SPSINFO_FC101 SAP (Structure for Project Structure Overview Reporting) Structure details

Dictionary Type: Structure
Description: Structure for Project Structure Overview Reporting




ABAP Code to SELECT data from SPSINFO_FC101
Related tables to SPSINFO_FC101
Access table SPSINFO_FC101




Structure field list including key, data, relationships and ABAP select examples

SPSINFO_FC101 is a standard SAP Structure so does not store data like a database table does. It can be used to define the fields of other actual tables or to process "Structure for Project Structure Overview Reporting" Information within sap ABAP programs.

This is done by declaring abap internal tables, work areas or database tables based on this Structure. These can then be used to store and process the required data appropriately.

i.e. DATA: wa_SPSINFO_FC101 TYPE SPSINFO_FC101.

The SPSINFO_FC101 table consists of various fields, each holding specific information or linking keys about Structure for Project Structure Overview Reporting data available in SAP. These include ARNUMMER (Archiving Session Number), VSGRUPPE (Group for a project version), VSNUMMER (Number or description of a version), OBJEKTID (ID/Object key).. See below for full list along with technical details, documentation, text table, check tables, foreign key relationships, conversion routines, relevant tcodes and example ABAP select code etc. .

Delivery Class:
Display/Maintenance via tcode SM30: Display/Maintenance Allowed but with Restrictions
SAP enhancement categories: Can be enhanced (character-type or numeric)


SAP SPSINFO_FC101 structure fields - Full list of fields found in SAP data dictionary

