RPM_TS_PROJECT_ARCH_EXT SAP (RPM: extended structure for archived project data) Structure details

Dictionary Type: Structure
Description: RPM: extended structure for archived project data




ABAP Code to SELECT data from RPM_TS_PROJECT_ARCH_EXT
Related tables to RPM_TS_PROJECT_ARCH_EXT
Access table RPM_TS_PROJECT_ARCH_EXT




Structure field list including key, data, relationships and ABAP select examples

RPM_TS_PROJECT_ARCH_EXT is a standard SAP Structure so does not store data like a database table does. It can be used to define the fields of other actual tables or to process "RPM: extended structure for archived project data" Information within sap ABAP programs.

This is done by declaring abap internal tables, work areas or database tables based on this Structure. These can then be used to store and process the required data appropriately.

i.e. DATA: wa_RPM_TS_PROJECT_ARCH_EXT TYPE RPM_TS_PROJECT_ARCH_EXT.

The RPM_TS_PROJECT_ARCH_EXT table consists of various fields, each holding specific information or linking keys about RPM: extended structure for archived project data data available in SAP. These include EXTERNAL_ID (Project ID), PROJ_DESCRIPTION (Item Name), ACTUALSTART (Actual Start Date), ACTUALFINISH (Actual Finish Date).. See below for full list along with technical details, documentation, text table, check tables, foreign key relationships, conversion routines, relevant tcodes and example ABAP select code etc. .

Delivery Class:
Display/Maintenance via tcode SM30: Display/Maintenance Allowed but with Restrictions
SAP enhancement categories: Can Be Enhanced (Deep)


SAP RPM_TS_PROJECT_ARCH_EXT structure fields - Full list of fields found in SAP data dictionary

