PSHLP_ACTY_ALL_DATES_OVR_ST SAP (PS HLP Activity All Dates Overview Dates) Structure details

Dictionary Type: Structure
Description: PS HLP Activity All Dates Overview Dates




ABAP Code to SELECT data from PSHLP_ACTY_ALL_DATES_OVR_ST
Related tables to PSHLP_ACTY_ALL_DATES_OVR_ST
Access table PSHLP_ACTY_ALL_DATES_OVR_ST




Structure field list including key, data, relationships and ABAP select examples

PSHLP_ACTY_ALL_DATES_OVR_ST is a standard SAP Structure so does not store data like a database table does. It can be used to define the fields of other actual tables or to process "PS HLP Activity All Dates Overview Dates" Information within sap ABAP programs.

This is done by declaring abap internal tables, work areas or database tables based on this Structure. These can then be used to store and process the required data appropriately.

i.e. DATA: wa_PSHLP_ACTY_ALL_DATES_OVR_ST TYPE PSHLP_ACTY_ALL_DATES_OVR_ST.

The PSHLP_ACTY_ALL_DATES_OVR_ST table consists of various fields, each holding specific information or linking keys about PS HLP Activity All Dates Overview Dates data available in SAP. These include EXCEPTION (Icon in text fields (substitute display, alias)), AUFNR (Order Number), VORNR (Operation/Activity Number), UVORN (Suboperation).. See below for full list along with technical details, documentation, text table, check tables, foreign key relationships, conversion routines, relevant tcodes and example ABAP select code etc. .

Delivery Class:
Display/Maintenance via tcode SM30: Display/Maintenance Allowed but with Restrictions
SAP enhancement categories: Can Be Enhanced (Deep)


SAP PSHLP_ACTY_ALL_DATES_OVR_ST structure fields - Full list of fields found in SAP data dictionary

