PSHLP_ACTY_BASIC_DATES_ST SAP (Activity Basic Dates Overview) Structure details
Description: Activity Basic Dates Overview
Related tables to PSHLP_ACTY_BASIC_DATES_ST
Access table PSHLP_ACTY_BASIC_DATES_ST
Structure field list including key, data, relationships and ABAP select examples
PSHLP_ACTY_BASIC_DATES_ST is a standard SAP Structure so does not store data like a database table does. It can be used to define the fields of other actual tables or to process "Activity Basic Dates Overview" Information within sap ABAP programs.
This is done by declaring abap internal tables, work areas or database tables based on this Structure. These can then be used to store and process the required data appropriately.
i.e. DATA: wa_PSHLP_ACTY_BASIC_DATES_ST TYPE PSHLP_ACTY_BASIC_DATES_ST.
The PSHLP_ACTY_BASIC_DATES_ST table consists of various fields, each holding specific information or linking keys about Activity Basic Dates Overview data available in SAP. These include EXCEPTION (Icon in text fields (substitute display, alias)), AUFNR (Order Number), VORNR (Operation/Activity Number), UVORN (Suboperation).. See below for full list along with technical details, documentation, text table, check tables, foreign key relationships, conversion routines, relevant tcodes and example ABAP select code etc. .
Delivery Class:Display/Maintenance via tcode SM30: Display/Maintenance Allowed but with Restrictions
SAP enhancement categories: Can Be Enhanced (Deep)
SAP PSHLP_ACTY_BASIC_DATES_ST structure fields - Full list of fields found in SAP data dictionary
Field | Description | Data Element | Data Type | length (Dec) | Check table | Conversion Routine | Domain Name | MemoryID | SHLP |
EXCEPTION | Icon in text fields (substitute display, alias) | ICON_D | CHAR | 4 | Assigned to domain | ICON | |||
AUFNR | Order Number | AUFNR | CHAR | 12 | Assigned to domain | ALPHA | AUFNR | ANR | |
VORNR | Operation/Activity Number | VORNR | CHAR | 4 | NUMCV | VORNR | VGN | ||
UVORN | Suboperation | UVORN | CHAR | 4 | NUMCV | VORNR | |||
ACTY_TYPE_TEXT | Description | AUFTEXT | CHAR | 40 | TEXT40 | ||||
LTXA1 | Operation short text | LTXA1 | CHAR | 40 | TEXT40 | ||||
DDEHN | Indicator: flexible duration | DAUDEHN | CHAR | 1 | X | ||||
KALID | Factory Calendar | WFCID | CHAR | 2 | TFACD | WFCID | FCI | ||
RSTRA | Reduction strategy per operation/activity | RSTRA | CHAR | 2 | T499Q | RSTRA | |||
PLIFZ | Planned Delivery Time in Days | PLIFZ | DEC | 3 | DEC3 | ||||
EPANF | Dispatched start date for operation | EPANF | DATS | 8 | DATUM | ||||
EPANZ | Dispatched start time for operation | EPANZ | TIMS | 6 | ATIME | ||||
ARBEI | Work involved in the activity | ARBEIT | QUAN | 7(1) | ARBEIT | ||||
ARBEH | Unit for work | ARBEITE | UNIT | 3 | T006 | CUNIT | MEINS | ||
OFMNW | Forecasted work (actual + remaining) | OFMNW | QUAN | 7(1) | ARBEIT | ||||
CELLTAB | 0 | ||||||||
COLOR_TAB | 0 | ||||||||
OFFSTB | Offset to sub-operation start | CP_OOFFSTB | QUAN | 5 | VNZTV | ||||
EHOFFB | Unit for offset to start | CP_OEHOFFB | UNIT | 3 | T006 | CUNIT | MEINS | ||
OFFSTE | Offset to sub-operation finish | CP_OOFFSTE | QUAN | 5 | VNZTV | ||||
EHOFFE | Unit for offset to finish | CP_OEHOFFE | UNIT | 3 | T006 | CUNIT | MEINS | ||
DAUNO | Basic Duration | PSHLP_BASIC_DURATION_DE | QUAN | 5(1) | DAUER_4_1 | ||||
ORIG_BASIC_DURATION | Original Basic Duration | PSHLP_ORIG_BASIC_DURATION_DE | QUAN | 5(1) | DAUER_4_1 | ||||
LAST_BASIC_DURATION | Last Basic Duration | PSHLP_LAST_BASIC_DURATION_DE | QUAN | 5(1) | DAUER_4_1 | ||||
DAUNE | Basic Duration Unit | PSHLP_ACTY_BAS_DUR_UNIT_DE | UNIT | 3 | T006 | CUNIT | MEINS | ||