Field Description Data Element Data Type length (Dec) Check table Conversion Routine Domain Name MemoryID SHLP
PROJECT_GUIDProject Planning: 16 Character GUID for Projects CGPL_PROJECT_GUIDRAW16CGPLPCGPL_PROJECT_GUID
EXTERNAL_IDProject ID RPM_TV_PROJECT_IDCHAR24
PROJ_DESCRIPTIONItem Name RPM_TV_PROJ_DESCRIPTIONCHAR40TEXT40
ACTUALSTARTActual Start Date CGPL_ACTUALSTARTDEC15TSTPSBCOS_TSTMP
ACTUALFINISHActual Finish Date CGPL_ACTUALFINISHDEC15TSTPSBCOS_TSTMP
PLANSTARTPlanned start date CGPL_PLANSTARTDEC15TSTPSBCOS_TSTMP
PLANFINISHPlanned Finish Date CGPL_PLANFINISHDEC15TSTPSBCOS_TSTMP
COMPLETIONPercentage of Completion CGPL_COMPLETIONNUMC3CGPL_COMPLETION
MILESTONEMilestone indicator CGPL_MILESTONECHAR1CHAR1
CONSTRAINT_TYPEType of Scheduling Constraint CGPL_CONSTRAINTCHAR1CGPL_CONSTRAINT
CONSTRAINT_TIMEConstraint Date CGPL_CONSTRAINT_TIMEDEC15TSTPSBCOS_TSTMP
LATEST_STARTLatest start CGPL_LATEST_STARTDEC15TSTPSBCOS_TSTMP
LATEST_FINISHLatest finish date CGPL_LATEST_FINISHDEC15TSTPSBCOS_TSTMP
PROJECT_DURATIONDuration of Execution CGPL_DURATIONDEC8(2) CGPL_DURATION
DURATION_UNITTime Unit for Execution Duration CGPL_DURATION_UNITUNIT3Assigned to domainCUNITMEINS
CONSTR_TYPE_FINType of Scheduling Constraint CGPL_CONSTRAINTCHAR1CGPL_CONSTRAINT
CONSTR_TIME_FINConstraint Date CGPL_CONSTRAINT_TIMEDEC15TSTPSBCOS_TSTMP
CATEGORYCategory RPM_PROJECT_CATEGORYNUMC4RPM_PROJ_CATRPM_PROJECT_CATEGORY/RPM/CATEGORY
SUBCATEGORYSubcategory RPM_PROJ_SUBCATEGORYNUMC4RPM_PROJ_SUBCATRPM_SUBCATEGORY/RPM/CATEGORY_SUBCATEGORY
PHASEStage RPM_PROJECT_PHASENUMC4RPM_PROJ_PHASERPM_PROJECT_PHASE
PTYPEGroup RPM_PROJECTTYPENUMC4RPM_PROJ_TYPERPM_PROJECTTYPE
TTYPETechnology Type RPM_PROJECT_TECHTYPENUMC4RPM_PROJ_TTYPERPM_PROJECT_TECHTYPE
APSTATProject Approval Status RPM_PROJECT_APPSTNUMC4RPM_PROJ_APSTRPM_PROJECT_APPST
EXSTATProject Execution Status RPM_PROJECT_EXECSTATNUMC4RPM_PROJ_EXSTRPM_PROJECT_EXECSTAT
PPRIOProject Priority RPM_PROJECT_PRIORITYNUMC4NUMC4
RISKAAssessed Project Risk RPM_PROJECT_RISK_ASSESEDNUMC3NUMC3
PROBTProbability of Technical Success RPM_PROJECT_PROB_TECHNUMC3NUMC3
PROBCProbability of Commercial Success RPM_PROJECT_PROB_COMMNUMC3NUMC3
HEADCActual Headcount RPM_PROJECT_HEADCOUNTDEC10(2) /RPM/DEC_10_2
BUDGTBudget RPM_PROJECT_BUDGET_PLANCURR16(2) CURR16
COSTFPlanned Cost RPM_PROJECT_COST_FORECASTCURR16(2) CURR16
COSTAActual Cost RPM_PROJECT_COST_ACTUALCURR16(2) CURR16
COSTDDevelopment Cost RPM_PROJECT_COST_DEVELOPMENTCURR16(2) /RPM/CURR_16_2
COSTLLaunch Cost RPM_PROJECT_COST_LAUNCHCURR16(2) /RPM/CURR_16_2
NPVNet Present Value (manual) RPM_PROJECT_NPVCURR16(2) /RPM/CURR_16_2
CURRENCYCurrency key RPM_TV_CURRENCYCUKY5TCURCWAERS
LOCATIONLocation DPR_TV_LOCATIONCHAR4DPR_LOCATIONDPR_LOCATION
GEOGRAPHYArea DPR_TV_AREACHAR4DPR_AREADPR_AREA
ACTUAL_HEADCOUNTActual Headcount RPM_TV_HEADCOUNTDEC10(2)
