PSI_WE_POWL_OTB_ST SAP (Structrue for PS OrderToBill Projects POWL) Structure details
Description: Structrue for PS OrderToBill Projects POWL
Related tables to PSI_WE_POWL_OTB_ST
Access table PSI_WE_POWL_OTB_ST
Structure field list including key, data, relationships and ABAP select examples
PSI_WE_POWL_OTB_ST is a standard SAP Structure so does not store data like a database table does. It can be used to define the fields of other actual tables or to process "Structrue for PS OrderToBill Projects POWL" Information within sap ABAP programs.
This is done by declaring abap internal tables, work areas or database tables based on this Structure. These can then be used to store and process the required data appropriately.
i.e. DATA: wa_PSI_WE_POWL_OTB_ST TYPE PSI_WE_POWL_OTB_ST.
The PSI_WE_POWL_OTB_ST table consists of various fields, each holding specific information or linking keys about Structrue for PS OrderToBill Projects POWL data available in SAP. These include POST1 (PS: Short description (1st text line)), STTXT_INT (System Status), STTXT_EXT (Field for user status display), KIMSK (Selection mask for WBS element short IDs).. See below for full list along with technical details, documentation, text table, check tables, foreign key relationships, conversion routines, relevant tcodes and example ABAP select code etc. .
Delivery Class:Display/Maintenance via tcode SM30: Display/Maintenance Allowed but with Restrictions
SAP enhancement categories: Can Be Enhanced (Deep)
SAP PSI_WE_POWL_OTB_ST structure fields - Full list of fields found in SAP data dictionary
Field | Description | Data Element | Data Type | length (Dec) | Check table | Conversion Routine | Domain Name | MemoryID | SHLP |
PSPID | Project Definition | PS_PSPID | CHAR | 24 | ABPSN | PS_PSPID | PSP | PD_DUMMY | |
POST1 | PS: Short description (1st text line) | PS_POST1 | CHAR | 40 | TEXT40 | ||||
STTXT_INT | System Status | CO_STTXT | CHAR | 40 | CHAR40 | ||||
STTXT_EXT | Field for user status display | CO_STTXTU | CHAR | 40 | CHAR40 | ||||
KIMSK | Selection mask for WBS element short IDs | PS_KIMSK | CHAR | 24 | PS_PROID | ||||
VERNR | Number of the responsible person (project manager) | PS_VERNR | NUMC | 8 | Assigned to domain | PS_VERNR | |||
VERNA | Name of responsible person (Project manager) | PS_VERNA | CHAR | 25 | PS_VERNA | ||||
ASTNR | Applicant number | PS_ASTNR | NUMC | 8 | Assigned to domain | PS_ASTNR | |||
PLFAZ | Project planned start date | PS_PLFAZ | DATS | 8 | DATUM | ||||
PLSEZ | Project planned finish date | PS_PLSEZ | DATS | 8 | DATUM | ||||
KALID | Factory calendar key | FABKL | CHAR | 2 | Assigned to domain | WFCID | |||
ZTEHT | Time unit in time scheduling | PS_ZTEHT | UNIT | 3 | Assigned to domain | CUNIT | MEINS | ||
SPROG | Forecast start date of project definition | PS_SPROG | DATS | 8 | DATE | ||||
EPROG | Forecast finish date for project definition | PS_EPROG | DATS | 8 | DATE | ||||
VKOKR | Controlling area for the project | PS_VKOKR | CHAR | 4 | Assigned to domain | CACCD | CAC | ||
VBUKR | Company code for the project | PS_VBUKR | CHAR | 4 | Assigned to domain | BUKRS | BUK | ||
VGSBR | Business area for the project | PS_VGSBR | CHAR | 4 | Assigned to domain | GSBER | GSB | ||
WERKS | Plant | WERKS_D | CHAR | 4 | Assigned to domain | WERKS | WRK | H_T001W_C | |
STORT | Location | PS_STORT | CHAR | 10 | Assigned to domain | AP_STAND | |||
