ROIO_HD_PM_LIST SAP (List fields for held PM orders) Structure details

Dictionary Type: Structure
Description: List fields for held PM orders




ABAP Code to SELECT data from ROIO_HD_PM_LIST
Related tables to ROIO_HD_PM_LIST
Access table ROIO_HD_PM_LIST




Structure field list including key, data, relationships and ABAP select examples

ROIO_HD_PM_LIST is a standard SAP Structure so does not store data like a database table does. It can be used to define the fields of other actual tables or to process "List fields for held PM orders" Information within sap ABAP programs.

This is done by declaring abap internal tables, work areas or database tables based on this Structure. These can then be used to store and process the required data appropriately.

i.e. DATA: wa_ROIO_HD_PM_LIST TYPE ROIO_HD_PM_LIST.

The ROIO_HD_PM_LIST table consists of various fields, each holding specific information or linking keys about List fields for held PM orders data available in SAP. These include AUFNR (Order Number), XHELD (Flag: Contains items to be held), XFREE (Flag: Contains items to be shipped), ICON_HOLD (Icon for hold status).. See below for full list along with technical details, documentation, text table, check tables, foreign key relationships, conversion routines, relevant tcodes and example ABAP select code etc. .

Delivery Class:
Display/Maintenance via tcode SM30: Display/Maintenance Allowed but with Restrictions
SAP enhancement categories: Can be enhanced (character-type or numeric)


SAP ROIO_HD_PM_LIST structure fields - Full list of fields found in SAP data dictionary