ORIG_BASIC_DUR_UNIT | Unit of Original Basic Duration | PSHLP_ORIG_BAS_DUR_UNIT_DE | UNIT | 3 | CUNIT | EINHEIT | |||
LAST_BASIC_DUR_UNIT | Unit of Last Basic Duration | PSHLP_LAST_BAS_DUR_UNIT_DE | UNIT | 3 | CUNIT | EINHEIT | |||
DAUMI | Minimum activity duration | DAUMIN | QUAN | 5(1) | DAUER_4_1 | ||||
DAUME | Unit for the minimum duration | DAUMINE | UNIT | 3 | T006 | CUNIT | MEINS | ||
FSAVD | Basic Start Date (Earliest) | PSHLP_BAS_EARL_START_DE | DATS | 8 | DATUM | ||||
FSAVZ | Earliest scheduled start: Execution (time) | FSAVZ | TIMS | 6 | ATIME | ||||
ORIG_BASIC_EAR_START | Original Basic Start Date (Earliest) | PSHLP_ORIG_BAS_EARL_START_DE | DATS | 8 | DATUM | ||||
LAST_BASIC_EAR_START | Last Basic Start Date (Earliest) | PSHLP_LAST_BAS_EARL_START_DE | DATS | 8 | DATUM | ||||
FSEDD | Basic Finish Date (Earliest) | PSHLP_BAS_EARL_FINISH_DE | DATS | 8 | DATUM | ||||
FSEDZ | Earliest scheduled finish: Execution (time) | FSEDZ | TIMS | 6 | ATIME | ||||
ORIG_BASIC_EAR_FINISH | Original Basic Finish Date (Earliest) | PSHLP_ORIG_BAS_EARL_FINISH_DE | DATS | 8 | DATUM | ||||
LAST_BASIC_EAR_FINISH | Last Basic Finish Date (Earliest) | PSHLP_LAST_BAS_EARL_FINISH_DE | DATS | 8 | DATUM | ||||
SSAVD | Basic Start Date (Latest) | PSHLP_BASIC_LATEST_START_DE | DATS | 8 | DATUM | ||||
SSAVZ | Latest scheduled start: Execution (time) | SSAVZ | TIMS | 6 | ATIME | ||||
ORIG_BASIC_LAT_START | Original Basic Start Date (Latest) | PSHLP_ORIG_BAS_LATEST_START_DE | DATS | 8 | DATUM | ||||
LAST_BASIC_LAT_START | Last Basic Start Date (Latest) | PSHLP_LAST_BAS_LATEST_START_DE | DATS | 8 | DATUM | ||||
SSEDD | Basic Finish Date (Latest) | PSHLP_BASIC_LATEST_FINISH_DE | DATS | 8 | DATUM | ||||
SSEDZ | Latest scheduled finish: Execution (time) | SSEDZ | TIMS | 6 | ATIME | ||||
ORIG_BASIC_LAT_FINISH | Original Basic Finish Date (Latest) | PSHLP_ORIG_BAS_LATEST_FIN_DE | DATS | 8 | DATUM | ||||
LAST_BASIC_LAT_FINISH | Last Basic Finish Date (Latest) | PSHLP_LAST_BAS_LATEST_FIN_DE | DATS | 8 | DATUM | ||||
PUFGS | Total float | PUFFR_GESM | DEC | 3 | PUFFER | ||||
PUFFR | Free float | PUFFR_FREI | DEC | 3 | PUFFER | ||||
EINSA | Constraint on the basic start date for the activity | EINSCHRA | CHAR | 1 | RESTRIKSTR | ||||
EINSE | Constraint on the finish date of the activity | EINSCHRE | CHAR | 1 | RESTRIKEND | ||||
NTANF | Constraint for activity start (Basic) | VORGABESTD | DATS | 8 | VORGABESTR | ||||
NTANZ | Constraint for activity start time (Basic) | VORGABESTZ | TIMS | 6 | ATIME | ||||
NTEND | Constraint for Finish of Activity (Basic) | VORGABEEND2 | DATS | 8 | VORGABEEND | ||||
NTENZ | Basic finish time of the activity | VORGABEENZ | TIMS | 6 | ATIME | ||||
OBJNR | Object number | J_OBJNR | CHAR | 22 | Assigned to domain | J_OBJNR | ONR | ||
ACTIVE | Ind.: Authorization exists | CN_AUTH | CHAR | 1 | XFELD | ||||
DISPLAY | Ind.: Authorization exists | CN_AUTH | CHAR | 1 | XFELD |
Key field | Non-key field |
How do I retrieve data from SAP structure PSHLP_ACTY_BASIC_DATES_ST using ABAP code?
As PSHLP_ACTY_BASIC_DATES_ST is a database structure and not a table it does not store any data in the SAP data dictionary. The ABAP SELECT statement is therefore not appropriate and can not be performed on PSHLP_ACTY_BASIC_DATES_ST as there is no data to select.How to access SAP table PSHLP_ACTY_BASIC_DATES_ST
Within an ECC or HANA version of SAP you can also view further information about PSHLP_ACTY_BASIC_DATES_ST and the data within it using relevant transactions such asSE11 (ABAP Dictionary Maintenance)
SM30 (Maintain Table Data)
SE80 (Object Navigator)
SE16 (Data Browser).
Search for further information about these or an SAP related objects