RCJ_PS_PPT SAP (All Objects in the Project Planning Board) Structure details

Dictionary Type: Structure
Description: All Objects in the Project Planning Board




ABAP Code to SELECT data from RCJ_PS_PPT
Related tables to RCJ_PS_PPT
Access table RCJ_PS_PPT




Structure field list including key, data, relationships and ABAP select examples

RCJ_PS_PPT is a standard SAP Structure so does not store data like a database table does. It can be used to define the fields of other actual tables or to process "All Objects in the Project Planning Board" Information within sap ABAP programs.

This is done by declaring abap internal tables, work areas or database tables based on this Structure. These can then be used to store and process the required data appropriately.

i.e. DATA: wa_RCJ_PS_PPT TYPE RCJ_PS_PPT.

The RCJ_PS_PPT table consists of various fields, each holding specific information or linking keys about All Objects in the Project Planning Board data available in SAP. These include OBJEKTID (ID/Object key), KURZTEXT (Short text/description of the object), OBJEKTTYP (Object Type Text), ECKST (Basic start date).. See below for full list along with technical details, documentation, text table, check tables, foreign key relationships, conversion routines, relevant tcodes and example ABAP select code etc. .

Delivery Class:
Display/Maintenance via tcode SM30: Display/Maintenance Allowed but with Restrictions
SAP enhancement categories: Can be enhanced (character-type or numeric)


SAP RCJ_PS_PPT structure fields - Full list of fields found in SAP data dictionary