RPM_CHANGED_ONTime Stamp RPM_TV_TIMESTAMPDEC15TSTPSRPM_BCOS_TSTMP
ACTUAL_WORKActual Work RPM_TV_ACTUAL_WORKDEC10(2)
PLANNED_WORKPlanned Work RPM_TV_PLANNED_WORKDEC10(2)
WORK_UNITSAssignment Unit RPM_TV_ALLOCATION_UNITCHAR3RPM_ALLOCATION_UNIT
BASELINE_STARTBaseline Start RPM_TV_BASELINE_STARTDATS8
BASELINE_FINISHBaseline Finish RPM_TV_BASELINE_FINISHDATS8
COSTF_TDPlanned Cost RPM_PROJECT_COST_FORECASTCURR16(2) CURR16
COSTA_TDActual Cost RPM_PROJECT_COST_ACTUALCURR16(2) CURR16
ANNUAL_BUDGETBudget RPM_PROJECT_BUDGET_PLANCURR16(2) CURR16
PERIODTYPEPeriod Type (Weekly/Monthly/Generic Interval) RPM_TV_AVLB_PERIODNUMC2RPM_AVLB_PERIOD
UNITProject Resource Supply - Unit RPM_TV_RESOURCE_AVAIL_UNITCHAR3RPM_ALLOCATION_UNIT
VERSIONProject Version Type RPM_TV_VERSION_TYPECHAR1RPM_VERSION_TYPE
ITEM_TYPEType /RPM/TV_ITEM_IDCHAR15Assigned to domain/RPM/TD_ITEM_TYPE
PORTFL_ITEM_GUIDGuid for application objects RPM_TV_GUIDRAW16RPM_GUID
ESCALATIONEscalation Flag RPM_TV_ESCALATIONCHAR1XFELD
FORECAST_STARTForecasted Start RPM_TV_FORECAST_STARTDATS8DATS
PLANNED_STARTPlanned Start Date RPM_TV_PLAN_STARTDATS8DATS
ACTUAL_STARTActual Start Date RPM_TV_ACTUAL_STARTDATS8
FORECAST_FINISHForecasted Finish Date RPM_TV_FORECAST_FINISHDATS8DATS
PLANNED_FINISHPlanned Finish Date RPM_TV_PLAN_FINISHDATS8DATS
ACTUAL_FINISHActual Finish Date RPM_TV_ACTUAL_FINISHDATS8
PORTFOLIO_GUIDGuid for application objects RPM_TV_GUIDRAW16RPM_GUID
PARENT_GUIDGuid for application objects RPM_TV_GUIDRAW16RPM_GUID
ECVExpected Commercial Value (manual) RPM_TV_ECVCURR16(2) /RPM/CURR_16_2
PRIORITY_GROUPPriority Group RPM_PRIORITY_GROUPNUMC2Assigned to domainRPM_PRIORITY_GROUP
CHANGED_BYUser Name UNAMECHAR12UNAME
VERSION_ITEMSingle-Character Indicator CHAR1CHAR1CHAR1
ITEM_CLASSItem Classification /RPM/TV_ITEM_CLASSCHAR1/RPM/TD_ITEM_CLASS
MASTER_ITEM_GUIDGuid for application objects RPM_TV_GUIDRAW16RPM_GUID
STATUSStatus /RPM/TV_STATUS_COMMONCHAR5Assigned to domain/RPM/TD_STATUS_COMMON
CAP_PERIODTYPECapacity Period Breakdown /RPM/TV_CAP_PERIOD_TYPENUMC2Assigned to domain/RPM/TD_PERIOD_TYPE
ACT_DPCPT_GUIDGuid for application objects /RPM/TV_GUIDRAW16
DISCOUNT_RATEDiscount Rate /RPM/TV_DISCOUNT_RATEDEC5(2) /RPM/DEC_5_2
INITIATIVE_GUIDGuid for application objects RPM_TV_GUIDRAW16RPM_GUID
FRCST_BGT_TOTALPortfolio Item Forecasted Budget Total /RPM/TV_FORECASTED_BUDGT_TOTALCURR16(2) /RPM/CURR_16_2
FRCST_BGTANNUALPortfolio Item Forecasted Budget Annual /RPM/TV_FORECASTED_BUDGT_ANNLCURR16(2) /RPM/CURR_16_2
FRCST_COSTTOTALPortfolio Item Forecasted Cost Total /RPM/TV_FORECASTED_COST_TOTALCURR16(2) /RPM/CURR_16_2
FRCST_COST_YTDPortfolio Item Forecasted Cost YTD /RPM/TV_FORECASTED_COST_YTDCURR16(2) /RPM/CURR_16_2
TEMPLATE_GUIDGuid for application objects /RPM/TV_GUIDRAW16
IS_GLOBALGlobal Template /RPM/TV_GLOBALCHAR1XFELD