Field Description Data Element Data Type length (Dec) Check table Conversion Routine Domain Name MemoryID SHLP
ARNUMMERArchiving Session Number ADMI_RUN_DCHAR6ADMI_RUN
VSGRUPPEGroup for a project version VSGRUPPECHAR20TEXT20
VSNUMMERNumber or description of a version VSNMRCHAR12VSNMRVS2
OBJEKTIDID/Object key PS_IS_IDCHAR40CHAR40
KURZTEXTShort text/description of the object KURZTEXTCHAR40TEXT40
OBJEKTTYPObject Type Text OTEXTCHAR25TEXT25
ECKSTBasic start date PS_ECKSTDATS8DATUM
ECKENFinish date (from basic dates) PS_ECKENDATS8DATUM
PROGSTForecast start date PS_PROGSTDATS8DATUM
PROGENForecast finish date PS_PROGENDATS8DATUM
TESTFREarliest scheduled start (from basic dates) PS_TESTFRDATS8DATUM
TEENFREarliest scheduled finish (from basic dates) PS_TEENFRDATS8DATUM
TESTSPLatest scheduled start (from basic dates) PS_TESTSPDATS8DATUM
TEENSPLatest scheduled finish (from basic dates) PS_TEENSPDATS8DATUM
TPSTFREarliest scheduled start (from forecast dates) PS_TPSTFRDATS8DATUM
TPENFREarliest scheduled finish (from forecast dates) PS_TPENFRDATS8DATUM
TPSTSPLatest scheduled start (from forecast dates) PS_TPSTSPDATS8DATUM
TPENSPLatest scheduled finish (from forecast dates) PS_TPENSPDATS8DATUM
VORLSTTentative start date PS_VORLSTDATS8DATUM
VORLENTentative finish date PS_VORLENDATS8DATUM
ISTSTActual start date PS_ISTSTDATS8DATUM
ISTENActual finish date PS_ISTENDATS8DATUM
DATFSEarliest start date PS_DATFSDATS8DATUM
DATSELatest finish date PS_DATSEDATS8DATUM
EDAUERDuration PS_EDAUER_2QUAN10(1) DAUER_9_1
EDAUEHActual duration unit PS_DAUEHUNIT3Assigned to domainCUNITMEINS
PDAUERForecast duration PS_PDAUER_VZQUAN10(1) PS_DAUER_VZ
PDAUEHActual duration unit PS_DAUEHUNIT3Assigned to domainCUNITMEINS
VDAUERTentative duration PS_VDAUER_VZQUAN10(1) PS_DAUER_VZ
VDAUEHActual duration unit PS_DAUEHUNIT3Assigned to domainCUNITMEINS
IDAUERActual duration PS_IDAUER_VZQUAN10(1) PS_DAUER_VZ
IDAUEHActual duration unit PS_DAUEHUNIT3Assigned to domainCUNITMEINS
RDAUERRemaining duration PS_RDAUER_VZQUAN10(1) PS_DAUER_VZ
RDAUEHActual duration unit PS_DAUEHUNIT3Assigned to domainCUNITMEINS
ABARBDProcessing % of duration PS_ABARBDNUMC3CO_ABARB
EARBEIWork PS_EARBEI_2QUAN13(3) PS_ARBEIT_2
EARBEHUnit for work PS_ARBEHUNIT3Assigned to domainCUNITMEINS
PARBEIForecast work PS_PARBEI_VZQUAN13(3) PS_ARBEIT_VZ
PARBEHUnit for work PS_ARBEHUNIT3Assigned to domainCUNITMEINS
VARBEITentative work PS_VARBEI_VZQUAN13(3) PS_ARBEIT_VZ
VARBEHUnit for work PS_ARBEHUNIT3Assigned to domainCUNITMEINS
IARBEIActual work PS_IARBEI_VZQUAN13(3) PS_ARBEIT_VZ
IARBEHUnit for work PS_ARBEHUNIT3Assigned to domainCUNITMEINS
RARBEIRemaining work PS_RARBEI_VZQUAN13(3) PS_ARBEIT_VZ
RARBEHUnit for work PS_ARBEHUNIT3Assigned to domainCUNITMEINS
ABARBAPercent of completion for work PS_ABARBANUMC3CO_ABARB
SLWIDKey word ID for user-defined fields SLWIDCHAR7Assigned to domainSLWID
USR00User field with 20 characters USRCHAR20CHAR20USRCHAR20
USR01User field with 20 characters USRCHAR20CHAR20USRCHAR20
USR02User field with 10 characters USRCHAR10CHAR10USRCHAR10
USR03User field with 10 characters USRCHAR10CHAR10USRCHAR10
