ACT01_TIME SAP (Fields from ACT01 with time ref.(for authztn check LDB PSJ)) Structure details
Description: Fields from ACT01 with time ref.(for authztn check LDB PSJ)
Structure field list including key, data, relationships and ABAP select examples
ACT01_TIME is a standard SAP Structure so does not store data like a database table does. It can be used to define the fields of other actual tables or to process "Fields from ACT01 with time ref.(for authztn check LDB PSJ)" Information within sap ABAP programs.
This is done by declaring abap internal tables, work areas or database tables based on this Structure. These can then be used to store and process the required data appropriately.
i.e. DATA: wa_ACT01_TIME TYPE ACT01_TIME.
The ACT01_TIME table consists of various fields, each holding specific information or linking keys about Fields from ACT01 with time ref.(for authztn check LDB PSJ) data available in SAP. These include ZMINU (Minimum overlap time), ZEIMB (Unit for the minimum processing time), ZMINB (Minimum processing time), ZEILM (Unit for the maximum wait time).. See below for full list along with technical details, documentation, text table, check tables, foreign key relationships, conversion routines, relevant tcodes and example ABAP select code etc. .
Delivery Class:Display/Maintenance via tcode SM30: Display/Maintenance Allowed but with Restrictions
SAP enhancement categories: Not classified
SAP ACT01_TIME structure fields - Full list of fields found in SAP data dictionary
Field | Description | Data Element | Data Type | length (Dec) | Check table | Conversion Routine | Domain Name | MemoryID | SHLP |
ZEIMU | Unit for the minimum overlap time | DZEIMU | UNIT | 3 | Assigned to domain | CUNIT | MEINS | ||
ZMINU | Minimum overlap time | DZMINU | QUAN | 9(3) | VGWRT | ||||
ZEIMB | Unit for the minimum processing time | DZEIMB | UNIT | 3 | Assigned to domain | CUNIT | MEINS | ||
ZMINB | Minimum processing time | DZMINB | QUAN | 9(3) | VGWRT | ||||
ZEILM | Unit for the maximum wait time | DZEILM | UNIT | 3 | Assigned to domain | CUNIT | MEINS | ||
ZLMAX | Maximum wait time | DZLMAX | QUAN | 9(3) | VGWRT | ||||
ZEILP | Unit for the required wait time | DZEILP | UNIT | 3 | Assigned to domain | CUNIT | MEINS | ||
ZLPRO | Minimum wait time | DZLPRO | QUAN | 9(3) | VGWRT | ||||
ZEIWN | Unit for the standard queue time | DZEIWN | UNIT | 3 | Assigned to domain | CUNIT | MEINS | ||
ZWNOR | Standard queue time | DZWNOR | QUAN | 9(3) | VGWRT | ||||
ZEIWM | Unit for the minumum queue time | DZEIWM | UNIT | 3 | Assigned to domain | CUNIT | MEINS | ||
ZWMIN | Minimum queue time | DZWMIN | QUAN | 9(3) | VGWRT | ||||
ZEITN | Unit for the standard move time | DZEITN | UNIT | 3 | Assigned to domain | CUNIT | MEINS | ||
ZTNOR | Standard move time | DZTNOR | QUAN | 9(3) | VGWRT | ||||
ZEITM | Unit for the minimum move time | DZEITM | UNIT | 3 | Assigned to domain | CUNIT | MEINS | ||
ZTMIN | Minimum move time | DZTMIN | QUAN | 9(3) | VGWRT | ||||
PLIFZ | Planned Delivery Time in Days | PLIFZ | DEC | 3 | DEC3 | ||||
DAUNO | Normal duration of the activity | DAUNOR | QUAN | 5(1) | DAUER_4_1 | ||||
DAUNE | Normal duration/unit | DAUNORE | UNIT | 3 | Assigned to domain | CUNIT | MEINS | ||
