SAP TABLES | Production Planning and Control | Production Orders(PP-SFC) SAP PP

PPSFC_OBJECT_AFVGD_P_S_PDF SAP Structure for operation AFVGD_P Structure








PPSFC_OBJECT_AFVGD_P_S_PDF is an SAP Structure so does not store data like a database table does but can be used to process "Structure for operation AFVGD_P" INFORMATION WITHIN SAP ABAP PROGRAMS. THIS IS DONE BY DECLARING ABAP INTERNAL TABLES, WORK AREAS OR DATABASE TABLES based on this Structure. These can then be used to store and process the required data appropriately.

i.e. DATA: wa_PPSFC_OBJECT_AFVGD_P_S_PDF TYPE PPSFC_OBJECT_AFVGD_P_S_PDF .

Below is the documentation avaialable and full details of the fields which make up this Structure. You can view further information via relevant transactions such as SE11 or SE80. Also check out the Comments section below to view or add related contributions and example screen shots.

Display/Maintenance via SM30: Yes but with Restrictions

Enhancement category i: Can be enhanced (character-type or numeric)
See here for more information about this and other SAP enhancement categories


Dictionary fields for SAP Structure PPSFC_OBJECT_AFVGD_P_S_PDF




Field
Component Type
Data Typelength (Decimals)Check tableDescriptionConversion Routine
.INCLUDEAFVGD_P Operation for use in print programs
.INCLUDEAFVGD Order: Dialog table for Table AFVG (order operation)
.INCLUDEAFVKI Include structure of the operation key
MANDTMANDTCLNT3 T000Client
AUFPLCO_AUFPLNUMC10 Routing number of operations in the order
APLZLCO_APLZLNUMC8 AFVCGeneral counter for order
.INCLUDEAFVGI General include structure of the operation data
PLNFLPLNFOLGECHAR6 SequenceALPHA
PLNKNPLNKNNUMC8 Number of the task list node
PLNALPLNALCHAR2 Group CounterALPHA
PLNTYPLNTYCHAR1 TCA01Task List Type
VINTVVINTVDEC3 Increment between referenced operations
PLNNRPLNNRCHAR8 Key for Task List GroupALPHA
ZAEHLCIM_COUNTNUMC8 Internal counter
VORNRVORNRCHAR4 Operation/Activity NumberNUMCV
STEUSSTEUSCHAR4 T430Control key
ARBIDCR_OBJIDNUMC8 CRIDObject ID of the resource
PDESTCR_PDESTCHAR4 TSP03Printer for shop papersSPDEV
WERKSWERKS_DCHAR4 T001WPlant
KTSCHKTSCHCHAR7 T435Standard text key
LTXA1LTXA1CHAR40 Operation short text
LTXA2LTXA2CHAR40 Second line of the description
TXTSPSPRASLANG1 T002Language KeyISOLA
VPLTYVPLNTYCHAR1 TCA01Type of the referenced task list
VPLNRVPLNNRCHAR8 Group of the referenced task listALPHA
VPLALVPLNALCHAR2 Group counter of the referenced task listALPHA
VPLFLVPLBFLCHAR6 Referenced sequence in routingALPHA
VGWTSVORGSCHLCHAR4 TC21Standard value key
LAR01LSTARCHAR6 CSLAActivity Type
LAR02LSTARCHAR6 CSLAActivity Type
LAR03LSTARCHAR6 CSLAActivity Type
LAR04LSTARCHAR6 CSLAActivity Type
LAR05LSTARCHAR6 CSLAActivity Type
LAR06LSTARCHAR6 CSLAActivity Type
ZERMADZERMACHAR5 T429Type of standard value calculation
ZGDATDZGDATCHAR4 Date when the standard value was calculatedGJAHR
ZCODEDZCODECHAR6 Reference number for standard value code
ZULNRDZULNRCHAR5 Basis for standard value calculation
LOANZLOHNANZDEC3 Number of Time Tickets
LOARTLOHNARTCHAR4 Wage Type

