SAP F1339 Fiori Application to Schedule MRP Runs
F1339 is a standard SAP S/4HANA Fiori application available within SAP and S/4HANA systems depending on your version and release level. With this app you can create and schedule a job for executing your MRP runs. To automate the planning process, the MRP run is carried out on a regular basis so you can use this app to create a job that performs this task for you; reducing your workload by running this task smoothly in the background. During the MRP run, the system checks whether current material demand can be covered by current inventory and expected material receipts. In regenerative planning, the system plans all materials irrespective of whether they have been changed since the last MRP run. In net change planning, the system only plans materials that have changed since the last planning run. If current demand is not covered, the system creates planned orders in the case of in-house production and either purchase requisitions or schedule lines for external procurement. This app is available for the roles: SAP_BR_MATL_PLNR_EXT_PROC (Material Planner - External Procurement)SAP_BR_PRODN_PLNR (Production Planner) ;
Fiori App ID: F1339
App Name: Schedule MRP Runs
App Launcher: Schedule MRP Runs
Type(UI): Transactional(SAP Fiori: Generic Job Scheduling Framework)
Fiori Apps Library: F1339
Device: Desktop, Tablet
T-Code: MD01
ODATA (V4):
Database: HANA DB exclusive
Business Role: Material Planner - External Procurement (SAP_BR_MATL_PLNR_EXT_PROC)
Once configured, Fiori Apps are accessible as tiles on the SAP Fiori Launchpad. You can access the Launchpad either through the traditional SAP GUI using transaction code /UI2/FLP, or directly via a web browser by entering your system URL followed by the path /sap/bc/ui2/flp. Additionally, the SAP Web GUI can be accessed using transaction code WEBGUI, or through a web browser using the URL path /sap/bc/gui/sap/its/webgui/.
Application Configuration
- WebDynpro Application(Config):
- SAPUI5 / BSP: NW_APS_APJ
- ICF Path: /sap/bc/ui5_ui5/sap/nw_aps_apj
- SAP UI5 Component: nw.core.appjobs
Target Mapping
- Semantic Object: MRPRun
- Semantic Action: schedule
Technical Catalog
- Name: SAP_TC_SCM_PP_COMMON
- Description: SAP Production Planning & Shop Floor Control: All Apps
Business Catalog
- Name: SAP_RFM_BC_DC_RPLNMT, SAP_SCM_BC_MRPRUN
- Description: Retail Replenishment - Distribution Center, Production Planning - MRP Runs
Business Group
- Name: SAP_RFM_BCG_DC_RPLNMT, SAP_SCM_BCG_DEM_FCAST_MATL_PLNG
- Description: DC Replenishment, Demand Forecasting and Material Data Planning
Pages/Spaces
- Page Name: SAP_RFM_PG_DC_RPLNMT, SAP_SCM_PG_MATL_PLNG_EXT_PROC, SAP_SCM_PG_PRODN_PLNG
- Page Title: Overview, Material Planning, Material Planning
- Space Name: SAP_RFM_SP_DC_RPLNMT, SAP_SCM_SP_MATL_PNLG_EXT_PROC, SAP_SCM_SP_PRODN_PLNG
- Space Title: DC Replenishment, Material Planning - External Procurement, Production Planning
Business Area / Roles
- Line Of Business: Catering Production, Manufacturing, Mine Operations, Operations, Prefabrication
- Scope: Scheduling Agreements in Procurement (BMR), Production Operations with SAP Manufacturing Execution (2JN), Scheduling Agreement for Subcontracting Procurement (2NX), Subcontracting (BMY), Make-to-Stock Production - Repetitive Manufacturing (BJH), Make-to-Stock - Process Manufacturing Based on Process Order (BJ8), Material Replenishment with Kanban - External Procurement (1E3), Procurement of Materials with Variant Configuration (2XU), Make-to-Stock with Silo Material - Process Manufacturing (3UL), Production Integration - Component Consumption and Receipt in Warehouse (1VB), Make-to-Stock Production - Discrete Manufacturing (BJ5), Make-to-Stock - Process Manufacturing Based on Production Order (2UG), Make-to-Order Production - Finished Goods Sales and Final Assembly (BJE), Make-to-Order Production - Semifinished Goods Planning and Assembly (1BM), Make-to-Stock with Co- and By-Products - Process Manufacturing (3L7), Production Capacity Evaluation (31L), Demand-Driven Replenishment Planning and Execution (2QI), Make-to-Order Production - Process Manufacturing (3OK)
- Relevant role: Material Planner - External Procurement
- Component: PP-FIO-MRP
- Leading business role: SAP_BR_MATL_PLNR_EXT_PROC - Material Planner - External Procurement
- Additional role: SAP_BR_PRODN_PLNR, SAP_BR_RPLNMT_SPCLST_DC_RFM - Production Planner, Replenishment Specialist - Distribution Center (Retail)
Font End Components
- Component Version: UIS4HOP1 900 - SP 0003
- Min SP:
- Product Version: SAP FIORI FOR SAP S/4HANA 2023
- Support Package Stack: 03 (02/2025) FPS
Back End ABAP Components
- Component Version: SAP_BASIS 758 - SP 0000
- Min SP: 0000
- Product Version: SAP S/4HANA PRIVATE CLOUD 2023
- Support Package Stack: 03 (02/2025) FPS
HANA Components
- Component Version:
- Min SP:
- Product Version:
- Support Package Stack:
OData
| OData Service | Version |
| APJ_JOB_MANAGEMENT_SRV | 0001 |
Additional Details:
Lighthouse App: No
A “Lighthouse App” refers to a Fiori application that exemplifies the best of SAP Fiori design principles with high user adoption, optimized UX, business value, and performance. These apps are often redesigned from classic SAP GUI transactions and built natively with Fiori/UI5 to fully leverage the capabilities of the SAP Fiori design system.
Note Collection:
Industry Relevance:
Aerospace and Defense; Automotive; Chemicals; Consumer Products; Cross Industry; Engineering, Construction, and Operations; Industrial Manufacturing; Life Sciences; Mill Products; Mining; OEM (High Tech); Oil, Gas, and Energy; Retail; Semiconductors (High Tech); Travel and Leisure (Travel and Transportation); Wholesale Distribution
Description:
With this app you can create and schedule a job for executing your MRP runs. To automate the planning process, the MRP run is carried out on a regular basis so you can use this app to create a job that performs this task for you; reducing your workload by running this task smoothly in the background. During the MRP run, the system checks whether current material demand can be covered by current inventory and expected material receipts. In regenerative planning, the system plans all materials irrespective of whether they have been changed since the last MRP run. In net change planning, the system only plans materials that have changed since the last planning run. If current demand is not covered, the system creates planned orders in the case of in-house production and either purchase requisitions or schedule lines for external procurement. This app is available for the roles: SAP_BR_MATL_PLNR_EXT_PROC (Material Planner - External Procurement)SAP_BR_PRODN_PLNR (Production Planner)
BEX Query:
Search for further information about these or an SAP related objects