSEDZTIMS6ATIME
SSSLDLatest scheduled start: Wait time (date) SSSLDDATS8DATUM
SSSLZLatest scheduled start: Wait time SSSLZTIMS6ATIME
SSELDLatest scheduled finish: Wait time (date) SSELDDATS8DATUM
SSELZLatest scheduled finish: Wait time SSELZTIMS6ATIME
ISAVDActual operation start (date) ISAVDDATS8DATUM
IEAVDActual finish of operation (date) IEAVDDATS8DATUM
ISDDActual start: Execution (date) ISDDDATS8DATUM
ISDZActual start: Execution/setup (time) ISDZTIMS6ATIME
IERDActual finish: Setup (date) IERDDATS8DATUM
IERZActual finish: Setup (time) IERZTIMS6ATIME
ISBDActual start: Processing (date) ISBDDATS8DATUM
ISBZActual start: Processing (time) ISBZTIMS6ATIME
IEBDActual finish: Processing (date) IEBDDATS8DATUM
IEBZActual processing finish (time) IEBZTIMS6ATIME
ISADActual start: Teardown (date) ISADDATS8DATUM
ISAZActual start: Teardown (time) ISAZTIMS6ATIME
IEDDActual finish: Execution (date) IEDDDATS8DATUMEDR
IEDZActual finish: Execution (time) IEDZTIMS6ATIMEEZR
PEDDForecast finish date of operation from confirmation CO_PEDDDATS8DATUM
PEDZForecast finish time of operation from confirmation CO_PEDZTIMS6ATIME
PUFFRFree float PUFFR_FREIDEC3PUFFER
PUFGSTotal float PUFFR_GESMDEC3PUFFER
NTANFConstraint for activity start (Basic) VORGABESTDDATS8VORGABESTR
NTANZConstraint for activity start time (Basic) VORGABESTZTIMS6ATIME
NTENDConstraint for Finish of Activity (Basic) VORGABEEND2DATS8VORGABEEND
NTENZBasic finish time of the activity VORGABEENZTIMS6ATIME
EWSTDForecasted start date for the activity EWSTARTDDATS8DATUM
EWSTZForecast start time of the activity EWSTARTZTIMS6ATIME
EWENDForecast finish date EWENDEDDATS8DATUM
EWENZForecast finish time for the activity EWENDEZTIMS6ATIME
EWDANNormal duration (from forecast) of activity EWDANQUAN5(1) DAUER_4_1
EWDNEUnit for forecast normal duration EWDNEUNIT3T006CUNITMEINS
EWDAMMinimum duration (from forecast) for activity EWDAMQUAN5(1) DAUER_4_1
EWDMEUnit for forecast minimum duration EWDMEUNIT3T006CUNITMEINS
EWSTEForecast date constraint on activity finish PS_RESTECHAR1RESTRIKEND
EWSTAForecast date constraint on activity start PS_RESTACHAR1RESTRIKSTR
WARTZQueue time used for scheduling WARTEZEITFLTP16(16) CX_ZEIT
WRTZEUnit of measure for queue time WTRZEUNIT3CUNITEINHEIT
RUESTSetup time RUESTFLTP16(16) CX_ZEIT
RSTZEUnit of measure for setup time RSTZEUNIT3CUNITEINHEIT
BEARZProcessing time BEARZEITFLTP16(16) CX_ZEIT
BEAZEUnit of measure for processing time BEAZEUNIT3CUNITEINHEIT
ABRUETeardown ABRUEFLTP16(16) CX_ZEIT
ARUZEUnit of measure for teardown ARUZEUNIT3CUNITEINHEIT
LIEGZWait time used for scheduling LIEGEZEITFLTP16(16) CX_ZEIT
LIGZEUnit of measure for wait time LIGZEUNIT3CUNITEINHEIT
TRANZMove time used for scheduling TRANSZEITFLTP16(16) CX_ZEIT
TRAZEUnit of measure for move time TRAZEUNIT3CUNITEINHEIT
ISERHConfirmed break time ISERHQUAN9(3) VGWRT
OFM01Forecast value used to update the standard value CO_SCHAETZQUAN9(3) VGWRT
OFM02Forecast value used to update the standard value CO_SCHAETZQUAN9(3) VGWRT
OFM03Forecast value used to update the standard value CO_SCHAETZQUAN9(3) VGWRT
OFM04Forecast value used to update the standard value CO_SCHAETZQUAN9(3) VGWRT
OFM05Forecast value used to update the standard value CO_SCHAETZQUAN9(3) VGWRT
OFM06Forecast value used to update the standard value CO_SCHAETZQUAN9(3) VGWRT
OFMNWForecasted work (actual + remaining) OFMNWQUAN7(1) ARBEIT
BZOFFBReference date for start of sub-operation CP_OBZOFFBCHAR2TCA54CP_BZOFF
EHOFFBUnit for offset to start CP_OEHOFFBUNIT3T006CUNITMEINS
OFFSTBOffset to sub-operation start CP_OOFFSTBQUAN5VNZTV
OFFSTEOffset to sub-operation finish CP_OOFFSTEQUAN5VNZTV
BZOFFEReference date for finish of sub-operation CP_OBZOFFECHAR2TCA54CP_BZOFF
EHOFFEUnit for offset to finish CP_OEHOFFEUNIT3T006CUNITMEINS
FPAVDEarliest scheduled start date (forecast) FPAVDDATS8DATUM
FPAVZEarliest scheduled start time (forecast) FPAVZTIMS6ATIME
FPEDDEarliest scheduled finish date (forecast) FPEDDDATS8DATUM