FUNC_AREA | Functional Area | FKBER | CHAR | 16 | Assigned to domain | FKBER | FBE | ||
PRCTR | Profit Center | PRCTR | CHAR | 10 | Assigned to domain | ALPHA | PRCTR | PRC | PRCTR_EMPTY |
PWHIE | WBS currency (project definition) | PS_PWHIE | CUKY | 5 | Assigned to domain | WAERS | |||
PROFL | Project Profile | PROFIDPROJ | CHAR | 7 | Assigned to domain | PROFIDPROJ | PWS | ||
BPROF | Budget Profile | BP_BPROFIL | CHAR | 6 | Assigned to domain | BP_PROFIL | BP1 | ||
PPROF | Planning profile | BP_PPROFIL | CHAR | 6 | Assigned to domain | BP_PROFIL | BP1 | ||
ZSCHM | Interest Profile for Project/Order Interest Calculation | PS_ZSCHM | CHAR | 7 | Assigned to domain | PS_ZSCHM | |||
IMPRF | Investment measure profile | IM_PROFIL | CHAR | 6 | Assigned to domain | IM_PROFIL | |||
ABGSL | Results Analysis Key | ABGR_SCHL | CHAR | 6 | Assigned to domain | ABGR_SCHL | ACS | ||
SMPRF | Simulation profile | SIM_PROFIL | CHAR | 7 | Assigned to domain | SIM_PROFIL | |||
PARGR | Partner Determination Procedure | PARGR | CHAR | 4 | Assigned to domain | PARGR | |||
SCOPE | Object Class | SCOPE_CV | CHAR | 2 | SCOPE | SCOPE_CV | PCO | ||
TXJCD | Tax Jurisdiction | TXJCD | CHAR | 15 | Assigned to domain | TXJCD | TXJ | ||
STSPR | Status profile for WBS element | PS_STSPR | CHAR | 8 | Assigned to domain | J_STSMA | |||
VPROF | Network profile | PROFIDNZPL | CHAR | 7 | Assigned to domain | PROFILID | PNW | ||
SCPRF | Profile for WBS scheduling | PS_SCHDPRF | CHAR | 12 | Assigned to domain | PS_SCHDPRF | |||
SCHTYP | Scheduling scenario | PS_SCHED_TYPE | CHAR | 1 | PS_SCHED_TYPE | ||||
VGPLF | Planning method for project basic dates | PS_VGPLF | NUMC | 1 | PSPLFRM | ||||
EWPLF | Planning method for project forecast dates | PS_EWPLF | NUMC | 1 | PSPLFRM | ||||
ZUORD | Network assignment | PS_ZUORD | NUMC | 1 | PS_ZUORD | ||||
BESTA | Project stock | PS_BESTAND | CHAR | 1 | XFELD | ||||
XSTAT | Statistical WBS element | PS_XSTAT | CHAR | 1 | XFELD | ||||
PLINT | Indicator for Integrated Planning | PLINT | CHAR | 1 | XFELD | ||||
GRTOP | Indicator: Automatic requirements grouping | GRONTOP | CHAR | 1 | XFELD | ||||
ERNAM | Name of Person who Created the Object | ERNAM | CHAR | 12 | USNAM | ||||
AENAM | Name of Person Who Changed Object | AENAM | CHAR | 12 | USNAM | ||||
ERDAT | Date on Which Record Was Created | ERDAT | DATS | 8 | DATUM | ||||
AEDAT | Changed On | AEDAT | DATS | 8 | DATUM | ||||
AEDTE | Date of last scheduling of the overall network (basic dates) | PS_AEDTE | DATS | 8 | DATUM | ||||
AEDTP | Date of last scheduling of the overall network (forecast) | PS_AEDTP | DATS | 8 | DATUM | ||||
PARVW | Partner Function | PARVW | CHAR | 2 | Assigned to domain | PARVW | PARVW | PAR | |
PARNR | Partner | I_PARNR | CHAR | 12 | ALPHA | I_PARNR | |||
STAFFING_EXISTS | Checkbox to Mark Staffed Projects | PS_STAFFING_EXIST_DE | CHAR | 1 | PS_STAFFING_EXIST_DO | ||||
POSID | Work Breakdown Structure Element (WBS Element) | PS_POSID | CHAR | 24 | PROJN | PS_POSID | PRO | ||
POST1_WBS | PS: Short description (1st text line) | PS_POST1 | CHAR | 40 | TEXT40 | ||||
PRART | Project type | PS_PRART | CHAR | 2 | Assigned to domain | PS_PRART | |||
POSKI | WBS element short identification | PS_POSKI | CHAR | 16 | PS_PROKI | ||||
PSPRI | Priority | NW_PRIO | CHAR | 1 | Assigned to domain | NW_PRIO | |||
CLASF | Indicator: WBS element used in project summarization | PS_CLASF | CHAR | 1 | XFELD | ||||