Field Description Data Element Data Type length (Dec) Check table Conversion Routine Domain Name MemoryID SHLP
MANDTClient MANDTCLNT3Assigned to domainMANDT
AUFNROrder Number AUFNRCHAR12Assigned to domainALPHAAUFNRANR
XHELDFlag: Contains items to be held OIO_HD_HELDCHAR1XFELD
XFREEFlag: Contains items to be shipped OIO_HD_FREECHAR1XFELD
ICON_HOLDIcon for hold status OIO_HD_ICONCHAR4Assigned to domainICON
AUARTOrder Type AUFARTCHAR4T003OAUFARTAAT
AUTYPOrder category AUFTYPNUMC2AUFTYP
REFNRReference order number AUFREFNRCHAR12AUFKALPHAAUFNRANV
ERNAMEntered by AUFERFNAMCHAR12USNAM
ERDATCreated on AUFERFDATDATS8DATUM
AENAMLast changed by AUFAENAMCHAR12USNAM
AEDATChange date for Order Master AUFAEDATDATS8DATUM
KTEXTDescription AUFTEXTCHAR40TEXT40
BUKRSCompany Code BUKRSCHAR4T001BUKRSBUKC_T001
BUKRS_TXTCompany code name OIO_BUKRS_TXTCHAR30TEXT30
WERKSPlant WERKS_DCHAR4Assigned to domainWERKSWRKH_T001W_C
WERKS_TXTPlant name OIO_WERKS_TXTCHAR30TEXT30
GSBERBusiness Area GSBERCHAR4TGSBGSBERGSB
GSBER_TXTBusiness area name OIO_GSBER_TXTCHAR30TEXT30
KOKRSControlling Area KOKRSCHAR4TKA01CACCDCAC
KOKRS_TXTControlling area name OIO_KOKRS_TXTCHAR30TEXT30
CCKEYCost collector key CCKEYCHAR23CCKEY
KOSTVResponsible cost center AUFKOSTVCHAR10CSKSALPHAKOSTL
STORTLocation AUFSTORTCHAR10T499SAP_STAND
SOWRKLocation plant AUFSOWRKCHAR4T001WWERKS
ASTKZIdentifier for statistical order AUFSTKZCHAR1XFELD
WAERSOrder Currency AUFWAERSCUKY5TCURCWAERS
STDATDate of last status change AUFSTDATDATS8DATUM
IDAT1Release date AUFIDAT1DATS8DATUM
IDAT2Technical completion date AUFIDAT2DATS8DATUM
IDAT3Close date AUFIDAT3DATS8DATUM
OBJIDObject ID CCOBJIDCHAR1CHAR1
LOEKZDeletion flag AUFLOEKZCHAR1XFELD
PLGKZIdentifier for planning with line items PLGKZCHAR1XFELD
KVEWEUsage of the condition table KVEWECHAR1T681VKVEWEKVW
KAPPLApplication KAPPLCHAR2T681AKAPPLKAP
KALSMCosting Sheet AUFKALSMCHAR6T683KALSM
ZSCHLOverhead key AUFZSCHLCHAR6CHAR6
ABKRSProcessing group AUFABKRSNUMC2TKO08AKREISAKR
KSTARSettlement cost element AUFKSTARCHAR10CSKBALPHAKSTAR
KOSTLCost center for basic settlement AUFKOSTLCHAR10CSKSALPHAKOSTLKOS
SETNMAllocation set AUFSETNMCHAR12SETNRGSE
CYCLECost center to which costs are actually posted ST_KOSTLCHAR10CSKSALPHAKOSTL
SDATEStart Date SDATEDATS8Assigned to domainSDATEGAS
SEQNRSequence number AUFSEQNRNUMC4Assigned to domainSQNR
USER4Estimated total costs of order AUFUSER4CURR11(2) AUFUSER4
OBJNRObject number J_OBJNRCHAR22ONR00J_OBJNRONR
PRCTRProfit Center PRCTRCHAR10CEPCALPHAPRCTRPRCPRCTR_EMPTY
PSPELWork breakdown structure element (WBS element) PS_PSP_ELENUMC8PRPSKONPRPS_POSNR
FUNC_AREAFunctional Area FKBERCHAR16TFKBFKBERFBE
PLINTIndicator for Integrated Planning PLINTCHAR1XFELD
KDAUFSales Order Number KDAUFCHAR10VBUKALPHAVBELNAUN
KDPOSItem Number in Sales Order KDPOSNUMC6NUM06KPO
AUFEXExternal order number AUFEXCHAR20ALPHAAUFEX
VNAMEJoint Venture JV_NAMECHAR6T8JVALPHAJV_NAMEJVV
RECIDRecovery Indicator JV_RECINDCHAR2T8JJALPHAJV_RECIND
ETYPEEquity type JV_ETYPECHAR3T8JGALPHAJV_ETYPE
OTYPEJoint Venture Object Type JV_OTYPECHAR4ALPHAJV_OTYPE
JV_JIBCLJIB/JIBE Class JV_JIBCLCHAR3T8J6AJV_JIBCLJIB
JV_JIBSAJIB/JIBE Subclass A JV_JIBSACHAR5T8J6CJV_JIBSAJBS
JV_OCOJV original cost object JV_OR_COCHAR1JV_OR_COB
GLTRPBasic finish date CO_GLTRPDATS8DATUM
GSTRPBasic start date CO_GSTRPDATS8DATUM
FTRMSScheduled release date CO_FTRMSDATS8DATUM
GLTRSScheduled finish CO_GLTRSDATS8DATUM
GSTRSScheduled start CO_GSTRSDATS8DATUM
GSTRIActual start date CO_GSTRIDATS8DATUM
GETRIConfirmed Order Finish Date CO_GETRIDATS8DATUM
GLTRIActual finish date CO_GLTRIDATS8DATUM
FTRMIActual release date CO_FTRMIDATS8DATUM