Field Description Data Element Data Type length (Dec) Check table Conversion Routine Domain Name MemoryID SHLP
OBJEKTIDID/Object key OBJEKT_IDCHAR30CHAR30
KURZTEXTShort text/description of the object KURZTEXTCHAR40TEXT40
OBJEKTTYPObject Type Text OTEXTCHAR25TEXT25
ECKSTBasic start date PS_ECKSTDATS8DATUM
ECKENFinish date (from basic dates) PS_ECKENDATS8DATUM
PROGSTForecast start date PS_PROGSTDATS8DATUM
PROGENForecast finish date PS_PROGENDATS8DATUM
TESTFREarliest scheduled start (from basic dates) PS_TESTFRDATS8DATUM
TEENFREarliest scheduled finish (from basic dates) PS_TEENFRDATS8DATUM
TESTSPLatest scheduled start (from basic dates) PS_TESTSPDATS8DATUM
TEENSPLatest scheduled finish (from basic dates) PS_TEENSPDATS8DATUM
TPSTFREarliest scheduled start (from forecast dates) PS_TPSTFRDATS8DATUM
TPENFREarliest scheduled finish (from forecast dates) PS_TPENFRDATS8DATUM
TPSTSPLatest scheduled start (from forecast dates) PS_TPSTSPDATS8DATUM
TPENSPLatest scheduled finish (from forecast dates) PS_TPENSPDATS8DATUM
ISTSTActual start date PS_ISTSTDATS8DATUM
ISTENActual finish date PS_ISTENDATS8DATUM
DATFSEarliest start date PS_DATFSDATS8DATUM
DATSELatest finish date PS_DATSEDATS8DATUM
EDAUERDuration PS_EDAUERQUAN5(1) DAUER_4_1
EDAUEHActual duration unit PS_DAUEHUNIT3T006CUNITMEINS
PDAUERForecast duration PS_PDAUERQUAN5(1) DAUER_4_1
PDAUEHActual duration unit PS_DAUEHUNIT3T006CUNITMEINS
VDAUERTentative duration PS_VDAUERQUAN5(1) DAUER_4_1
VDAUEHActual duration unit PS_DAUEHUNIT3T006CUNITMEINS
IDAUERActual duration PS_IDAUERQUAN5(1) DAUER_4_1
IDAUEHActual duration unit PS_DAUEHUNIT3T006CUNITMEINS
RDAUERRemaining duration PS_RDAUERQUAN5(1) DAUER_4_1
RDAUEHActual duration unit PS_DAUEHUNIT3T006CUNITMEINS
ABARBDProcessing % of duration PS_ABARBDNUMC3CO_ABARB
EARBEIWork PS_EARBEIQUAN9(1) PS_ARBEIT
EARBEHUnit for work PS_ARBEHUNIT3T006CUNITMEINS
PARBEIForecast work PS_PARBEIQUAN9(1) PS_ARBEIT
PARBEHUnit for work PS_ARBEHUNIT3T006CUNITMEINS
VARBEITentative work PS_VARBEIQUAN9(1) PS_ARBEIT
VARBEHUnit for work PS_ARBEHUNIT3T006CUNITMEINS
IARBEIActual work PS_IARBEIQUAN9(1) PS_ARBEIT
IARBEHUnit for work PS_ARBEHUNIT3T006CUNITMEINS
RARBEIRemaining work PS_RARBEIQUAN9(1) PS_ARBEIT
RARBEHUnit for work PS_ARBEHUNIT3T006CUNITMEINS
ABARBAPercent of completion for work PS_ABARBANUMC3CO_ABARB
USR00User field with 20 characters USRCHAR20CHAR20USRCHAR20
USR01User field with 20 characters USRCHAR20CHAR20USRCHAR20
USR02User field with 10 characters USRCHAR10CHAR10USRCHAR10
USR03User field with 10 characters USRCHAR10CHAR10USRCHAR10
USR04User field for quantity (length 10.3) USRQUAN13QUAN13(3) USRQUAN13
USE04User field: Unit for quantity fields USRUNITUNIT3T006CUNITMEINS
USR05User field for quantity (length 10.3) USRQUAN13QUAN13(3) USRQUAN13
USE05User field: Unit for quantity fields USRUNITUNIT3T006CUNITMEINS
USR06User-defined field for values (length 10,3) USRCURR13CURR13(3) USRCURR13