FPEDZEarliest scheduled finish time (forecast) FPEDZTIMS6ATIME
SPAVDLatest scheduled start date (forecast) SPAVDDATS8DATUM
SPAVZLatest scheduled start time (forecast) SPAVZTIMS6ATIME
SPEDDLatest scheduled finish date (forecast) SPEDDDATS8DATUM
SPEDZLatest scheduled finish time (forecast) SPEDZTIMS6ATIME
BEAZPUnit of processing time (Forecast) BEAZEPUNIT3CUNITEINHEIT
PUFGPTotal float (from forecast) PPUFF_GESMDEC3PUFFER
PUFFPFree float (from forecast) PPUFF_FREIDEC3PUFFER
BEARPProcessing time (forecast) PBEARZEITFLTP16(16) CX_ZEIT
EPANFDispatched start date for operation EPANFDATS8DATUM
EPANZDispatched start time for operation EPANZTIMS6ATIME
EPENDDispatched finish date EPENDDATS8DATUM
EPENZDispatched finish time EPENZTIMS6ATIME
PDAUForecasted duration of activity from confirmation PDAUQUAN5(1) DAUER_4_1
PDAEUnit of the forecasted duration from the confirmation PDAEUNIT3T006CUNITMEINS
KNOTETransportation Connection Points KNOTECHAR10TVKNKNOTN
VSTZWDeadline function VSTZWCHAR4TVTZVSTZW
VSTGADeadline deviation reason VSTGACHAR4TVTGVSTGA
QRASTZEHTTime Unit QRASTZEHTUNIT3Assigned to domainCUNITMEINS
QRASTZFAKTime Factor QRASTZFAKDEC5(2) QPROBEFAK
QRASTMENGQuantity Between Two Inspections QRASTMENGQUAN13(3) MENG13
QRASTEREHGrid Unit of Measure QRASTEREHUNIT3Assigned to domainCUNITMEINS
AUFKTExecution Factor AFAKTDEC3AFAKT
RMNGATotal confirmed rework quantity RMNGAQUAN13(3) MENGV13
ILE01Unit of measure for the activity to be confirmed CO_ISMNGEHUNIT3Assigned to domainCUNITMEINS
ILE02Unit of measure for the activity to be confirmed CO_ISMNGEHUNIT3Assigned to domainCUNITMEINS
ILE03Unit of measure for the activity to be confirmed CO_ISMNGEHUNIT3Assigned to domainCUNITMEINS
ILE04Unit of measure for the activity to be confirmed CO_ISMNGEHUNIT3Assigned to domainCUNITMEINS
ILE05Unit of measure for the activity to be confirmed CO_ISMNGEHUNIT3Assigned to domainCUNITMEINS
ILE06Unit of measure for the activity to be confirmed CO_ISMNGEHUNIT3Assigned to domainCUNITMEINS
RWFAKRework factor (is not used yet) RWFAKDEC5(3) AUSCHUFAK
IPRZ1Confirmed quantity/work for business process CO_IPRZSQUAN13(3) MENGV13
IPRE1Unit of measurement for conf. quantity for business process RU_IPRZEUNIT3Assigned to domainCUNITMEINS
IPRK1No remaining quantity expected for business process RU_IPRZKCHAR1XFELD
TAKTtakt within a line segment LD_TAKTNUMC4LD_TAKT
OPRZ1Remaining quantity for business process OPRZ1QUAN13(3) MENGV13
OPRE1Unit for remaining quantity of business process OPRE1UNIT3Assigned to domainCUNITMEINS
PSPM_INDICATORIndicates PMCS date influence activity scheduling PSPM_INDICATORCHAR1PSPM_INDICATOR
SYSTEM_STATUSSystem Status CO_STTXTCHAR40CHAR40
USER_STATUSField displaying user status CO_ASTTXCHAR40CHAR40
MOBILE_STATUSMobile Object Status /SYCLO/CORE_MOBILE_STATUS_DTECHAR10/SYCLO/CORE_MOBILE_STATUS
PDEST_%EXT Printer for shop papers in external format0
PROJN_%EXT Work breakdown structure elem (WBS element) in external form0
PSPNR_%EXT Standard WBS element in external format0
SCOPE_%EXT Object Class in external format0
WKURS_%EXT Exchange Rate in external format0

Key field Non-key field



How do I retrieve data from SAP structure /SYCLO/PM_AFVC_STR using ABAP code?

As /SYCLO/PM_AFVC_STR is a database structure and not a table it does not store any data in the SAP data dictionary. The ABAP SELECT statement is therefore not appropriate and can not be performed on /SYCLO/PM_AFVC_STR as there is no data to select.

How to access SAP table /SYCLO/PM_AFVC_STR

Within an ECC or HANA version of SAP you can also view further information about /SYCLO/PM_AFVC_STR and the data within it using relevant transactions such as

SE11 (ABAP Dictionary Maintenance)
SM30 (Maintain Table Data)
SE80 (Object Navigator)
SE16 (Data Browser).


Search for further information about these or an SAP related objects



Comments on this SAP object

What made you want to lookup this SAP object? Please tell us what you were looking for and anything you would like to be included on this page!