FTRMPPlanned release date CO_FTRMPDATS8DATUM
RSNUMNumber of Reservation/Dependent Requirement RSNUMNUMC10Assigned to domainRSNUMRES
GASMGTotal scrap quantity in the order GASMGQUAN13(3) MENG13
GAMNGTotal order quantity GAMNGQUAN13(3) MENG13
GMEINBase Unit of Measure MEINSUNIT3T006CUNITMEINS
PLNBEZMaterial Number MATNRCHAR18MARAMATN1MATNRMATS_MAT1
PLNTYTask List Type PLNTYCHAR1Assigned to domainPLNTYPTYH_TCA01
PLNNRKey for Task List Group PLNNRCHAR8ALPHAPLNNRPLNPLKS
PLNAWApplication of the task list PLNAWCHAR1TCA09PLNAW
PLNALGroup Counter PLNALCHAR2ALPHAALTNRPAL
PVERWTask list usage PLN_VERWECHAR3T411PLN_VERWEH_T411
PLAUFDate for routing transfer CO_PLAUFDATS8DATUM
PLSVBTo lot size LOSGRBISQUAN13(3) MENG13
PLNMETask list unit of measure PLNMEUNIT3T006CUNITMEINS
PLSVNFrom Lot Size LOSGRVONQUAN13(3) MENG13
PDATVValid-From Date DATUVDATS8DATUM
LODIVLot size divisor LOSDIVQUAN13(3) MENG13
STLTYBOM category STLTYCHAR1STLTY
STLBEZMaterial Number MATNRCHAR18MARAMATN1MATNRMATS_MAT1
STLSTBOM status STLSTNUMC2T415SSTLST
STLNRBill of material STNUMCHAR8NUMCVSTNUMSTLNR
SDATVValid-From Date DATUVDATS8DATUM
SBMNGBase quantity BASMNQUAN13(3) MENG13
SBMEHBase Unit of Measure MEINSUNIT3T006CUNITMEINS
STLALAlternative BOM STALTCHAR2ALPHAALTNR
STLANBOM Usage STLANCHAR1T416STLANCSV
SLSVNFrom Lot Size LOSVNQUAN13(3) MENG13
SLSBSTo Lot Size LOSBSQUAN13(3) MENG13
AUFLDDate of BOM Explosion/Routing Transfer CO_AUFLDDATS8DATUM
DISPOMRP controller for the order CO_DISPOCHAR3T024DDISPODGR
AUFPLRouting number of operations in the order CO_AUFPLNUMC10AUFPL
FEVORProduction Supervisor FEVORCHAR3T024FFEVORCFV
FHORIScheduling Margin Key for Floats FHORICHAR3T436AFHORI
TERKZScheduling type TERMKZCHAR1T482TERART
REDKZReduction indicator for scheduling REDKZCHAR1REDKZ
APRIOOrder priority CO_APRIOCHAR1CHAR1
NTZUESuperior network number NETZ_UEBERCHAR12AUFKALPHAAUFNR
VORUESuperior activity VORG_UEBERCHAR4NUMCVVORNR
PROFIDNetwork profile PROFIDNZPLCHAR7TCN41PROFILIDPNW
VORGZFloat before production (in days) VORGZNUMC3NUM3
SICHZFloat after production (in days) SICHZNUMC3NUM3
FREIZRelease period (in days) FREIZNUMC3NUM3
UPTERIndicator: Change to Scheduled Dates CO_UPTERCHAR1CHAR1
BEDIDID of the capacity requirements record BEDIDNUMC12Assigned to domainBEDID
PRONRProject definition PS_PSP_PRONUMC8PROJKONPDPS_PSPNR
PRUEFLOSInspection Lot Number QPLOSNUMC12Assigned to domainQPLOSQLSQALS
KLVARPCosting variant for planned costs KALKVARPLNCHAR4Assigned to domainKLVAR
KLVARICosting variant for actual costs KALKVARISTCHAR4Assigned to domainKLVAR
RGEKZIndicator: Backflushing for order CO_RGEKZCHAR1CO_RGEKZ
PLARTBasis for scheduling PS_PLARTCHAR1PS_PLART
FLG_AOBIndicator: relationships FLG_AOBCHAR1FLAG
FLG_ARBEIIndicator: Default value work is relevant FLG_ARBEICHAR1FLAG
GLTPPFinish date (forecast) CO_GLTPPDATS8DATUM
GSTPPForecast start date CO_GSTPPDATS8DATUM
GLTPSScheduled forecast finish CO_GLTPSDATS8DATUM
GSTPSScheduled forecast start CO_GSTPSDATS8DATUM
FTRPSScheduled release date (forecast) CO_FTRPSDATS8DATUM
RDKZPReduction indicator for scheduling (forecast) REDKZPCHAR1REDKZ
TRKZPScheduling type (forecast) TERMKZPCHAR1Assigned to domainTERART
RUECKCompletion confirmation number for the operation CO_RUECKNUMC10CO_RUECKRCK
RATIDID of the capacity requirements record BEDIDNUMC12Assigned to domainBEDID
GROIDID of the capacity requirements record BEDIDNUMC12Assigned to domainBEDID
GLUZSScheduled finish time CO_GLUZSTIMS6UHRZT
GSUZSScheduled Start (Time) CO_GSUZSTIMS6ATIME
REVLVRevision Level REVLVCHAR2NUMCVREVLVRVS
RSHTYObject types of the CIM resource CR_OBJTYCHAR2CR_OBJTY
RSHIDObject ID of the resource CR_OBJIDNUMC8CRIDCR_OBJID