Field Description Data Element Data Type length (Dec) Check table Conversion Routine Domain Name MemoryID SHLP
EXCEPTIONIcon in text fields (substitute display, alias) ICON_DCHAR4Assigned to domainICON
AUFNROrder Number AUFNRCHAR12Assigned to domainALPHAAUFNRANR
VORNROperation/Activity Number VORNRCHAR4NUMCVVORNRVGN
UVORNSuboperation UVORNCHAR4NUMCVVORNR
ACTY_TYPE_TEXTDescription AUFTEXTCHAR40TEXT40
LTXA1Operation short text LTXA1CHAR40TEXT40
DDEHNIndicator: flexible duration DAUDEHNCHAR1X
KALIDFactory Calendar WFCIDCHAR2TFACDWFCIDFCI
RSTRAReduction strategy per operation/activity RSTRACHAR2T499QRSTRA
PLIFZPlanned Delivery Time in Days PLIFZDEC3DEC3
EPANFDispatched start date for operation EPANFDATS8DATUM
EPANZDispatched start time for operation EPANZTIMS6ATIME
ARBEIWork involved in the activity ARBEITQUAN7(1) ARBEIT
ARBEHUnit for work ARBEITEUNIT3T006CUNITMEINS
OFMNWForecasted work (actual + remaining) OFMNWQUAN7(1) ARBEIT
CELLTAB 0
COLOR_TAB 0
OFFSTBOffset to sub-operation start CP_OOFFSTBQUAN5VNZTV
EHOFFBUnit for offset to start CP_OEHOFFBUNIT3T006CUNITMEINS
OFFSTEOffset to sub-operation finish CP_OOFFSTEQUAN5VNZTV
EHOFFEUnit for offset to finish CP_OEHOFFEUNIT3T006CUNITMEINS
DAUNOBasic Duration PSHLP_BASIC_DURATION_DEQUAN5(1) DAUER_4_1
ORIG_BASIC_DURATIONOriginal Basic Duration PSHLP_ORIG_BASIC_DURATION_DEQUAN5(1) DAUER_4_1
LAST_BASIC_DURATIONLast Basic Duration PSHLP_LAST_BASIC_DURATION_DEQUAN5(1) DAUER_4_1
DAUNEBasic Duration Unit PSHLP_ACTY_BAS_DUR_UNIT_DEUNIT3T006CUNITMEINS
ORIG_BASIC_DUR_UNITUnit of Original Basic Duration PSHLP_ORIG_BAS_DUR_UNIT_DEUNIT3CUNITEINHEIT
LAST_BASIC_DUR_UNITUnit of Last Basic Duration PSHLP_LAST_BAS_DUR_UNIT_DEUNIT3CUNITEINHEIT
DAUMIMinimum activity duration DAUMINQUAN5(1) DAUER_4_1
DAUMEUnit for the minimum duration DAUMINEUNIT3T006CUNITMEINS
EWDANForecast Duration PSHLP_FORECAST_DURATION_DEQUAN5(1) DAUER_4_1
ORIG_FORECAST_DURATIONOriginal Forecast Duration PSHLP_ORIG_FRCST_DURATION_DEQUAN5(1) DAUER_4_1
LAST_FORECAST_DURATIONLast Forecast Duration PSHLP_LAST_FRCST_DURATION_DEQUAN5(1) DAUER_4_1
EWDNEForecast Duration Unit PSHLP_ACTY_FRCST_DUR_UNIT_DEUNIT3T006CUNITMEINS
ORIG_FORECAST_DUR_UNITOriginal Forecast Duration Unit PSHLP_ORIG_FRCST_DUR_UNIT_DEUNIT3CUNITEINHEIT
LAST_FORECAST_DUR_UNITUnit of Last Forecast Duration PSHLP_LAST_FRCST_DUR_UNIT_DEUNIT3CUNITEINHEIT
EWDAMMinimum duration (from forecast) for activity EWDAMQUAN5(1) DAUER_4_1
EWDMEUnit for forecast minimum duration EWDMEUNIT3T006CUNITMEINS
FSAVDBasic Start Date (Earliest) PSHLP_BAS_EARL_START_DEDATS8DATUM
FSAVZEarliest scheduled start: Execution (time) FSAVZTIMS6ATIME
ORIG_BASIC_EAR_STARTOriginal Basic Start Date (Earliest) PSHLP_ORIG_BAS_EARL_START_DEDATS8DATUM
LAST_BASIC_EAR_STARTLast Basic Start Date (Earliest) PSHLP_LAST_BAS_EARL_START_DEDATS8DATUM
FSEDDBasic Finish Date (Earliest) PSHLP_BAS_EARL_FINISH_DEDATS8DATUM
FSEDZEarliest scheduled finish: Execution (time) FSEDZTIMS6ATIME
ORIG_BASIC_EAR_FINISHOriginal Basic Finish Date (Earliest) PSHLP_ORIG_BAS_EARL_FINISH_DEDATS8DATUM
LAST_BASIC_EAR_FINISHLast Basic Finish Date (Earliest) PSHLP_LAST_BAS_EARL_FINISH_DEDATS8DATUM
SSAVDBasic Start Date (Latest) PSHLP_BASIC_LATEST_START_DEDATS8DATUM
SSAVZLatest scheduled start: Execution (time) SSAVZTIMS6ATIME
ORIG_BASIC_LAT_STARTOriginal Basic Start Date (Latest) PSHLP_ORIG_BAS_LATEST_START_DEDATS8DATUM
LAST_BASIC_LAT_STARTLast Basic Start Date (Latest) PSHLP_LAST_BAS_LATEST_START_DEDATS8DATUM
SSEDDBasic Finish Date (Latest) PSHLP_BASIC_LATEST_FINISH_DEDATS8DATUM
SSEDZLatest scheduled finish: Execution (time) SSEDZTIMS6ATIME
ORIG_BASIC_LAT_FINISHOriginal Basic Finish Date (Latest) PSHLP_ORIG_BAS_LATEST_FIN_DEDATS8DATUM
LAST_BASIC_LAT_FINISHLast Basic Finish Date (Latest) PSHLP_LAST_BAS_LATEST_FIN_DEDATS8DATUM
PUFGSTotal float PUFFR_GESMDEC3PUFFER
PUFFRFree float PUFFR_FREIDEC3PUFFER