EA_DUMMYDummy Data Element for Enhanced xRPM Attributes /RPM/TV_EA_DUMMYCHAR1CHAR1
ZRDS_BUDGET 0
ZRDS_STRATFIT 0
ZRDS_TECHRISK 0
ZRDS_SOCRISK 0
ZRDS_OVSCORE 0
ZRDS_BUDGET_S 0
ZRDS_OVASCORE 0
ZANUAL_ES 0
ZANUAL_CS 0
ZIMP_COST 0
ZANNUAL_COST 0
ZSPEND_CAT 0
ZROI 0
ZPAYBK 0
ZAPPROVER 0
ZTEST 0
ZACTROI 0
ZANUAL_ACTES 0
ZIMP_ACOST 0
ZACRPAYBK 0
ZANUAL_ACTCS 0
ZITSPONSOR 0
ZBS 0
PRIORITY_PRCNTProject Priority: Upper Limit RPM_PRIORITY_LIMIT_HIGHNUMC4NUMC4
PRIORITY_ICONIcon in text fields (substitute display, alias) ICON_DCHAR4Assigned to domainICON
BUDGET_PRCNTProject Budget Status: Upper Limit RPM_TV_BUDGET_LIMIT_HIGHDEC3DECV03
BUDGET_GROUPBudget Status Group RPM_TV_BUDGET_GROUPNUMC2Assigned to domainRPM_BUDGET_GROUP
BUDGET_ICONIcon in text fields (substitute display, alias) ICON_DCHAR4Assigned to domainICON
SCHEDULE_PRCNTProject Schedule Status: Upper Limit RPM_TV_SCHEDULE_LIMIT_HIGHNUMC3NUMC3
SCHEDULE_GROUPSchedule Status Group RPM_TV_SCHEDULE_GROUPNUMC2Assigned to domainRPM_SCHEDULE_GROUP
SCHEDULE_ICONIcon in text fields (substitute display, alias) ICON_DCHAR4Assigned to domainICON
RISK_PRCNTRisk Group - Upper Limit RPM_RISK_LIMIT_HIGHNUMC3NUMC3
RISK_GROUPRisk Group Assessed RPM_RISK_GROUPNUMC2Assigned to domainRPM_RISK_GROUP
RISK_ICONIcon in text fields (substitute display, alias) ICON_DCHAR4Assigned to domainICON
STAFFING_PRCNTProject Staffing Status Group High Limit RPM_TV_STAFFING_LIMIT_HIGHNUMC3NUMC3
STAFFING_GROUPStaffing Status Group RPM_TV_STAFFING_GROUPNUMC2Assigned to domainRPM_STAFFING_GROUP
STAFFING_ICONIcon in text fields (substitute display, alias) ICON_DCHAR4Assigned to domainICON
PHASE_ICONIcon in text fields (substitute display, alias) ICON_DCHAR4Assigned to domainICON
PHASE_COLORAlert Object Color Status RPM_TV_STATUS_COLORCHAR7RPM_HTML_COLOR
PROPOSEDData element for domain BOOLE: TRUE (='X') and FALSE (=' ') BOOLE_DCHAR1BOOLE
DERIVED_RISKDerived Risk RPM_TV_RISK_DERIVEDNUMC3NUMC3
VAR_COSTTotal Variance of Project Planned Cost to Actual Cost RPM_PROJ_VARIANCE_COSTCURR16(2) CURR16
VAR_HEADCOUNTVariance of Project Planned and Actual Headcount RPM_PROJ_VARIANCE_HEADCOUNTDEC10(2)
VAR_WORKActual Work RPM_TV_ACTUAL_WORKDEC10(2)
VAR_STARTDATEVariance Start Date in Days RPM_PROJ_VAR_DAYSDEC8
VAR_FINISHDATEVariance Start Date in Days RPM_PROJ_VAR_DAYSDEC8
VAR_COST_TDTotal Variance of Project Planned Cost to Actual Cost RPM_PROJ_VARIANCE_COSTCURR16(2) CURR16
D_PLANSTARTStart Date BEGDADATS8DATUM
D_PLANFINISHEnd Date ENDDADATS8DATUM
D_ACTUALSTARTStart Date BEGDADATS8DATUM
D_ACTUALFINISHEnd Date ENDDADATS8DATUM
HEADC_ACTUALActual Headcount RPM_PROJECT_HEADCOUNTDEC10(2) /RPM/DEC_10_2
MASTER_PROJECTData element for domain BOOLE: TRUE (='X') and FALSE (=' ') BOOLE_DCHAR1BOOLE
LOC_GEOGRAPHYProject Geography RPM_TV_PROJECT_GEOGRAPHYCHAR4Assigned to domainRPM_PROJECT_GEOGRAPHYRPM_SEARCH_GOEGRAPHY