USR04User field for quantity (length 10.3) USRQUAN13QUAN13(3) USRQUAN13
USE04User field: Unit for quantity fields USRUNITUNIT3Assigned to domainCUNITMEINS
USR05User field for quantity (length 10.3) USRQUAN13QUAN13(3) USRQUAN13
USE05User field: Unit for quantity fields USRUNITUNIT3Assigned to domainCUNITMEINS
USR06User-defined field for values (length 10,3) USRCURR13CURR13(3) USRCURR13
USE06User field: Unit for value fields USRCUKYCUKY5Assigned to domainWAERS
USR07User-defined field for values (length 10,3) USRCURR13CURR13(3) USRCURR13
USE07User field: Unit for value fields USRCUKYCUKY5Assigned to domainWAERS
USR08User field for date USRDATEDATS8USRDATE
USR09User field for date USRDATEDATS8USRDATE
USR10User-defined field: Indicator for reports USRFLAGCHAR1FLAG
USR11User-defined field: Indicator for reports USRFLAGCHAR1FLAG
VERNRNumber of responsible person (project mgr)/MRP controller PS_VERNR_CCHAR8CHAR8
VERNAName of responsible person (Project manager) PS_VERNACHAR25PS_VERNA
AENNRChange Number AENNRCHAR12Assigned to domainAENNRAENNRAEN
WERKSPlant WERKS_DCHAR4Assigned to domainWERKSWRKH_T001W_C
ARBPLWork center ARBPLCHAR8ARBPLAGR
KALIDFactory Calendar WFCIDCHAR2Assigned to domainWFCIDFCI
TXTSPLanguage: The long text was stored in this language LTXSPLANG1Assigned to domainISOLASPRAS
PSPRIPriority NW_PRIOCHAR1Assigned to domainNW_PRIO
STATXTEdited status text STATUSTEXT_2CHAR80CHAR80
FRUEHERActual start is before earliest scheduled start FRUEHER_2QUAN10(1) DAUER_9_1
SPAETERActual Finish/Planned Finish After Latest Scheduled Finish SPAETER_2QUAN10(1) DAUER_9_1
VERZUGDuration After Latest Scheduled Finish VERZUG_2QUAN10(1) DAUER_9_1
VORBEIDuration After Earliest Scheduled Start VORBEI_2QUAN10(1) DAUER_9_1
VEINHUnit for Duration of the Delay VERZ_EINHTUNIT3Assigned to domainCUNITMEINS
PUFGSTotal float PUFFR_GESMDEC3PUFFER
PUFFRFree float PUFFR_FREIDEC3PUFFER
PUFGPTotal float (from forecast) PPUFF_GESMDEC3PUFFER
PUFFPFree float (from forecast) PPUFF_FREIDEC3PUFFER
KOKRSControlling Area KOKRSCHAR4Assigned to domainCACCDCAC
BUKRSCompany Code BUKRSCHAR4Assigned to domainBUKRSBUKC_T001
GSBERBusiness Area GSBERCHAR4Assigned to domainGSBERGSB
WAERSCurrency Key WAERSCUKY5Assigned to domainWAERSFWS
OWAERSObject currency for network activity OWAERSCUKY5Assigned to domainWAERS
MEINHUnit of Measure for Display MEINHUNIT3Assigned to domainCUNITMEINS
PROKSTPLANCurrent project cost plan PROKSTPLANCURR15(2) WERTV8
PROKSTPLN2Project cost plan (version 2) PROKSTPLN2CURR15(2) WERTV8
AUFKSTPLANCurrent order cost plan AUFKSTPLANCURR15(2) WERTV8
AUFKSTPLN2Order cost plan (version 2) AUFKSTPLN2CURR15(2) WERTV8
PROERLPLANCurrent project revenue plan PROERLPLANCURR15(2) WERTV8
PROERLPLN2Project revenue plan (version 2) PROERLPLN2CURR15(2) WERTV8
AUFERLPLANCurrent order revenue plan AUFERLPLANCURR15(2) WERTV8
AUFERLPLN2Order revenue plan (version 2) AUFERLPLN2CURR15(2) WERTV8
KREDFINPLNCurrent financial budget, credit side KREDFINPLNCURR15(2) WERTV8
DEBFINPLNCurrent cash budget, debit side DEBFINPLNCURR15(2) WERTV8
BUDGETBudget of a Measure (App. Request Variant Was Replaced) BUDGETCURR15(2) WERTV8