USE06User field: Unit for value fields USRCUKYCUKY5TCURCWAERS
USR07User-defined field for values (length 10,3) USRCURR13CURR13(3) USRCURR13
USE07User field: Unit for value fields USRCUKYCUKY5TCURCWAERS
USR08User field for date USRDATEDATS8USRDATE
USR09User field for date USRDATEDATS8USRDATE
USR10User-defined field: Indicator for reports USRFLAGCHAR1FLAG
USR11User-defined field: Indicator for reports USRFLAGCHAR1FLAG
VERNRNumber of responsible person (project mgr)/MRP controller PS_VERNR_CCHAR8CHAR8
VERNAName of responsible person (Project manager) PS_VERNACHAR25PS_VERNA
ARBPLWork center ARBPLCHAR8ARBPLAGR
PSPRIPriority NW_PRIOCHAR1TCN07NW_PRIO
STATXTEdited status text STATUSTEXTCHAR40CHAR40
STUFELevel in Project Hierarchy PS_STUFEINT13INT1
FRUEHERActual start is before earliest scheduled start FRUEHERQUAN5(1) DAUER_4_1
SPAETERActual Finish/Planned Finish After Latest Scheduled Finish SPAETERQUAN5(1) DAUER_4_1
VERZUGDuration After Latest Scheduled Finish VERZUGQUAN5(1) DAUER_4_1
VORBEIDuration After Latest Scheduled Start VORBEIQUAN5(1) DAUER_4_1
VEINHUnit for Duration of the Delay VERZ_EINHTUNIT3T006CUNITMEINS
WAERSCurrency Key WAERSCUKY5TCURCWAERSFWS
OWAERSObject currency for network activity OWAERSCUKY5Assigned to domainWAERS
PUFGSTotal float PUFFR_GESMDEC3PUFFER
PUFFRFree float PUFFR_FREIDEC3PUFFER
PUFGPTotal float (from forecast) PPUFF_GESMDEC3PUFFER
PUFFPFree float (from forecast) PPUFF_FREIDEC3PUFFER
GESBRBusiness area for WBS element PS_PGSBRCHAR4Assigned to domainGSBERGSB
PRCTRProfit Center PRCTRCHAR10Assigned to domainALPHAPRCTRPRCPRCTR_EMPTY
SAKTOCost element SAKTOCHAR10Assigned to domainALPHASAKNR
KALIDFactory calendar key FABKLCHAR2Assigned to domainWFCID
WERKSPlant WERKS_DCHAR4Assigned to domainWERKSWRKH_T001W_C
BUKRSCompany Code BUKRSCHAR4Assigned to domainBUKRSBUKC_T001
ASTNRApplicant number PS_ASTNRNUMC8Assigned to domainPS_ASTNR
KALSMCosting Sheet AUFKALSMCHAR6Assigned to domainKALSM
ZSCHLOverhead key AUFZSCHLCHAR6CHAR6
ABGSLResults Analysis Key ABGR_SCHLCHAR6Assigned to domainABGR_SCHLACS
ZSCHMInterest Profile for Project/Order Interest Calculation PS_ZSCHMCHAR7Assigned to domainPS_ZSCHM
PLAKZIndicator: Planning element PS_PLAKZCHAR1XFELD
BELKZIndicator: Account assignment element PS_BELKZCHAR1XFELD
FAKKZIndicator: Billing element PS_FAKKZCHAR1XFELD
PROKSTPLANCurrent project cost plan PROKSTPLANCURR15(2) WERTV8
PROKSTPLN2Project cost plan (version 2) PROKSTPLN2CURR15(2) WERTV8
AUFKSTPLANCurrent order cost plan AUFKSTPLANCURR15(2) WERTV8
AUFKSTPLN2Order cost plan (version 2) AUFKSTPLN2CURR15(2) WERTV8
PROERLPLANCurrent project revenue plan PROERLPLANCURR15(2) WERTV8
PROERLPLN2Project revenue plan (version 2) PROERLPLN2CURR15(2) WERTV8
AUFERLPLANCurrent order revenue plan AUFERLPLANCURR15(2) WERTV8
AUFERLPLN2Order revenue plan (version 2) AUFERLPLN2CURR15(2) WERTV8
KREDFINPLNCurrent financial budget, credit side KREDFINPLNCURR15(2) WERTV8