DEPENDENCY_COUNTNumber of Project Dependencies. RPM_TV_DEPENDENCY_COUNTNUMC3NUMC3
DEPENDENCY_GROUPDependency Status RPM_TV_DEPENDENCY_STATUSNUMC4RPM_DEPENDENCY_STATUS
DEPENDENCY_ICONIcon in text fields (substitute display, alias) ICON_DCHAR4Assigned to domainICON
DEPEND_ICONNAMEName of an Icon ICONNAMECHAR30ICONNAME
DEPENDENCY_TEXTDependency:Status Indicator Text RPM_TV_DP_STATGRP_TCHAR30TEXT30
DELETE_OKData element for domain BOOLE: TRUE (='X') and FALSE (=' ') BOOLE_DCHAR1BOOLE
BPS_LINKEDData element for domain BOOLE: TRUE (='X') and FALSE (=' ') BOOLE_DCHAR1BOOLE
FICO_LINKEDData element for domain BOOLE: TRUE (='X') and FALSE (=' ') BOOLE_DCHAR1BOOLE
SUM_HEADCActual Headcount RPM_PROJECT_HEADCOUNTDEC10(2) /RPM/DEC_10_2
SUM_BUDGTBudget RPM_PROJECT_BUDGET_PLANCURR16(2) CURR16
SUM_COSTFPlanned Cost RPM_PROJECT_COST_FORECASTCURR16(2) CURR16
SUM_COSTAActual Cost RPM_PROJECT_COST_ACTUALCURR16(2) CURR16
SUM_COSTDDevelopment Cost RPM_PROJECT_COST_DEVELOPMENTCURR16(2) /RPM/CURR_16_2
SUM_COSTLLaunch Cost RPM_PROJECT_COST_LAUNCHCURR16(2) /RPM/CURR_16_2
SUM_NPVNet Present Value (manual) RPM_PROJECT_NPVCURR16(2) /RPM/CURR_16_2
SUM_CURRENCYCurrency key RPM_TV_CURRENCYCUKY5Assigned to domainWAERS
SUM_A_HEADCOUNTActual Headcount RPM_PROJECT_HEADCOUNTDEC10(2) /RPM/DEC_10_2
SUM_A_WORKActual Work RPM_TV_ACTUAL_WORKDEC10(2)
SUM_P_WORKPlanned Work RPM_TV_PLANNED_WORKDEC10(2)
SUM_WORK_UNITSAssignment Unit RPM_TV_ALLOCATION_UNITCHAR3RPM_ALLOCATION_UNIT
SUM_COSTF_TDPlanned Cost RPM_PROJECT_COST_FORECASTCURR16(2) CURR16
SUM_COSTA_TDActual Cost RPM_PROJECT_COST_ACTUALCURR16(2) CURR16
SUM_A_BUDGETBudget RPM_PROJECT_BUDGET_PLANCURR16(2) CURR16
SUM_V_COSTTotal Variance of Project Planned Cost to Actual Cost RPM_PROJ_VARIANCE_COSTCURR16(2) CURR16
SUM_V_HEADCOUNTVariance of Project Planned and Actual Headcount RPM_PROJ_VARIANCE_HEADCOUNTDEC10(2)
SUM_V_WORKActual Work RPM_TV_ACTUAL_WORKDEC10(2)
SUM_V_COST_TDYTD Variance of Project Planned Cost to Actual Cost RPM_PROJ_VARIANCE_COST_TDCURR16(2) CURR16
SUM_ECVExpected Commercial Value (manual) RPM_TV_ECVCURR16(2) /RPM/CURR_16_2
AVG_PROBTProbability of Technical Success RPM_PROJECT_PROB_TECHNUMC3NUMC3
AVG_PROBCProbability of Commercial Success RPM_PROJECT_PROB_COMMNUMC3NUMC3
PARENT_IDParent ID RPM_TV_PARENT_EXTIDCHAR24
LEFT_IDLeft ID RPM_TV_LEFT_EXTIDCHAR24
RIGHT_IDRight ID RPM_TV_RIGHT_EXTIDCHAR24
ITEM_DER 0
PRIORITY_ICONPriority /RPM/TV_PRIORITY_ICONCHAR4Assigned to domainICON
RISK_PRCNTRisk Group - Upper Limit RPM_RISK_LIMIT_HIGHNUMC3NUMC3
RISK_GROUPRisk Group Assessed RPM_RISK_GROUPNUMC2Assigned to domainRPM_RISK_GROUP
RISK_ICONRisk /RPM/TV_RISK_ICONCHAR4Assigned to domainICON
PHASE_ICONPhase /RPM/TV_PHASE_ICONCHAR4Assigned to domainICON
PHASE_COLORAlert Object Color Status RPM_TV_STATUS_COLORCHAR7RPM_HTML_COLOR
