PSHLP_WBS_DATE_ST SAP (WBS Dates Output Structure) Structure details
Description: WBS Dates Output Structure
Related tables to PSHLP_WBS_DATE_ST
Access table PSHLP_WBS_DATE_ST
Structure field list including key, data, relationships and ABAP select examples
PSHLP_WBS_DATE_ST is a standard SAP Structure so does not store data like a database table does. It can be used to define the fields of other actual tables or to process "WBS Dates Output Structure" Information within sap ABAP programs.
This is done by declaring abap internal tables, work areas or database tables based on this Structure. These can then be used to store and process the required data appropriately.
i.e. DATA: wa_PSHLP_WBS_DATE_ST TYPE PSHLP_WBS_DATE_ST.
The PSHLP_WBS_DATE_ST table consists of various fields, each holding specific information or linking keys about WBS Dates Output Structure data available in SAP. These include POSID (Work Breakdown Structure Element (WBS Element)), OBJNR (Object number), FABKL (Factory calendar key), PSPHI (Current number of the appropriate project).. See below for full list along with technical details, documentation, text table, check tables, foreign key relationships, conversion routines, relevant tcodes and example ABAP select code etc. .
Delivery Class:Display/Maintenance via tcode SM30: Display/Maintenance Allowed but with Restrictions
SAP enhancement categories: Can Be Enhanced (Deep)
SAP PSHLP_WBS_DATE_ST structure fields - Full list of fields found in SAP data dictionary
Field | Description | Data Element | Data Type | length (Dec) | Check table | Conversion Routine | Domain Name | MemoryID | SHLP |
PSPNR | WBS Element | PS_POSNR | NUMC | 8 | Assigned to domain | ABPSP | PS_POSNR | ||
POSID | Work Breakdown Structure Element (WBS Element) | PS_POSID | CHAR | 24 | PROJN | PS_POSID | PRO | ||
OBJNR | Object number | J_OBJNR | CHAR | 22 | Assigned to domain | J_OBJNR | ONR | ||
FABKL | Factory calendar key | FABKL | CHAR | 2 | Assigned to domain | WFCID | |||
PSPHI | Current number of the appropriate project | PS_PSPHI | NUMC | 8 | Assigned to domain | KONPD | PS_PSPNR | ||
PSTRT | WBS element: Basic start date | PS_PSTRT | DATS | 8 | DATUM | ||||
ESTRT | Forecasted start date of the WBS element | PS_ESTRT | DATS | 8 | DATUM | ||||
ISTRT | Actual start date for the WBS element | PS_ISTRT | DATS | 8 | DATUM | ||||
PENDE | WBS element: Basic finish date | PS_PENDE | DATS | 8 | DATUM | ||||
EENDE | Forecasted finish date of the WBS element | PS_EENDE | DATS | 8 | DATUM | ||||
IENDE | Actual finish date of the WBS element | PS_IENDE | DATS | 8 | DATUM | ||||
PDAUR | Length (duration) of the basic dates in the WBS element | PS_PDAUR | QUAN | 5(1) | DAUER_4_1 | ||||
EDAUR | Forecasted length (duration) of the WBS element | PS_EDAUR | QUAN | 5(1) | DAUER_4_1 | ||||
IDAUR | Actual length (duration) of the WBS element | PS_IDAUR | QUAN | 5(1) | DAUER_4_1 | ||||
IEINH | Unit for duration of actual WBS element dates | PS_IEINH | UNIT | 3 | CUNIT | EINHEIT | |||
EEINH | Unit for duration of WBS element planned dates | PS_EEINH | UNIT | 3 | CUNIT | EINHEIT | |||
PEINH | Unit for duration of basic WBS element dates | PS_PEINH | UNIT | 3 | CUNIT | EINHEIT | |||
FLGVG | Indicator: There are activities for the WBS elements | PS_FLGVG | CHAR | 1 | X | ||||
FLGEW | Indicator: Expected dates from the activities | PS_FLGEW | CHAR | 1 | X | ||||
FLGEM | Indicator: Forecast dates set manually | PS_FLGEM | CHAR | 1 | X | ||||
FLGVM | Indicator: Basic dates set manually | PS_FLGVM | CHAR | 1 | X | ||||
FLGIM | Indicator: Actual dates set manually | PS_FLGIM | CHAR | 1 | X | ||||
FLGVI | Indicator: Actual dates from the activities | PS_FLGVI | CHAR | 1 | X | ||||
PSTRM | Earliest scheduled start date (Basic) | PS_GSTRS | DATS | 8 | DATUM | ||||
PETRM | Latest scheduled finish date (basic) | PS_GLTRS | DATS | 8 | DATUM | ||||
ESTRM | Scheduled start date (Forecast) | PS_GSTPP | DATS | 8 | DATUM | ||||
EETRM | Latest scheduled finish date (Forecast) | PS_GLTPP | DATS | 8 | DATUM | ||||
VISTR | Tentative actual start date for WBS element | PS_ISTVORL | DATS | 8 | DATUM | ||||
VIEND | Tentative actual finish date for WBS element | PS_IENVORL | DATS | 8 | DATUM | ||||
PSTRS | Latest scheduled start date (basic) | PS_GSTRE | DATS | 8 | DATUM | ||||
PETRF | Earliest scheduled finish date (basic) | PS_GETRE | DATS | 8 | DATUM | ||||
ESTRS | Latest scheduled start date (forecast) | PS_GSTRP | DATS | 8 | DATUM | ||||
EETRF | Earliest scheduled finish date (forecast) | PS_GLTRP | DATS | 8 | DATUM | ||||
ACTIVE | Data element for domain BOOLE: TRUE (='X') and FALSE (=' ') | BOOLE_D | CHAR | 1 | BOOLE | ||||
DISPLAY | Data element for domain BOOLE: TRUE (='X') and FALSE (=' ') | BOOLE_D | CHAR | 1 | BOOLE | ||||
STUFE | Level in Project Hierarchy | PS_STUFE | INT1 | 3 | INT1 | ||||
POST1 | PS: Short description (1st text line) | PS_POST1 | CHAR | 40 | TEXT40 |
Key field | Non-key field |
How do I retrieve data from SAP structure PSHLP_WBS_DATE_ST using ABAP code?
As PSHLP_WBS_DATE_ST is a database structure and not a table it does not store any data in the SAP data dictionary. The ABAP SELECT statement is therefore not appropriate and can not be performed on PSHLP_WBS_DATE_ST as there is no data to select.How to access SAP table PSHLP_WBS_DATE_ST
Within an ECC or HANA version of SAP you can also view further information about PSHLP_WBS_DATE_ST and the data within it using relevant transactions such asSE11 (ABAP Dictionary Maintenance)
SM30 (Maintain Table Data)
SE80 (Object Navigator)
SE16 (Data Browser).
Search for further information about these or an SAP related objects