DEBFINPLNCurrent cash budget, debit side DEBFINPLNCURR15(2) WERTV8
BUDGETBudget of a Measure (App. Request Variant Was Replaced) BUDGETCURR15(2) WERTV8
FREIGABERelease FREIGABECURR15(2) WERTV8
AUFTRANFResidual order plan AUFTRANFCURR15(2) WERTV8
FESTPROBLFixed price commitment FESTPROBLCURR15(2) WERTV8
KSTOBLGESTotal cost commitment KSTOBLGESCURR15(2) WERTV8
ISTKOSTENActual costs ISTKOSTENCURR15(2) WERTV8
ISTERLOESEActual revenues ISTERLOESECURR15(2) WERTV8
KZHLNGTotal credit side payments (down payments and payments) KZHLNGCURR15(2) WERTV8
DZHLNGTotal debit side payments (down payments and payments) DZHLNGCURR15(2) WERTV8
.INCLU--AP 0
PROKSTPLAN_OCCurrent Project Cost Plan in Object Currency PROKSTPLANOCCURR15(2) WERTV8
PROKSTPLN2_OCProject Cost Plan (Version 2) in Object Currency PROKSTPLN2OCCURR15(2) WERTV8
AUFKSTPLAN_OCCurrent Order Cost Plan in Object Currency AUFKSTPLANOCCURR15(2) WERTV8
AUFKSTPLN2_OCOrder Cost Plan (Version 2) in Object Currency AUFKSTPLN2OCCURR15(2) WERTV8
PROERLPLAN_OCCurrent Project Revenue Plan in Object Currency PROERLPLANOCCURR15(2) WERTV8
PROERLPLN2_OCProject Revenue Plan (Version 2) in Object Currency PROERLPLN2OCCURR15(2) WERTV8
AUFERLPLAN_OCCurrent Order Revenue Plan in Object Currency AUFERLPLANOCCURR15(2) WERTV8
AUFERLPLN2_OCOrder Revenue Plan (Version 2) in Object Currency AUFERLPLN2OCCURR15(2) WERTV8
KREDFINPLN_OCCurrent Credit Side Cash Budget in Object Currency KREDFINPLNOCCURR15(2) WERTV8
DEBFINPLN_OCCurrent Debit Side Cash Budget in Object Currency DEBFINPLNOCCURR15(2) WERTV8
BUDGET_OCAppropriation Budget (Appr.Request Variant Replaced) in OC BUDGETOCCURR15(2) WERTV8
FREIGABE_OCRelease in Object Currency FREIGABEOCCURR15(2) WERTV8
AUFTRANF_OCResidual Order Plan in Object Currency AUFTRANFOCCURR15(2) WERTV8
FESTPROBL_OCFixed Price Commitment in Object Currency FESTPROBLOCCURR15(2) WERTV8
KSTOBLGES_OCTotal Cost Commitment in Object Currency KSTOBLGESOCCURR15(2) WERTV8
ISTKOSTEN_OCAct. Costs in Object Currency ISTKOSTENOCCURR15(2) WERTV8
ISTERLOESE_OCActual Revenues in Object Currency ISTERLOESEOCCURR15(2) WERTV8
KZHLNG_OCTotal Vendor Payments (Down Payments and Payments) OC KZHLNGOCCURR15(2) WERTV8
DZHLNG_OCTotal Customer Payments (Down Payments and Payments) OC DZHLNGOCCURR15(2) WERTV8
EV_PLAN_ORG1Budgeted cost of work scheduled EVPLANORG1CURR15(2) WERTV8
EV_ACT_ORG1Budgeted cost of work performed EVACTORG1CURR15(2) WERTV8
EV_ACT_CORR1Budgeted cost of work performed, adjusted EVACTCORR1CURR15(2) WERTV8
EV_PLAN_QUAN_ORG1Budgeted cost of work scheduled, quantity EVPLANQUANORG1QUAN15(3) CQUA8
EV_PLAN_QUAN_ORG1_UNITBCWS, Unit of Measure EV_PLAN_QUAN_ORG1_UNITUNIT3Assigned to domainCUNITMEINS
EV_ACT_QUAN_ORG1Budgeted cost of work performed, quantity EVACTQUANORG1QUAN15(3) CQUA8
EV_ACT_QUAN_ORG1_UNITBCWP, Unit of Measure EV_ACT_QUAN_ORG1_UNITUNIT3Assigned to domainCUNITMEINS
EV_ACT_QUAN_CORR1Budgeted cost of work performed, adjusted quantity EVACTQUANCORR1QUAN15(3) CQUA8