DERIVED_RISKDerived Risk RPM_TV_RISK_DERIVEDNUMC3NUMC3
D_PLANSTARTPlanned Start /RPM/TV_DP_PLAN_STARTDATS8DATUM
D_PLANFINISHPlanned Finish /RPM/TV_DP_PLAN_FINISHDATS8DATUM
D_ACTUALSTARTActual Start /RPM/TV_DP_ACTUAL_STARTDATS8DATUM
D_ACTUALFINISHActual Finish Date /RPM/TV_DP_ACTUAL_FINISHDATS8DATUM
HEADC_ACTUALActual Headcount RPM_PROJECT_HEADCOUNTDEC10(2) /RPM/DEC_10_2
BEGDA_DEMDemand Planning Start /RPM/TV_PP_START_DEMDATS8DATUM
ENDDA_DEMDemand Planning Period Finish Date /RPM/TV_PP_END_DEMDATS8DATUM
BEGDA_FINFinancial Planning Period Start /RPM/TV_PP_START_FINDATS8DATUM
ENDDA_FINFinancial Plan Period Finish Date /RPM/TV_PP_END_FINDATS8DATUM
BUCKET_NAMEBucket Name /RPM/TV_BUCKET_NAMECHAR40TEXT40
BUCKET_IDBucket ID /RPM/TV_BUCKET_IDCHAR24
PROPOSALProposal /RPM/TV_PROPOSALCHAR1XFELD
D_CHANGED_ONChanged On Date /RPM/TV_LAST_CHANGED_ONDATS8DATUM
MASTER_ITEM_NAMEInitiative Name /RPM/TV_MASTER_ITEM_NAMECHAR40TEXT40
MASTER_ITEM_IDInitiative ID /RPM/TV_MASTER_ITEM_IDCHAR24
HAS_CHILDRENHas Children /RPM/TV_ITEM_CHILDRENCHAR1XFELD
BUDGET_ICONBudget /RPM/TV_BUDGET_ICONCHAR4Assigned to domainICON
SCHEDULE_ICONSchedule /RPM/TV_SCHEDULE_ICONCHAR4Assigned to domainICON
STAFFING_ICONStaffing /RPM/TV_STAFFING_ICONCHAR4Assigned to domainICON
BUDGET_TOTALTotal Budget /RPM/TV_BUDGET_TOTALCURR16(2) /RPM/CURR_16_2
BUDGET_ANNUALAnnual Budget /RPM/TV_BUDGET_ANNUALCURR16(2) /RPM/CURR_16_2
PLANNED_COSTPlanned Costs /RPM/TV_PLANNED_COSTCURR16(2) /RPM/CURR_16_2
PLANNED_COST_YTDPlanned Costs Year to Date /RPM/TV_PLANNED_COST_YTDCURR16(2) /RPM/CURR_16_2
ACTUAL_COSTActual Costs /RPM/TV_ACTUAL_COSTCURR16(2) /RPM/CURR_16_2
ACTUAL_COST_YTDActual Cost Year to Day /RPM/TV_ACTUAL_COST_YTDCURR16(2) /RPM/CURR_16_2
ACT_DECPT_NAMEDecision Point Name /RPM/TV_PHASE_TCHAR80TEXT80
ACT_DECPT_STAT_TEXTActive Decision Point Status Text /RPM/TV_STATUS_TEXTCHAR40CHAR40
ACT_DECPT_STAT_ICONActive Decision Point Status /RPM/TV_DECPT_STATUS_ICONCHAR4Assigned to domainICON
DECPT_INFODecision Point Info /RPM/TV_DECPT_INFOCHAR20CHAR20
STATUS_GROUPStatus Group /RPM/TV_ITEM_STATUS_GROUPCHAR4/RPM/ITEM_STATUS_GROUP
FORECASTED_DURATIONForecasted Duration /RPM/TV_FORCASTED_DURATIONQUAN4
PLANNED_DURATIONPlanned Duration /RPM/TV_PLANNED_DURATIONQUAN4
ACTUAL_DURATIONActual Duration /RPM/TV_ACTUAL_DURATIONQUAN4
ACT_PHASE_GUIDApplication Object GUID DPR_TV_GUIDRAW16DPR_GUID
WORKEFFORT_TOTALActual Effort /RPM/TV_WORK_EFFORT_TOTALDEC26(2) /RPM/DEC_26_2
WORKEFFORT_YTDActual Work Effort Year-To-Date /RPM/TV_WORK_EFFORT_YTDDEC26(2) /RPM/DEC_26_2
PLANNED_EFFORTPlanned Effort /RPM/TV_PLAN_EFFORTDEC26(2) /RPM/DEC_26_2
PLANNED_EFFORT_YTDPlanned Effort Year-To-Date /RPM/TV_PLAN_EFFORT_YTDDEC26(2) /RPM/DEC_26_2
ROIReturn on Investment in % (manual) /RPM/TV_ROICURR16(2) /RPM/CURR_16_2