STTXT_INT_WBS | System Status | CO_STTXT | CHAR | 40 | CHAR40 | ||||
STTXT_EXT_WBS | Field for user status display | CO_STTXTU | CHAR | 40 | CHAR40 | ||||
VERNR_WBS | Number of the responsible person (project manager) | PS_VERNR | NUMC | 8 | Assigned to domain | PS_VERNR | |||
ASTNR_WBS | Applicant number | PS_ASTNR | NUMC | 8 | Assigned to domain | PS_ASTNR | |||
FKOKR | Controlling area of responsible cost center | PS_FKOKR | CHAR | 4 | Assigned to domain | CACCD | CAC | ||
FKSTL | Responsible cost center | PS_FKSTL | CHAR | 10 | Assigned to domain | ALPHA | KOSTL | KOS | |
AKOKR | Controlling area of requesting cost center | PS_AKOKR | CHAR | 4 | Assigned to domain | CACCD | CAC | ||
AKSTL | Requesting cost center | PS_AKSTL | CHAR | 10 | Assigned to domain | ALPHA | KOSTL | KOS | |
ABUKR | Requesting company code | IM_ABUKRS | CHAR | 4 | Assigned to domain | BUKRS | BUK | ||
PLAKZ | Indicator: Planning element | PS_PLAKZ | CHAR | 1 | XFELD | ||||
BELKZ | Indicator: Account assignment element | PS_BELKZ | CHAR | 1 | XFELD | ||||
FAKKZ | Indicator: Billing element | PS_FAKKZ | CHAR | 1 | XFELD | ||||
GRPKZ | Indicator: Grouping WBS element | GRPSPKZ | CHAR | 1 | GRPSPKZ | ||||
PSTRT | WBS element: Basic start date | PS_PSTRT | DATS | 8 | DATUM | ||||
PENDE | WBS element: Basic finish date | PS_PENDE | DATS | 8 | DATUM | ||||
PEINH | Unit for duration of basic WBS element dates | PS_PEINH | UNIT | 3 | CUNIT | EINHEIT | |||
PDAUR | Length (duration) of the basic dates in the WBS element | PS_PDAUR | QUAN | 5(1) | DAUER_4_1 | ||||
PSTRM | Earliest scheduled start date (Basic) | PS_GSTRS | DATS | 8 | DATUM | ||||
PETRF | Earliest scheduled finish date (basic) | PS_GETRE | DATS | 8 | DATUM | ||||
PSTRS | Latest scheduled start date (basic) | PS_GSTRE | DATS | 8 | DATUM | ||||
PETRM | Latest scheduled finish date (basic) | PS_GLTRS | DATS | 8 | DATUM | ||||
ESTRT | Forecasted start date of the WBS element | PS_ESTRT | DATS | 8 | DATUM | ||||
EENDE | Forecasted finish date of the WBS element | PS_EENDE | DATS | 8 | DATUM | ||||
EDAUR | Forecasted length (duration) of the WBS element | PS_EDAUR | QUAN | 5(1) | DAUER_4_1 | ||||
ESTRM | Scheduled start date (Forecast) | PS_GSTPP | DATS | 8 | DATUM | ||||
EETRF | Earliest scheduled finish date (forecast) | PS_GLTRP | DATS | 8 | DATUM | ||||
ESTRS | Latest scheduled start date (forecast) | PS_GSTRP | DATS | 8 | DATUM | ||||
EETRM | Latest scheduled finish date (Forecast) | PS_GLTPP | DATS | 8 | DATUM | ||||
ISTRT | Actual start date for the WBS element | PS_ISTRT | DATS | 8 | DATUM | ||||
IENDE | Actual finish date of the WBS element | PS_IENDE | DATS | 8 | DATUM | ||||
IDAUR | Actual length (duration) of the WBS element | PS_IDAUR | QUAN | 5(1) | DAUER_4_1 | ||||
VISTR | Tentative actual start date for WBS element | PS_ISTVORL | DATS | 8 | DATUM | ||||
VIEND | Tentative actual finish date for WBS element | PS_IENVORL | DATS | 8 | DATUM | ||||
FABKL | Factory calendar key | FABKL | CHAR | 2 | Assigned to domain | WFCID | |||
PKOKR | Controlling area for WBS element | PS_PKOKR | CHAR | 4 | Assigned to domain | CACCD | CAC | ||
PBUKR | Company code for WBS element | PS_PBUKR | CHAR | 4 | Assigned to domain | BUKRS | BUK | ||
PGSBR | Business area for WBS element | PS_PGSBR | CHAR | 4 | Assigned to domain | GSBER | GSB | ||
FUNC_AREA_WBS | Functional Area | FKBER | CHAR | 16 | Assigned to domain | FKBER | FBE | ||