EV_ACT_QUAN_CORR1_UNITBCWP, Adjusted Quantity (Unit) EV_ACT_QUAN_CORR1_UNITUNIT3Assigned to domainCUNITMEINS
POC_PLAN_ORG_AGG1Aggregate planned percentage of completion POCPLANORGAGG1DEC6(3) EV_PROGRES
POC_PLAN_ORG_NAGG1Non-aggregated planned percentage of completion POCPLANORGNAGG1DEC6(3) EV_PROGRES
POC_ACT_ORG_AGG1Aggregated actual POC POCACTORGAGG1DEC6(3) EV_PROGRES
POC_ACT_ORG_NAGG1Non-aggregated actual percentage of completion POCACTORGNAGG1DEC6(3) EV_PROGRES
POC_ACT_CORR_AGG1Adjusted aggregated actual POC POCACTCORRAGG1DEC6(3) EV_PROGRES
POC_ACT_CORR_NAGG1Adjusted non-aggregated actual percentage of completion POCACTCORRNAGG1DEC6(3) EV_PROGRES
EV_COST_VAR_ORGCost Variance Based on EV_ACT_ORG1 EWALVARORGCURR15(2) WERTV8
EV_SCHED_VAR_ORGSchedule Variance Based on EV_ACT_ORG1 EVSCHVARORGCURR15(2) WERTV8
EV_COST_INDX_ORGCost Index Based on EV_ACT_ORG1 EWALINDXORGDEC7(2) DEC5_2
EV_SCHED_INDX_ORGDate Index Based on POC_ACT_ORG_AGG1 EVSCHINDXORGDEC7(2) DEC5_2
EV_COST_VAR_CORRCost Variance Based on EV_ACT_CORR1 EWALVARCORRCURR15(2) WERTV8
EV_SCHED_VAR_CORRSchedule Variance Based on EV_ACT_CORR1 EVSCHVARCORRCURR15(2) WERTV8
EV_COST_INDX_CORRCost Index Based on EV_ACT_CORR1 EWALINDXCORRDEC7(2) DEC5_2
EV_SCHED_INDX_CORRDate Index Based on POC_ACT_CORR_AGG1 EVSCHINDXCORRDEC7(2) DEC5_2
.INCLU--AP 0
EV_PLAN_ORG1_OCBudgeted cost of work scheduled EVPLANORG1CURR15(2) WERTV8
EV_ACT_ORG1_OCBudgeted cost of work performed EVACTORG1CURR15(2) WERTV8
EV_ACT_CORR1_OCBudgeted cost of work performed, adjusted EVACTCORR1CURR15(2) WERTV8
EV_COST_VAR_ORG_OCCost Variance Based on EV_ACT_ORG1 EWALVARORGCURR15(2) WERTV8
EV_SCHED_VAR_ORG_OCSchedule Variance Based on EV_ACT_ORG1 EVSCHVARORGCURR15(2) WERTV8
EV_SCHED_VAR_CORR_OCCost Variance Based on EV_ACT_CORR1 EWALVARCORRCURR15(2) WERTV8
EV_COST_VAR_CORR_OCSchedule Variance Based on EV_ACT_CORR1 EVSCHVARCORRCURR15(2) WERTV8
STEUSControl key STEUSCHAR4Assigned to domainSTEUS
DABEAProcessing time CO_DAUBEAQUAN7(1) DAUER_6_1
BEAZEUnit of measure for processing time BEAZEUNIT3CUNITEINHEIT
PLIFZPlanned Delivery Time in Days PLIFZDEC3DEC3
PRARTProject type PS_PRARTCHAR2Assigned to domainPS_PRART
OBJNRObject number J_OBJNRCHAR22Assigned to domainJ_OBJNRONR
GJAHRFiscal Year GJAHRNUMC4GJAHRGJAHRGJR
PERIOPeriod CO_PERIONUMC3PERBLVPE
MEINHUnit of Measure for Display MEINHUNIT3Assigned to domainCUNITMEINS
PERIVFiscal Year Variant PERIVCHAR2Assigned to domainPERIV
UNTRGIndicator: Element is subdivided PS_UNTRGCHAR1CHAR1
SELSelection flag SELKZCHAR1SELKZ
OBJEKTID_ONLYID/Object key OBJEKT_IDCHAR30CHAR30
OBJEKTID_WITH_AID/Object key OBJEKT_IDCHAR30CHAR30
TESTFRZEarliest scheduled start: Execution (time) FSAVZTIMS6ATIME
TEENFRZEarliest scheduled start: Execution (time) FSAVZTIMS6ATIME
TESTSPZEarliest scheduled start: Execution (time) FSAVZTIMS6ATIME
TEENSPZEarliest scheduled start: Execution (time) FSAVZTIMS6ATIME