EINSAConstraint on the basic start date for the activity EINSCHRACHAR1RESTRIKSTR
EINSEConstraint on the finish date of the activity EINSCHRECHAR1RESTRIKEND
NTANFConstraint for activity start (Basic) VORGABESTDDATS8VORGABESTR
NTANZConstraint for activity start time (Basic) VORGABESTZTIMS6ATIME
NTENDConstraint for Finish of Activity (Basic) VORGABEEND2DATS8VORGABEEND
NTENZBasic finish time of the activity VORGABEENZTIMS6ATIME
FRSPEarliest possible activity / Latest possible activity FRSPCHAR1FRSP
FPAVDForecast Start Date (Earliest) PSHLP_FRCST_EARL_START_DEDATS8DATUM
FPAVZEarliest scheduled start time (forecast) FPAVZTIMS6ATIME
ORIG_FORECAST_EAR_STARTOriginal Forecast Start Date (Earliest) PSHLP_ORIG_FCST_EAR_START_DEDATS8DATUM
LAST_FORECAST_EAR_STARTLast Forecast Start Date (Earliest) PSHLP_LAST_FCST_EAR_START_DEDATS8DATUM
FPEDDForecast Finish Date (Earliest) PSHLP_FRCST_EARL_FINISH_DEDATS8DATUM
FPEDZEarliest scheduled finish time (forecast) FPEDZTIMS6ATIME
ORIG_FORECAST_EAR_FINISHOriginal Forecast Finish Date (Earliest) PSHLP_ORIG_FCST_EAR_FIN_DEDATS8DATUM
LAST_FORECAST_EAR_FINISHLast Forecast Finish Date (Earliest) PSHLP_LAST_FCST_EAR_FIN_DEDATS8DATUM
SPAVDForecast Start Date (Latest) PSHLP_FRCST_LATEST_START_DEDATS8DATUM
SPAVZLatest scheduled start time (forecast) SPAVZTIMS6ATIME
ORIG_FORECAST_LAT_STARTOriginal Forecast Start Date (Latest) PSHLP_ORIG_FCST_LATST_START_DEDATS8DATUM
LAST_FORECAST_LAT_STARTLast Forecast Start Date (Latest) PSHLP_LAST_FCST_LATST_START_DEDATS8DATUM
SPEDDForecast Finish Date (Latest) PSHLP_FRCST_LATEST_FINISH_DEDATS8DATUM
SPEDZLatest scheduled finish time (forecast) SPEDZTIMS6ATIME
ORIG_FORECAST_LAT_FINISHOriginal Forecast Finish Date (Latest) PSHLP_ORIG_FCST_LATST_FIN_DEDATS8DATUM
LAST_FORECAST_LAT_FINISHLast Forecast Finish Date (Latest) PSHLP_LAST_FCST_LATST_FIN_DEDATS8DATUM
DAPBEDuration of processing time (forecast) CO_DAUBEAPQUAN7(1) DAUER_6_1
PUFGPTotal float (from forecast) PPUFF_GESMDEC3PUFFER
PUFFPFree float (from forecast) PPUFF_FREIDEC3PUFFER
EWSTAForecast date constraint on activity start PS_RESTACHAR1RESTRIKSTR
EWSTEForecast date constraint on activity finish PS_RESTECHAR1RESTRIKEND
EWSTDForecasted start date for the activity EWSTARTDDATS8DATUM
EWSTZForecast start time of the activity EWSTARTZTIMS6ATIME
EWENDForecast finish date EWENDEDDATS8DATUM
EWENZForecast finish time for the activity EWENDEZTIMS6ATIME
ISDDActual Start Date PSHLP_ACTUAL_START_DEDATS8DATUM
ISDZActual start: Execution/setup (time) ISDZTIMS6ATIME
ORIG_ACTUAL_STARTOriginal Actual Start Date PSHLP_ORIG_ACTUAL_START_DEDATS8DATUM
LAST_ACTUAL_STARTLast Actual Start Date PSHLP_LAST_ACTUAL_START_DEDATS8DATUM
IEDDActual Finish Date PSHLP_ACTUAL_FINISH_DEDATS8DATUM
IEDZActual finish: Execution (time) IEDZTIMS6ATIMEEZR
ORIG_ACTUAL_FINISHOriginal Actual Finish Date PSHLP_ORIG_ACTUAL_FINISH_DEDATS8DATUM
LAST_ACTUAL_FINISHLast Actual Finish Date PSHLP_LAST_ACTUAL_FINISH_DEDATS8DATUM
OBJNRObject number J_OBJNRCHAR22Assigned to domainJ_OBJNRONR
ACTIVEInd.: Authorization exists CN_AUTHCHAR1XFELD
DISPLAYInd.: Authorization exists CN_AUTHCHAR1XFELD

Key field Non-key field



How do I retrieve data from SAP structure PSHLP_ACTY_ALL_DATES_OVR_ST using ABAP code?

As PSHLP_ACTY_ALL_DATES_OVR_ST is a database structure and not a table it does not store any data in the SAP data dictionary. The ABAP SELECT statement is therefore not appropriate and can not be performed on PSHLP_ACTY_ALL_DATES_OVR_ST as there is no data to select.

How to access SAP table PSHLP_ACTY_ALL_DATES_OVR_ST

Within an ECC or HANA version of SAP you can also view further information about PSHLP_ACTY_ALL_DATES_OVR_ST and the data within it using relevant transactions such as

SE11 (ABAP Dictionary Maintenance)
SM30 (Maintain Table Data)
SE80 (Object Navigator)
SE16 (Data Browser).


Search for further information about these or an SAP related objects