PRCTR_WBS | Profit Center | PRCTR | CHAR | 10 | Assigned to domain | ALPHA | PRCTR | PRC | PRCTR_EMPTY |
SCOPE_WBS | Object Class | SCOPE_CV | CHAR | 2 | SCOPE | SCOPE_CV | PCO | ||
PWPOS | WBS element currency | PS_PWPOS | CUKY | 5 | Assigned to domain | WAERS | |||
TXJCD_WBS | Tax Jurisdiction | TXJCD | CHAR | 15 | Assigned to domain | TXJCD | TXJ | ||
SUBPR | Sub-project in work breakdown structure | PS_SUBPR | CHAR | 12 | Assigned to domain | PS_SUBPR | |||
WERKS_WBS | Plant | WERKS_D | CHAR | 4 | Assigned to domain | WERKS | WRK | H_T001W_C | |
STORT_WBS | Location | PS_STORT | CHAR | 10 | Assigned to domain | AP_STAND | |||
FABKL_WBS | Factory calendar key | FABKL | CHAR | 2 | Assigned to domain | WFCID | |||
EQUNR | Equipment Number | EQUNR | CHAR | 18 | Assigned to domain | ALPHA | EQUNR | EQN | EQUI |
TPLNR | Functional Location | TPLNR | CHAR | 30 | Assigned to domain | TPLNR | TPLNR | IFL | IFLM |
AENNR | Change Number | AENNR | CHAR | 12 | Assigned to domain | AENNR | AENNR | AEN | |
AUTOD | Automatic value transfer from WBS element to project def. | PS_AUTOD | CHAR | 1 | XFELD | ||||
KALSM | Costing Sheet | AUFKALSM | CHAR | 6 | Assigned to domain | KALSM | |||
ZSCHL | Overhead key | AUFZSCHL | CHAR | 6 | CHAR6 | ||||
ZSCHM_WBS | Interest Profile for Project/Order Interest Calculation | PS_ZSCHM | CHAR | 7 | Assigned to domain | PS_ZSCHM | |||
ZTEXT | Name of Interest Calc.Profile | PS_ZSCHT | CHAR | 50 | TXT50 | ||||
IMPRF_WBS | Investment measure profile | IM_PROFIL | CHAR | 6 | Assigned to domain | IM_PROFIL | |||
ABGSL_WBS | Results Analysis Key | ABGR_SCHL | CHAR | 6 | Assigned to domain | ABGR_SCHL | ACS | ||
TEXTA | Character Field for Text Table | KKATEXT | CHAR | 40 | KKATEXT | ||||
XSTAT_WBS | Statistical WBS element | PS_XSTAT | CHAR | 1 | XFELD | ||||
PLINT_WBS | Indicator for Integrated Planning | PLINT | CHAR | 1 | XFELD | ||||
ZUORD_WBS | Network assignment | PS_ZUORD | NUMC | 1 | PS_ZUORD | ||||
DDTX3 | Explanatory short text | DDTEXT | CHAR | 60 | DDTEXT | ||||
VGPLF_WBS | Planning method for project basic dates | PS_VGPLF | NUMC | 1 | PSPLFRM | ||||
DDTX1 | Explanatory short text | DDTEXT | CHAR | 60 | DDTEXT | ||||
EWPLF_WBS | Planning method for project forecast dates | PS_EWPLF | NUMC | 1 | PSPLFRM | ||||
DDTX2 | Explanatory short text | DDTEXT | CHAR | 60 | DDTEXT | ||||
IZWEK | Reason for investment | IZWEK | CHAR | 2 | Assigned to domain | IZWEK | |||
IUMKZ | Reason for environmental investment | AM_UMWKZ | CHAR | 5 | Assigned to domain | AM_UMWKZ | |||
SLWID | Key word ID for user-defined fields | SLWID | CHAR | 7 | Assigned to domain | SLWID | |||
USR00 | 1st user field for 20 characters - WBS element- | USR00PRPS | CHAR | 20 | USRCHAR20 | ||||
USR00PRPS | 2nd user field 20 digits - WBS element | USR01PRPS | CHAR | 20 | USRCHAR20 | ||||
USR02 | 3rd user-defined field 10 digits -WBS element | USR02PRPS | CHAR | 10 | USRCHAR10 | ||||
USR03 | 4th user-defined field 10 digits -WBS element | USR03PRPS | CHAR | 10 | USRCHAR10 | ||||
USR04 | 1st user-defined field for quantity(length 10,3) WBS element | USR04PRPS | QUAN | 13(3) | USRQUAN13 | ||||
USE04 | 1st user defined field for quantity field unit - WBS element | USE04PRPS | UNIT | 3 | Assigned to domain | CUNIT | MEINS | ||
USR05 | 2nd use field for quantity (length 10,3) WBS element | USR05PRPS | QUAN | 13(3) | USRQUAN13 | ||||