TPSTFRZEarliest scheduled start: Execution (time) FSAVZTIMS6ATIME
TPENFRZEarliest scheduled start: Execution (time) FSAVZTIMS6ATIME
TPSTSPZEarliest scheduled start: Execution (time) FSAVZTIMS6ATIME
TPENSPZEarliest scheduled start: Execution (time) FSAVZTIMS6ATIME
ISTSTZEarliest scheduled start: Execution (time) FSAVZTIMS6ATIME
ISTENZEarliest scheduled start: Execution (time) FSAVZTIMS6ATIME
FPEDATEEarliest scheduled start: Execution (date) FSAVDDATS8DATUM
FPETIMEEarliest scheduled start: Execution (time) FSAVZTIMS6ATIME
FPPDATEEarliest scheduled start: Execution (date) FSAVDDATS8DATUM
FPPTIMEEarliest scheduled start: Execution (time) FSAVZTIMS6ATIME
FPESDATEEarliest scheduled start: Execution (date) FSAVDDATS8DATUM
FPESTIMEEarliest scheduled start: Execution (time) FSAVZTIMS6ATIME
FPPSDATEEarliest scheduled start: Execution (date) FSAVDDATS8DATUM
FPPSTIMEEarliest scheduled start: Execution (time) FSAVZTIMS6ATIME
ECKSTZEarliest scheduled start: Execution (time) FSAVZTIMS6ATIME
ECKENZEarliest scheduled start: Execution (time) FSAVZTIMS6ATIME
PROGSTZEarliest scheduled start: Execution (time) FSAVZTIMS6ATIME
PROGENZEarliest scheduled start: Execution (time) FSAVZTIMS6ATIME
EPANFEarliest scheduled start: Execution (date) FSAVDDATS8DATUM
EPANZEarliest scheduled start: Execution (time) FSAVZTIMS6ATIME
EPENDEarliest scheduled start: Execution (date) FSAVDDATS8DATUM
EPENZEarliest scheduled start: Execution (time) FSAVZTIMS6ATIME
EINSAConstraint on the basic start date for the activity EINSCHRACHAR1RESTRIKSTR
EINSEConstraint on the basic start date for the activity EINSCHRACHAR1RESTRIKSTR
EWSTDEarliest scheduled start: Execution (date) FSAVDDATS8DATUM
EWSTDZEarliest scheduled start: Execution (time) FSAVZTIMS6ATIME
EWENDEarliest scheduled start: Execution (date) FSAVDDATS8DATUM
EWENDZEarliest scheduled start: Execution (time) FSAVZTIMS6ATIME
EWSTAConstraint on the basic start date for the activity EINSCHRACHAR1RESTRIKSTR
EWSTEConstraint on the basic start date for the activity EINSCHRACHAR1RESTRIKSTR
ISBDEarliest scheduled start: Execution (date) FSAVDDATS8DATUM
ISBZEarliest scheduled start: Execution (time) FSAVZTIMS6ATIME
IEBDEarliest scheduled start: Execution (date) FSAVDDATS8DATUM
IEBZEarliest scheduled start: Execution (time) FSAVZTIMS6ATIME
PEDDEarliest scheduled start: Execution (date) FSAVDDATS8DATUM
PEDZEarliest scheduled start: Execution (time) FSAVZTIMS6ATIME
EINRUECKLevel in Project Hierarchy PS_STUFEINT13INT1
TABIXDocument table index for WBS elements PS_WBSINDINT410SYST_LONG
EXT_AUFNROrder Number AUFNRCHAR12Assigned to domainALPHAAUFNRANR
VORNROperation/Activity Number VORNRCHAR4NUMCVVORNRVGN
UVORNOperation/Activity Number VORNRCHAR4NUMCVVORNRVGN
NETZ_TABIXDocument table index for WBS elements PS_WBSINDINT410SYST_LONG
AUFNRDTNOrder Number AUFNRCHAR12Assigned to domainALPHAAUFNRANR
VORNRTNOperation/Activity Number VORNRCHAR4NUMCVVORNRVGN
NETZ_STUFELevel in Project Hierarchy PS_STUFEINT13INT1