DAUMI | Minimum activity duration | DAUMIN | QUAN | 5(1) | DAUER_4_1 | ||||
DAUME | Unit for the minimum duration | DAUMINE | UNIT | 3 | Assigned to domain | CUNIT | MEINS | ||
EINSA | Constraint on the basic start date for the activity | EINSCHRA | CHAR | 1 | RESTRIKSTR | ||||
EINSE | Constraint on the finish date of the activity | EINSCHRE | CHAR | 1 | RESTRIKEND | ||||
FSAVD | Earliest scheduled start: Execution (date) | FSAVD | DATS | 8 | DATUM | ||||
FSAVZ | Earliest scheduled start: Execution (time) | FSAVZ | TIMS | 6 | ATIME | ||||
FSSBD | Earliest scheduled start: Processing (date) | FSSBD | DATS | 8 | DATUM | ||||
FSSBZ | Earliest scheduled start: Processing (time) | FSSBZ | TIMS | 6 | ATIME | ||||
FSSAD | Earliest scheduled start: Teardown (date) | FSSAD | DATS | 8 | DATUM | ||||
FSSAZ | Earliest scheduled start: Teardown (time) | FSSAZ | TIMS | 6 | ATIME | ||||
FSEDD | Earliest scheduled finish: Execution (date) | FSEDD | DATS | 8 | DATUM | ||||
FSEDZ | Earliest scheduled finish: Execution (time) | FSEDZ | TIMS | 6 | ATIME | ||||
FSSLD | Earliest scheduled start: Wait (date) | FSSLD | DATS | 8 | DATUM | ||||
FSSLZ | Earliest scheduled start: Wait (time) | FSSLZ | TIMS | 6 | ATIME | ||||
FSELD | Earliest scheduled finish: Wait (date) | FSELD | DATS | 8 | DATUM | ||||
FSELZ | Earliest scheduled finish: Wait (time) | FSELZ | TIMS | 6 | ATIME | ||||
SSAVD | Latest scheduled start: Execution (date) | SSAVD | DATS | 8 | DATUM | ||||
SSAVZ | Latest scheduled start: Execution (time) | SSAVZ | TIMS | 6 | ATIME | ||||
SSSBD | Latest scheduled start: Processing (date) | SSSBD | DATS | 8 | DATUM | ||||
SSSBZ | Latest scheduled start: Processing (time) | SSSBZ | TIMS | 6 | ATIME | ||||
SSSAD | Latest scheduled start: Teardown (date) | SSSAD | DATS | 8 | DATUM | ||||
SSSAZ | Latest scheduled start: Teardown (time) | SSSAZ | TIMS | 6 | ATIME | ||||
SSEDD | Latest scheduled finish: Execution (date) | SSEDD | DATS | 8 | DATUM | ||||
SSEDZ | Latest scheduled finish: Execution (time) | SSEDZ | TIMS | 6 | ATIME | ||||
SSSLD | Latest scheduled start: Wait time (date) | SSSLD | DATS | 8 | DATUM | ||||
SSSLZ | Latest scheduled start: Wait time | SSSLZ | TIMS | 6 | ATIME | ||||
SSELD | Latest scheduled finish: Wait time (date) | SSELD | DATS | 8 | DATUM | ||||
SSELZ | Latest scheduled finish: Wait time | SSELZ | TIMS | 6 | ATIME | ||||
ISAVD | Actual operation start (date) | ISAVD | DATS | 8 | DATUM | ||||
IEAVD | Actual finish of operation (date) | IEAVD | DATS | 8 | DATUM | ||||
ISDD | Actual start: Execution (date) | ISDD | DATS | 8 | DATUM | ||||
ISDZ | Actual start: Execution/setup (time) | ISDZ | TIMS | 6 | ATIME | ||||
IERD | Actual finish: Setup (date) | IERD | DATS | 8 | DATUM | ||||
IERZ | Actual finish: Setup (time) | IERZ | TIMS | 6 | ATIME | ||||
ISBD | Actual start: Processing (date) | ISBD | DATS | 8 | DATUM | ||||
ISBZ | Actual start: Processing (time) | ISBZ | TIMS | 6 | ATIME | ||||
IEBD | Actual finish: Processing (date) | IEBD | DATS | 8 | DATUM | ||||
IEBZ | Actual processing finish (time) | IEBZ | TIMS | 6 | ATIME | ||||
ISAD | Actual start: Teardown (date) | ISAD | DATS | 8 | DATUM | ||||