FREIGABERelease FREIGABECURR15(2) WERTV8
AUFTRANFResidual order plan AUFTRANFCURR15(2) WERTV8
FESTPROBLFixed price commitment FESTPROBLCURR15(2) WERTV8
KSTOBLGESTotal cost commitment KSTOBLGESCURR15(2) WERTV8
ISTKOSTENActual costs ISTKOSTENCURR15(2) WERTV8
ISTERLOESEActual revenues ISTERLOESECURR15(2) WERTV8
KZHLNGTotal credit side payments (down payments and payments) KZHLNGCURR15(2) WERTV8
DZHLNGTotal debit side payments (down payments and payments) DZHLNGCURR15(2) WERTV8
.INCLU--AP 0
PROKSTPLAN_OCCurrent Project Cost Plan in Object Currency PROKSTPLANOCCURR15(2) WERTV8
PROKSTPLN2_OCProject Cost Plan (Version 2) in Object Currency PROKSTPLN2OCCURR15(2) WERTV8
AUFKSTPLAN_OCCurrent Order Cost Plan in Object Currency AUFKSTPLANOCCURR15(2) WERTV8
AUFKSTPLN2_OCOrder Cost Plan (Version 2) in Object Currency AUFKSTPLN2OCCURR15(2) WERTV8
PROERLPLAN_OCCurrent Project Revenue Plan in Object Currency PROERLPLANOCCURR15(2) WERTV8
PROERLPLN2_OCProject Revenue Plan (Version 2) in Object Currency PROERLPLN2OCCURR15(2) WERTV8
AUFERLPLAN_OCCurrent Order Revenue Plan in Object Currency AUFERLPLANOCCURR15(2) WERTV8
AUFERLPLN2_OCOrder Revenue Plan (Version 2) in Object Currency AUFERLPLN2OCCURR15(2) WERTV8
KREDFINPLN_OCCurrent Credit Side Cash Budget in Object Currency KREDFINPLNOCCURR15(2) WERTV8
DEBFINPLN_OCCurrent Debit Side Cash Budget in Object Currency DEBFINPLNOCCURR15(2) WERTV8
BUDGET_OCAppropriation Budget (Appr.Request Variant Replaced) in OC BUDGETOCCURR15(2) WERTV8
FREIGABE_OCRelease in Object Currency FREIGABEOCCURR15(2) WERTV8
AUFTRANF_OCResidual Order Plan in Object Currency AUFTRANFOCCURR15(2) WERTV8
FESTPROBL_OCFixed Price Commitment in Object Currency FESTPROBLOCCURR15(2) WERTV8
KSTOBLGES_OCTotal Cost Commitment in Object Currency KSTOBLGESOCCURR15(2) WERTV8
ISTKOSTEN_OCAct. Costs in Object Currency ISTKOSTENOCCURR15(2) WERTV8
ISTERLOESE_OCActual Revenues in Object Currency ISTERLOESEOCCURR15(2) WERTV8
KZHLNG_OCTotal Vendor Payments (Down Payments and Payments) OC KZHLNGOCCURR15(2) WERTV8
DZHLNG_OCTotal Customer Payments (Down Payments and Payments) OC DZHLNGOCCURR15(2) WERTV8
EV_PLAN_ORG1Budgeted cost of work scheduled EVPLANORG1CURR15(2) WERTV8
EV_ACT_ORG1Budgeted cost of work performed EVACTORG1CURR15(2) WERTV8
EV_ACT_CORR1Budgeted cost of work performed, adjusted EVACTCORR1CURR15(2) WERTV8
EV_PLAN_QUAN_ORG1Budgeted cost of work scheduled, quantity EVPLANQUANORG1QUAN15(3) CQUA8
EV_PLAN_QUAN_ORG1_UNITBCWS, Unit of Measure EV_PLAN_QUAN_ORG1_UNITUNIT3Assigned to domainCUNITMEINS
EV_ACT_QUAN_ORG1Budgeted cost of work performed, quantity EVACTQUANORG1QUAN15(3) CQUA8
EV_ACT_QUAN_ORG1_UNITBCWP, Unit of Measure EV_ACT_QUAN_ORG1_UNITUNIT3Assigned to domainCUNITMEINS
EV_ACT_QUAN_CORR1Budgeted cost of work performed, adjusted quantity EVACTQUANCORR1QUAN15(3) CQUA8
EV_ACT_QUAN_CORR1_UNITBCWP, Adjusted Quantity (Unit) EV_ACT_QUAN_CORR1_UNITUNIT3Assigned to domainCUNITMEINS
POC_PLAN_ORG_AGG1Aggregate planned percentage of completion POCPLANORGAGG1DEC6(3) EV_PROGRES