RSNTYObject types of the CIM resource CR_OBJTYCHAR2CR_OBJTY
RSNIDObject ID of the resource CR_OBJIDNUMC8CRIDCR_OBJID
ARSNRNumber of Reservation/Dependent Requirement RSNUMNUMC10Assigned to domainRSNUMRES
ARSPSOrder Item Number CO_POSNRNUMC4CO_POSNR
MAUFNRNumber of superior order MAUFNRCHAR12Assigned to domainALPHAAUFNRUAF
AUFNTNumber of superior network CO_TEILNETCHAR12Assigned to domainALPHAAUFNR
AUFPTRouting number of operations in the order CO_AUFPLNUMC10AUFPL
CY_SEQNRSeq. number order CY_SEQNRNUMC14CY_SEQNR
BREAKSIndicator: Scheduling allowing for breaks BREAKSCHAR1XFELD
VORGZ_TRMScheduled float before production in days VORGZ_TRMDEC6(3) PUFFER_TRM
SICHZ_TRMScheduled float after production in days SICHZ_TRMDEC6(3) PUFFER_TRM
TRMDTDate of the last scheduling TRMDTDATS8DATUM
GLUZPBasic finish (time) CO_GLUZPTIMS6UHRZT
GSUZPBasic start time CO_GSUZPTIMS6UHRZT
GSUZIActual start time CO_GSUZITIMS6UHRZT
GEUZIConfirmed order finish (time) CO_GEUZITIMS6UHRZT
GLUPPForecast finish (time) CO_GLUPPTIMS6UHRZT
GSUPPForecast start (time) CO_GSUPPTIMS6UHRZT
GLUPSScheduled forecast finish time CO_GLUPSTIMS6UHRZT
GSUPSScheduled start time (Forecast) CO_GSUPSTIMS6UHRZT
CHSCHSearch procedure for batch determination KALSMA_CHCHAR6T683KALSM
KAPT_VORGZFloat (bef. production) remaining after finite scheduling KAPT_VORGZNUMC3NUM3
KAPT_SICHZRemaining float after finite scheduling KAPT_SICHZNUMC3NUM3
LEAD_AUFNRLeading order in current processing CO_LAUFNRCHAR12AUFKALPHAAUFNR
PNETSTARTDOutline start of collective network (date) CO_PSTARTDDATS8DATUM
PNETSTARTTStart time of a collective order CO_PSTARTTTIMS6ATIME
PNETENDDOutline finish of collective order (date) CO_PENDDDATS8DATUM
PNETENDTOutline finish time CO_PENDTTIMS6ATIME
KBEDInd: do not create capacity requirements KBED_DCHAR1XFELD
KKALKRIndicator: Components will not be costed COMP_CALCCHAR1XFELD
SFCPFProduction Scheduling Profile CO_PRODPRFCHAR6TCO43CO_PRODPRF
RMNGATotal confirmed rework quantity RMNGAQUAN13(3) MENGV13
GSBTROverall commitment date CO_GSBTRDATS8DATUM
VFMNGCommitted quantity for order acc. to ATP check components CO_VFMNGQUAN13(3) MENG13
NOPCOSTDo not calculate planned costs for order CO_NOPCOSTCHAR1XFELD
NETZKONTIndicator for the account assignment of a network(hdr/act.) NETZKONTCHAR1NETZKONT
ATRKZRequest ID ATRKZCHAR1ATRKZ
OBJTYPEChange indicator OCM_OBJ_TYPECHAR1OCM_OBJ_TYPE
CH_PROCProcess that has lead to the change of an object OCM_CH_PROCCHAR1OCM_CH_PROC
KAPVERSAVersion of Available Capacity KAPVERSANUMC2Assigned to domainKAPVERSION
COLORDPROCCollective order with/without automatic goods movement CO_COLORDPRCCHAR1CO_COLORDPRC
KZERBIndicator: Project summarization via master data charact. PS_KZERBCHAR1XFELD

Key field Non-key field



How do I retrieve data from SAP structure ROIO_HD_PM_LIST using ABAP code?

As ROIO_HD_PM_LIST is a database structure and not a table it does not store any data in the SAP data dictionary. The ABAP SELECT statement is therefore not appropriate and can not be performed on ROIO_HD_PM_LIST as there is no data to select.

How to access SAP table ROIO_HD_PM_LIST

Within an ECC or HANA version of SAP you can also view further information about ROIO_HD_PM_LIST and the data within it using relevant transactions such as

SE11 (ABAP Dictionary Maintenance)
SM30 (Maintain Table Data)
SE80 (Object Navigator)
SE16 (Data Browser).


Search for further information about these or an SAP related objects



Comments on this SAP object

What made you want to lookup this SAP object? Please tell us what you were looking for and anything you would like to be included on this page!