ISAZ | Actual start: Teardown (time) | ISAZ | TIMS | 6 | ATIME | ||||
IEDD | Actual finish: Execution (date) | IEDD | DATS | 8 | DATUM | EDR | |||
IEDZ | Actual finish: Execution (time) | IEDZ | TIMS | 6 | ATIME | EZR | |||
PEDD | Forecast finish date of operation from confirmation | CO_PEDD | DATS | 8 | DATUM | ||||
PEDZ | Forecast finish time of operation from confirmation | CO_PEDZ | TIMS | 6 | ATIME | ||||
PUFFR | Free float | PUFFR_FREI | DEC | 3 | PUFFER | ||||
PUFGS | Total float | PUFFR_GESM | DEC | 3 | PUFFER | ||||
NTANF | Constraint for activity start (Basic) | VORGABESTD | DATS | 8 | VORGABESTR | ||||
NTANZ | Constraint for activity start time (Basic) | VORGABESTZ | TIMS | 6 | ATIME | ||||
NTEND | Constraint for finish of activity (Basic) | VORGABEEND | DATS | 8 | VORGABEEND | ||||
NTENZ | Basic finish time of the activity | VORGABEENZ | TIMS | 6 | ATIME | ||||
EWSTD | Forecasted start date for the activity | EWSTARTD | DATS | 8 | DATUM | ||||
EWSTZ | Forecast start time of the activity | EWSTARTZ | TIMS | 6 | ATIME | ||||
EWEND | Forecast finish date | EWENDED | DATS | 8 | DATUM | ||||
EWENZ | Forecast finish time for the activity | EWENDEZ | TIMS | 6 | ATIME | ||||
EWDAN | Normal duration (from forecast) of activity | EWDAN | QUAN | 5(1) | DAUER_4_1 | ||||
EWDNE | Unit for forecast normal duration | EWDNE | UNIT | 3 | Assigned to domain | CUNIT | MEINS | ||
EWDAM | Minimum duration (from forecast) for activity | EWDAM | QUAN | 5(1) | DAUER_4_1 | ||||
EWDME | Unit for forecast minimum duration | EWDME | UNIT | 3 | Assigned to domain | CUNIT | MEINS | ||
EWSTE | Forecast date constraint on activity finish | PS_RESTE | CHAR | 1 | RESTRIKEND | ||||
EWSTA | Forecast date constraint on activity start | PS_RESTA | CHAR | 1 | RESTRIKSTR | ||||
WARTZ | Queue time used for scheduling | WARTEZEIT | FLTP | 16(16) | CX_ZEIT | ||||
WRTZE | Unit of measure for queue time | WTRZE | UNIT | 3 | CUNIT | EINHEIT | |||
RUEST | Setup time | RUEST | FLTP | 16(16) | CX_ZEIT | ||||
RSTZE | Unit of measure for setup time | RSTZE | UNIT | 3 | CUNIT | EINHEIT | |||
BEARZ | Processing time | BEARZEIT | FLTP | 16(16) | CX_ZEIT | ||||
BEAZE | Unit of measure for processing time | BEAZE | UNIT | 3 | CUNIT | EINHEIT | |||
ABRUE | Teardown | ABRUE | FLTP | 16(16) | CX_ZEIT | ||||
ARUZE | Unit of measure for teardown | ARUZE | UNIT | 3 | CUNIT | EINHEIT | |||
LIEGZ | Wait time used for scheduling | LIEGEZEIT | FLTP | 16(16) | CX_ZEIT | ||||
LIGZE | Unit of measure for wait time | LIGZE | UNIT | 3 | CUNIT | EINHEIT | |||
TRANZ | Move time used for scheduling | TRANSZEIT | FLTP | 16(16) | CX_ZEIT | ||||
TRAZE | Unit of measure for move time | TRAZE | UNIT | 3 | CUNIT | EINHEIT | |||
ISERH | Confirmed break time | ISERH | QUAN | 9(3) | VGWRT | ||||
EHOFFB | Unit for offset to start | CP_OEHOFFB | UNIT | 3 | Assigned to domain | CUNIT | MEINS | ||
OFFSTB | Offset to sub-operation start | CP_OOFFSTB | QUAN | 5 | VNZTV | ||||
OFFSTE | Offset to sub-operation finish | CP_OOFFSTE | QUAN | 5 | VNZTV | ||||
BZOFFE | Reference date for finish of sub-operation | CP_OBZOFFE | CHAR | 2 | Assigned to domain | CP_BZOFF | |||
EHOFFE | Unit for offset to finish | CP_OEHOFFE | UNIT | 3 | Assigned to domain | CUNIT | MEINS | ||