POC_PLAN_ORG_NAGG1Non-aggregated planned percentage of completion POCPLANORGNAGG1DEC6(3) EV_PROGRES
POC_ACT_ORG_AGG1Aggregated actual POC POCACTORGAGG1DEC6(3) EV_PROGRES
POC_ACT_ORG_NAGG1Non-aggregated actual percentage of completion POCACTORGNAGG1DEC6(3) EV_PROGRES
POC_ACT_CORR_AGG1Adjusted aggregated actual POC POCACTCORRAGG1DEC6(3) EV_PROGRES
POC_ACT_CORR_NAGG1Adjusted non-aggregated actual percentage of completion POCACTCORRNAGG1DEC6(3) EV_PROGRES
EV_COST_VAR_ORGCost Variance Based on EV_ACT_ORG1 EWALVARORGCURR15(2) WERTV8
EV_SCHED_VAR_ORGSchedule Variance Based on EV_ACT_ORG1 EVSCHVARORGCURR15(2) WERTV8
EV_COST_INDX_ORGCost Index Based on EV_ACT_ORG1 EWALINDXORGDEC7(2) DEC5_2
EV_SCHED_INDX_ORGDate Index Based on POC_ACT_ORG_AGG1 EVSCHINDXORGDEC7(2) DEC5_2
EV_COST_VAR_CORRCost Variance Based on EV_ACT_CORR1 EWALVARCORRCURR15(2) WERTV8
EV_SCHED_VAR_CORRSchedule Variance Based on EV_ACT_CORR1 EVSCHVARCORRCURR15(2) WERTV8
EV_COST_INDX_CORRCost Index Based on EV_ACT_CORR1 EWALINDXCORRDEC7(2) DEC5_2
EV_SCHED_INDX_CORRDate Index Based on POC_ACT_CORR_AGG1 EVSCHINDXCORRDEC7(2) DEC5_2
.INCLU--AP 0
EV_PLAN_ORG1_OCBudgeted cost of work scheduled EVPLANORG1CURR15(2) WERTV8
EV_ACT_ORG1_OCBudgeted cost of work performed EVACTORG1CURR15(2) WERTV8
EV_ACT_CORR1_OCBudgeted cost of work performed, adjusted EVACTCORR1CURR15(2) WERTV8
EV_COST_VAR_ORG_OCCost Variance Based on EV_ACT_ORG1 EWALVARORGCURR15(2) WERTV8
EV_SCHED_VAR_ORG_OCSchedule Variance Based on EV_ACT_ORG1 EVSCHVARORGCURR15(2) WERTV8
EV_SCHED_VAR_CORR_OCCost Variance Based on EV_ACT_CORR1 EWALVARCORRCURR15(2) WERTV8
EV_COST_VAR_CORR_OCSchedule Variance Based on EV_ACT_CORR1 EVSCHVARCORRCURR15(2) WERTV8
EVMET_P1Measurement method for PS progress analysis (plan) EV_METHOD_PLNCHAR10CHAR10
EVMET_A1Measurement method in PS progress analysis (actual) EV_METHOD_ACTCHAR10CHAR10
EVGEWAggregation weight for POC (PS progress) EV_WEIGHTDDEC8DEC8
OBJNRObject number J_OBJNRCHAR22Assigned to domainJ_OBJNRONR
HIERSTUFEClassification: Level in Hierarchy HIERSTUFEINT410INT4
TABNAMETable Name TABNAMECHAR30Assigned to domainAS4TABDTB
TABINDEXEntry (line number on a list) PS_ENTRYINT410SYST_LONG
DIFFERENZ Absolute difference0
DIFFPROZ Percentage difference0
VERSFELD Versions data0

Key field Non-key field



How do I retrieve data from SAP structure SPSINFO_FC101 using ABAP code?

As SPSINFO_FC101 is a database structure and not a table it does not store any data in the SAP data dictionary. The ABAP SELECT statement is therefore not appropriate and can not be performed on SPSINFO_FC101 as there is no data to select.

How to access SAP table SPSINFO_FC101

Within an ECC or HANA version of SAP you can also view further information about SPSINFO_FC101 and the data within it using relevant transactions such as

SE11 (ABAP Dictionary Maintenance)
SM30 (Maintain Table Data)
SE80 (Object Navigator)
SE16 (Data Browser).


Search for further information about these or an SAP related objects



Comments on this SAP object

What made you want to lookup this SAP object? Please tell us what you were looking for and anything you would like to be included on this page!