IRRInternal Rate of Return in % (manual) /RPM/TV_IRRCURR16(2) /RPM/CURR_16_2
RISK_GROUP_DRisk Group Derived /RPM/RISK_GROUP_DNUMC2Assigned to domainRPM_RISK_GROUP
RISK_D_ICONDerived Risk /RPM/TV_RISK_ICON_DCHAR4Assigned to domainICON
PLANNED_DECISION_DATEPlanned Decision date /RPM/TV_PLAND_DDATEDATS8DATUM
ACTUAL_DECISION_DATEActual Decision Date /RPM/TV_ACTUAL_DDATEDATS8DATUM
FORECAST_DEC_DATEForecasted Decision Date /RPM/TV_FORECAST_DDATEDATS8DATUM
D_FORECASTED_STARTForecasted Start RPM_TV_DP_FORECAST_STARTDATS8DATS
D_FORECASTED_FINISHForecasted Finish Date RPM_TV_DP_FORECAST_FINISHDATS8DATS
BUDGET_GROUPBudget Status Group RPM_TV_BUDGET_GROUPNUMC2Assigned to domainRPM_BUDGET_GROUP
SCHEDULE_GROUPSchedule Status Group RPM_TV_SCHEDULE_GROUPNUMC2Assigned to domainRPM_SCHEDULE_GROUP
STAFFING_GROUPStaffing Status Group RPM_TV_STAFFING_GROUPNUMC2Assigned to domainRPM_STAFFING_GROUP
PORTFOLIO_NAMEPortfolio Name /RPM/TV_PORTFOLIO_NAMECHAR40TEXT40
PORTFOLIO_IDPortfolio ID /RPM/TV_PORTFOLIO_IDCHAR24
PLANNED_REVENUEPlanned Revenues /RPM/TV_PLANNED_REVENUECURR16(2) /RPM/CURR_16_2
PLANNED_REV_YTDPlanned Revenues Year to Date /RPM/TV_PLANNED_REVENUE_YTDCURR16(2) /RPM/CURR_16_2
ACTUAL_REVENUEActual Revenues /RPM/TV_ACTUAL_REVENUECURR16(2) /RPM/CURR_16_2
ACTUAL_REV_YTDActual Revenues Year to Day /RPM/TV_ACTUAL_REVENUE_YTDCURR16(2) /RPM/CURR_16_2
NPV_PLANNet Present Value /RPM/TV_NPV_PLANCURR16(2) /RPM/CURR_16_2
IRR_PLANInternal Rate of Return in % /RPM/TV_IRR_PLANCURR16(2) /RPM/CURR_16_2
ROI_PLANReturn on Investment in % /RPM/TV_ROI_PLANCURR16(2) /RPM/CURR_16_2
PAYBACK_PLANPayback Periods in Months /RPM/TV_PAYBACK_PLANNUMC6ALPHA/RPM/TD_PBP_PLAN
ECV_PLANExpected Commercial Value /RPM/TV_ECV_PLANCURR16(2) /RPM/CURR_16_2
EA_DUMMY_KPISingle-Character Indicator CHAR1CHAR1CHAR1
RPM_PROJECT_STKHLDR 0
RPM_PROJECT_STKHLDR_DER 0
PROJECT_SHORT_TEXT 0
DEPENDENCIES 0

Key field Non-key field



How do I retrieve data from SAP structure RPM_TS_PROJECT_ARCH_EXT using ABAP code?

As RPM_TS_PROJECT_ARCH_EXT is a database structure and not a table it does not store any data in the SAP data dictionary. The ABAP SELECT statement is therefore not appropriate and can not be performed on RPM_TS_PROJECT_ARCH_EXT as there is no data to select.

How to access SAP table RPM_TS_PROJECT_ARCH_EXT

Within an ECC or HANA version of SAP you can also view further information about RPM_TS_PROJECT_ARCH_EXT and the data within it using relevant transactions such as

SE11 (ABAP Dictionary Maintenance)
SM30 (Maintain Table Data)
SE80 (Object Navigator)
SE16 (Data Browser).


Search for further information about these or an SAP related objects



Comments on this SAP object

What made you want to lookup this SAP object? Please tell us what you were looking for and anything you would like to be included on this page!