FPAVD | Earliest scheduled start date (forecast) | FPAVD | DATS | 8 | DATUM | ||||
FPAVZ | Earliest scheduled start time (forecast) | FPAVZ | TIMS | 6 | ATIME | ||||
FPEDD | Earliest scheduled finish date (forecast) | FPEDD | DATS | 8 | DATUM | ||||
FPEDZ | Earliest scheduled finish time (forecast) | FPEDZ | TIMS | 6 | ATIME | ||||
SPAVD | Latest scheduled start date (forecast) | SPAVD | DATS | 8 | DATUM | ||||
SPAVZ | Latest scheduled start time (forecast) | SPAVZ | TIMS | 6 | ATIME | ||||
SPEDD | Latest scheduled finish date (forecast) | SPEDD | DATS | 8 | DATUM | ||||
SPEDZ | Latest scheduled finish time (forecast) | SPEDZ | TIMS | 6 | ATIME | ||||
BEAZP | Unit of processing time (Forecast) | BEAZEP | UNIT | 3 | CUNIT | EINHEIT | |||
PUFGP | Total float (from forecast) | PPUFF_GESM | DEC | 3 | PUFFER | ||||
PUFFP | Free float (from forecast) | PPUFF_FREI | DEC | 3 | PUFFER | ||||
BEARP | Processing time (forecast) | PBEARZEIT | FLTP | 16(16) | CX_ZEIT | ||||
EPANF | Dispatched start date for operation | EPANF | DATS | 8 | DATUM | ||||
EPANZ | Dispatched start time for operation | EPANZ | TIMS | 6 | ATIME | ||||
EPEND | Dispatched finish date | EPEND | DATS | 8 | DATUM | ||||
EPENZ | Dispatched finish time | EPENZ | TIMS | 6 | ATIME | ||||
PDAU | Forecasted duration of activity from confirmation | PDAU | QUAN | 5(1) | DAUER_4_1 | ||||
PDAE | Unit of the forecasted duration from the confirmation | PDAE | UNIT | 3 | Assigned to domain | CUNIT | MEINS | ||
APLFZ | Planned Delivery Time in Days | PLIFZ | DEC | 3 | DEC3 | ||||
DAWAR | Queue time | CO_DAUWAR | QUAN | 7(1) | DAUER_6_1 | ||||
DARUE | Setup time | CO_DAURUE | QUAN | 7(1) | DAUER_6_1 | ||||
DABEA | Processing time | CO_DAUBEA | QUAN | 7(1) | DAUER_6_1 | ||||
DAABR | Teardown time | CO_DAUABR | QUAN | 7(1) | DAUER_6_1 | ||||
DALIE | Wait time | CO_DAULIE | QUAN | 7(1) | DAUER_6_1 | ||||
DAPBE | Duration of processing time (forecast) | CO_DAUBEAP | QUAN | 7(1) | DAUER_6_1 | ||||
DATRA | Duration of move time | CO_DAUTRA | QUAN | 7(1) | DAUER_6_1 | ||||
DADRF | Duration of execution time (setup + processing + teardown) | CO_DAUDRF | QUAN | 7(1) | DAUER_6_1 | ||||
FSEVD | Earliest finish of operation (date) | FSEVD | DATS | 8 | DATUM | ||||
FSEVZ | Earliest finish of operation (time) | FSEVZ | TIMS | 6 | ATIME | ||||
SSEVD | Latest finish date of operation | SSEVD | DATS | 8 | DATUM | ||||
SSEVZ | Latest operation finish (time) | SSEVZ | TIMS | 6 | ATIME |
Key field | Non-key field |
How do I retrieve data from SAP structure ACT01_TIME using ABAP code?
As ACT01_TIME is a database structure and not a table it does not store any data in the SAP data dictionary. The ABAP SELECT statement is therefore not appropriate and can not be performed on ACT01_TIME as there is no data to select.How to access SAP table ACT01_TIME
Within an ECC or HANA version of SAP you can also view further information about ACT01_TIME and the data within it using relevant transactions such asSE11 (ABAP Dictionary Maintenance)
SM30 (Maintain Table Data)
SE80 (Object Navigator)
SE16 (Data Browser).
Search for further information about these or an SAP related objects