USE05 | 2nd user defined field for quantity field unit - WBS element | USE05PRPS | UNIT | 3 | Assigned to domain | CUNIT | MEINS | ||
USR06 | 1st user field for values (length 10,3) WBS element | USR06PRPS | CURR | 13(3) | USRCURR13 | ||||
USE06 | 1st user defined field for value field unit - WBS element | USE06PRPS | CUKY | 5 | Assigned to domain | WAERS | |||
USR07 | 2nd user field for values (length 10,3) -WBS element | USR07PRPS | CURR | 13(3) | USRCURR13 | ||||
USE07 | 2nd user defined field for value field unit - WBS element | USE07PRPS | CUKY | 5 | Assigned to domain | WAERS | |||
USR08 | 1st user field for date -WBS element | USR08PRPS | DATS | 8 | USRDATE | ||||
USR09 | 2nd user field for date -WBS element | USR09PRPS | DATS | 8 | USRDATE | ||||
USR10 | 1st user field for 'Ind. for evaluations' WBS elem. | USR10PRPS | CHAR | 1 | FLAG | ||||
USR11 | 2nd user field for 'Indicator for eval.s' WBS elemnt | USR11PRPS | CHAR | 1 | FLAG | ||||
ERNAM_WBS | Name of Person who Created the Object | ERNAM | CHAR | 12 | USNAM | ||||
AENAM_WBS | Name of Person Who Changed Object | AENAM | CHAR | 12 | USNAM | ||||
ERDAT_WBS | Date on Which Record Was Created | ERDAT | DATS | 8 | DATUM | ||||
AEDAT_WBS | Date on which object was last changed | UPDAT | DATS | 8 | DATUM | ||||
STUFE | Level in Project Hierarchy | PS_STUFE | INT1 | 3 | INT1 | ||||
KOSTL_WBS | Cost Center | KOSTL | CHAR | 10 | Assigned to domain | ALPHA | KOSTL | KOS | |
PARVW_WBS | Partner Function | PARVW | CHAR | 2 | Assigned to domain | PARVW | PARVW | PAR | |
PARNR_WBS | Partner | I_PARNR | CHAR | 12 | ALPHA | I_PARNR | |||
PROJ_STATUS | Status Combination | ACTCMB_DELE | INT1 | 3 | ACTCMB_DOM | ||||
KOSTL | Cost Center | KOSTL | CHAR | 10 | Assigned to domain | ALPHA | KOSTL | KOS | |
PRPS_STATUS | Status Combination | ACTCMB_DELE | INT1 | 3 | ACTCMB_DOM | ||||
OBJNR | Object number | J_OBJNR | CHAR | 22 | Assigned to domain | J_OBJNR | ONR | ||
OBJNR_WBS | Object number | J_OBJNR | CHAR | 22 | Assigned to domain | J_OBJNR | ONR | ||
PSPNR | WBS Element | PS_POSNR | NUMC | 8 | Assigned to domain | ABPSP | PS_POSNR | ||
VERNA_WBS | Name of responsible person (Project manager) | PS_VERNA | CHAR | 25 | PS_VERNA | ||||
.INCLU--AP | 0 | ||||||||
KUNAG | Sold-to party | KUNAG | CHAR | 10 | Assigned to domain | ALPHA | KUNNR | VAG | |
VBELN | Sales and Distribution Document Number | VBELN | CHAR | 10 | Assigned to domain | ALPHA | VBELN | AUN | |
STAFFING_STAGE | Staff Assignment Work Engagement Staffing Stage | SAWE_WE_STAFFING_STAGE | CHAR | 6 | Assigned to domain | SAWE_WE_STAFFING_STAGE | |||
STAFFING_STAGE_DESC | Text, 255 Characters | TEXT255 | CHAR | 255 | TEXT255 |
Key field | Non-key field |
How do I retrieve data from SAP structure PSI_WE_POWL_OTB_ST using ABAP code?
As PSI_WE_POWL_OTB_ST is a database structure and not a table it does not store any data in the SAP data dictionary. The ABAP SELECT statement is therefore not appropriate and can not be performed on PSI_WE_POWL_OTB_ST as there is no data to select.How to access SAP table PSI_WE_POWL_OTB_ST
Within an ECC or HANA version of SAP you can also view further information about PSI_WE_POWL_OTB_ST and the data within it using relevant transactions such asSE11 (ABAP Dictionary Maintenance)
SM30 (Maintain Table Data)
SE80 (Object Navigator)
SE16 (Data Browser).
Search for further information about these or an SAP related objects