START_TNSelection flag SELKZCHAR1SELKZ
CHART_IDIdentification of chart in bar chart BCCHARTIDINT410BCINT4
STD_SORTDocument table index for WBS elements PS_WBSINDINT410SYST_LONG
AUFNRDOrder Number AUFNRCHAR12Assigned to domainALPHAAUFNRANR
AUFPLRouting number of operations in the order CO_AUFPLNUMC10AUFPL
APLZLGeneral counter for order CO_APLZLNUMC8Assigned to domainCO_APLZL
AUFPTRouting number of operations in the order CO_AUFPLNUMC10AUFPL
APLZTGeneral counter for order CO_APLZLNUMC8Assigned to domainCO_APLZL
ROWNUMBERLine number in bar chart BCROWNUMBINT410BCINT4
PSINDDocument table index for WBS elements PS_WBSINDINT410SYST_LONG
NWINDDocument table index for networks PS_NWINDINT410SYST_LONG
FLINDIndex referring to record table for sequences INDEX_PLFLINT410TABIX
ACINDDoc. table index for activities PS_ACTINDINT410SYST_LONG
VEINDDoc. table index for activities PS_ACTINDINT410SYST_LONG
MSINDDocument table index for milestones PS_MSTINDINT410SYST_LONG
CRINDDocument table index for material components PS_MATINDINT410TABIX
OBJECTSelection flag SELKZCHAR1SELKZ
PSPNRWBS Element PS_POSNRNUMC8Assigned to domainABPSPPS_POSNR
LOEKZSelection flag SELKZCHAR1SELKZ
LOEVMSelection flag SELKZCHAR1SELKZ
KAPIDIndex to object CY_IND_OBJINT410SYST_LONG
HAS_TEXTSelection flag SELKZCHAR1SELKZ
FLG_VABSelection flag SELKZCHAR1SELKZ
DISPLAYSelection flag SELKZCHAR1SELKZ
DB_READSelection flag SELKZCHAR1SELKZ
BOX_IDIdentification for box in bar chart BCBOXIDINT410BCINT4
NODE_IDIdentification for nodes in bar chart BCNODEIDINT410BCINT4
GRID_IDIdentification for box in bar chart BCBOXIDINT410BCINT4
CAL_IDIdentification for box in bar chart BCBOXIDINT410BCINT4
FLG_DISPLAYSelection flag SELKZCHAR1SELKZ
FLG_COLAPSEDSelection flag SELKZCHAR1SELKZ
MARK_COPYSelection flag SELKZCHAR1SELKZ
MARKSelection flag SELKZCHAR1SELKZ
AUTYPOrder category AUFTYPNUMC2AUFTYP
AUARTOrder Type AUFARTCHAR4Assigned to domainAUFARTAAT
OWAERObject currency for network activity OWAERSCUKY5Assigned to domainWAERS
AUSBLENDENSelection flag SELKZCHAR1SELKZ
EDIT_IDIdentification for box in bar chart BCBOXIDINT410BCINT4
EDIT_FLDValue in value table BCVALSVALCHAR80TEXT80
KALNRCost Estimate Number for Cost Est. w/o Qty Structure CK_KALNRNUMC12Assigned to domainCK_KALNRKNR
NO_EDITSelection flag SELKZCHAR1SELKZ

Key field Non-key field



How do I retrieve data from SAP structure RCJ_PS_PPT using ABAP code?

As RCJ_PS_PPT is a database structure and not a table it does not store any data in the SAP data dictionary. The ABAP SELECT statement is therefore not appropriate and can not be performed on RCJ_PS_PPT as there is no data to select.

How to access SAP table RCJ_PS_PPT

Within an ECC or HANA version of SAP you can also view further information about RCJ_PS_PPT and the data within it using relevant transactions such as

SE11 (ABAP Dictionary Maintenance)
SM30 (Maintain Table Data)
SE80 (Object Navigator)
SE16 (Data Browser).