SAP HR_99S_DATE_PLUS_TIME_UNIT Function Module for Calculate date by using a date, period and unit
HR_99S_DATE_PLUS_TIME_UNIT is a standard hr 99s date plus time unit SAP function module available within SAP R/3 or S/4 Hana systems, depending on your version and release level. It is used for Calculate date by using a date, period and unit processing and below is the pattern details for this FM, showing its interface including any import and export parameters, exceptions etc. there is also a full "cut and paste" ABAP pattern code example, along with implementation ABAP coding, documentation and contribution comments specific to this or related objects.
See here to view full function module documentation and code listing for hr 99s date plus time unit FM, simply by entering the name HR_99S_DATE_PLUS_TIME_UNIT into the relevant SAP transaction such as SE37 or SE38.
Function Group: HR99S00_TIME
Program Name: SAPLHR99S00_TIME
Main Program: SAPLHR99S00_TIME
Appliation area:
Release date: N/A
Mode(Normal, Remote etc): Normal Function Module
Update:
Function HR_99S_DATE_PLUS_TIME_UNIT pattern details
In-order to call this FM within your sap programs, simply using the below ABAP pattern details to trigger the function call...or see the full ABAP code listing at the end of this article. You can simply cut and paste this code into your ABAP progrom as it is, including variable declarations.CALL FUNCTION 'HR_99S_DATE_PLUS_TIME_UNIT'"Calculate date by using a date, period and unit.
EXPORTING
I_IDATE = "Start Date
I_TIME = "Duration
I_TIMEUNIT = "TIme Unit (D : Day, M : Month, Y : Year)
IMPORTING
O_IDATE = "Export result date calculated with import parameters
EXCEPTIONS
INVALID_PERIOD = 1 INVALID_ROUND_UP_RULE = 2 INTERNAL_ERROR = 3
IMPORTING Parameters details for HR_99S_DATE_PLUS_TIME_UNIT
I_IDATE - Start Date
Data type: SY-DATUMOptional: No
Call by Reference: No ( called with pass by value option)
I_TIME - Duration
Data type: POptional: No
Call by Reference: No ( called with pass by value option)
I_TIMEUNIT - TIme Unit (D : Day, M : Month, Y : Year)
Data type: CHAR1Optional: No
Call by Reference: Yes
EXPORTING Parameters details for HR_99S_DATE_PLUS_TIME_UNIT
O_IDATE - Export result date calculated with import parameters
Data type: SY-DATUMOptional: No
Call by Reference: No ( called with pass by value option)
EXCEPTIONS details
INVALID_PERIOD -
Data type:Optional: No
Call by Reference: Yes
INVALID_ROUND_UP_RULE -
Data type:Optional: No
Call by Reference: Yes
INTERNAL_ERROR -
Data type:Optional: No
Call by Reference: Yes
Copy and paste ABAP code example for HR_99S_DATE_PLUS_TIME_UNIT Function Module
The ABAP code below is a full code listing to execute function module POPUP_TO_CONFIRM including all data declarations. The code uses the original data declarations rather than the latest in-line data DECLARATION SYNTAX but I have included an ABAP code snippet at the end to show how declarations would look using the newer method of declaring data variables on the fly. This will allow you to compare and fully understand the new inline method. Please note some of the newer syntax such as the @DATA is not available until a later 4.70 service pack (SP8), which i why i have stuck to the origianl for this example.DATA: | ||||
lv_i_idate | TYPE SY-DATUM, " | |||
lv_o_idate | TYPE SY-DATUM, " | |||
lv_invalid_period | TYPE SY, " | |||
lv_i_time | TYPE P, " | |||
lv_invalid_round_up_rule | TYPE P, " | |||
lv_i_timeunit | TYPE CHAR1, " | |||
lv_internal_error | TYPE CHAR1. " |
  CALL FUNCTION 'HR_99S_DATE_PLUS_TIME_UNIT' "Calculate date by using a date, period and unit |
EXPORTING | ||
I_IDATE | = lv_i_idate | |
I_TIME | = lv_i_time | |
I_TIMEUNIT | = lv_i_timeunit | |
IMPORTING | ||
O_IDATE | = lv_o_idate | |
EXCEPTIONS | ||
INVALID_PERIOD = 1 | ||
INVALID_ROUND_UP_RULE = 2 | ||
INTERNAL_ERROR = 3 | ||
. " HR_99S_DATE_PLUS_TIME_UNIT |
ABAP code using 7.40 inline data declarations to call FM HR_99S_DATE_PLUS_TIME_UNIT
The below ABAP code uses the newer in-line data declarations. This allows you to see the coding differences/benefits of the later inline syntax. Please note some of the newer syntax below, such as the @DATA is not available until 4.70 EHP 8."SELECT single DATUM FROM SY INTO @DATA(ld_i_idate). | ||||
"SELECT single DATUM FROM SY INTO @DATA(ld_o_idate). | ||||
Search for further information about these or an SAP related objects