RSANZCR_RS_ANZNUMC3 Number of confirmation slips
QUALFQUALFCHAR2 T423Suitability
ANZMAANZMSDEC5(2) Number of employees
RFGRPRUEFAGRPCHAR10 T426Setup group category
RFSCHRUEFASCHLUCHAR10 T425Setup group key
RASCHRUEARSCHLUCHAR2 T428Setup Type Key
AUFAKAUSCHUFAKDEC5(3) Scrap factor
LOGRPLOHNGRPCHAR3 T421Wage group
UEMUSUEMUSKZCHAR1 Required overlapping
UEKANUEKANKZCHAR1 Optional overlapping
FLIESFLIESSKZCHAR1 Indicator: continuous flow production
SPMUSSPLITTUNGCHAR1 Required splitting
SPLIMSPLITTANZDEC3 Maximum number of splits
ABLIPKZABLIPKZCHAR1 Indicator: simultaneous teardown and wait
RSTRARSTRACHAR2 T499QReduction strategy per operation/activity
SUMNRSUMKNTNRNUMC8 Node number of the superior operation
SORTLSORTICHAR10 Sort Term for Non-Stock Info Records
LIFNRLIFNRCHAR10 LFA1Account Number of Vendor or CreditorALPHA
PREISPREISCURR11(2) Price
PEINHPEINHDEC5 Price Unit
SAKTOKSTARCHAR10 CSKACost ElementALPHA
WAERSWAERSCUKY5 TCURCCurrency Key
INFNRINFNRCHAR10 EINANumber of Purchasing Info RecordALPHA
ESOKZESOKZCHAR1 Purchasing info record category
EKORGEKORGCHAR4 T024EPurchasing Organization
EKGRPVG_EKGRPCHAR3 T024Purchasing group for external processing
KZLGFKZLGFCHAR1 Indicator: fixed lot external processing
KZWRTFKZWRTFCHAR1 Indicator: Fixed price for external processing
MATKLMATKLCHAR9 T023Material Group
DDEHNDAUDEHNCHAR1 Indicator: flexible duration
ANZZLANZKAPINT13 Number of capacities required
PRZNTAPROZENTINT13 Work percentage
MLSTNMILESTONECHAR5 T433Usage
PPRIOPRIORITAETCHAR2 Priority
BUKRSBUKRSCHAR4 T001Company Code
ANFKOANFKOCHAR10 CSKSRequesting cost centerALPHA
ANFKOKRSANFKOKRSCHAR4 TKA01Controlling area of the requesting cost center
INDETINDETCHAR1 Key for calculation
LARNTLSTARCHAR6 CSLAActivity Type
PRKSTPRKSTCURR11(2) Costs in the activity

APLFLPLNFOLGECHAR6 SequenceALPHA
RUECKCO_RUECKNUMC10 Completion confirmation number for the operation
RMZHLCO_RMZHLNUMC8 Confirmation counter
PROJNPS_PSP_ELENUMC8 PRPSWork breakdown structure element (WBS element)ABPSP
OBJNRJ_OBJNRCHAR22 ONR00Object number
SPANZSPLITTERMDEC3 Actual number of splits
BEDIDBEDIDNUMC12
*
ID of the capacity requirements record
BEDZLCIM_COUNTNUMC8 Internal counter
BANFNCO_BANFNCHAR10 Purchase requisition numberALPHA
BNFPOCO_BNFPONUMC5 EBANItem number of the purchase requisition in the order
LEK01CO_LEIKZCHAR1 Indicator: No remaining activity expected
LEK02CO_LEIKZCHAR1 Indicator: No remaining activity expected
LEK03CO_LEIKZCHAR1 Indicator: No remaining activity expected
LEK04CO_LEIKZCHAR1 Indicator: No remaining activity expected
LEK05CO_LEIKZCHAR1 Indicator: No remaining activity expected
LEK06CO_LEIKZCHAR1 Indicator: No remaining activity expected
SELKZCO_SELKZCHAR1 TCK08Selection indicator for costing line items
KALIDWFCIDCHAR2 TFACDFactory Calendar
FRSPFRSPCHAR1 Earliest possible activity / Latest possible activity
STDKNSTDKNNUMC8 Node of operation within reference operation set
ANLZUANLZUCHAR1 T357MSyst.Condition
ISTRUISTRUCHAR18 MARAAssemblyMATN1
ISTTYSTLTYCHAR1 BOM category
ISTNRSTNUMCHAR8 Bill of materialNUMCV
ISTKNSTLKNNUMC8 BOM item node number
ISTPOCIM_COUNTNUMC8 Internal counter
IUPOZUPOSZCHAR4 Subitem NumberNUMCV
EBORTEBORTCHAR20 Installation Point for Subitem
VERTLCR_VERTNCHAR8 TC29Distr.cap.reqmts (plant maint.,process order, network)
LEKNWLEKNWCHAR1 Indicator: No Remaining Work Expected
NPRIONW_PRIOCHAR1 TCN07Priority
PVZKNCO_APLZLNUMC8
*
General counter for order
PHFLGPHFLGCHAR1 Indicator: Phase
PHSEQPHSEQCHAR2 TC52Control Recipe Destination
KNOBJKNOBJNUMC18 Number of Object with Assigned Dependencies
ERFSICHTQERFSICHTCHAR2 Recording View
QPPKTABSQPPKTABSCHAR1 Flow Variants for Inspection Point Completion
OTYPEOTYPECHAR2 T778OObject Type
OBJEKTIDOBJEKTIDNUMC8 Object ID
QLKAPARQL_KAPARTCHAR3 TC26Capacity category
RSTUFRSTUFNUMC1 Reduction level which reduces operation lead time
NPTXTKYTXTKYCHAR12 Internal text number (12-character)
SUBSYSQEIFSUBSYSCHAR6
*
Subsystem Identifier for QM Subsystem Interface
PSPNRPS_SPS_ELENUMC8
*
Standard WBS elementKONPT
PACKNOPACKNONUMC10
*
Package number
TXJCDTXJCDCHAR15 TTXJTax Jurisdiction
SCOPESCOPE_CVCHAR2 Object ClassSCOPE
GSBERGSBERCHAR4 TGSBBusiness Area
PRCTRPRCTRCHAR10 CEPCProfit CenterALPHA
NO_DISPNO_DISP_PLUSCHAR1 Effective for Materials Planning
QKZPRZEITQKZPRZEITCHAR1 Interval = Time (Time-Related)
QKZZTMG1QKZZTMG1CHAR1 Quantity Confirmation for Each Partial Lot
QKZPRMENGQKZPRMENGCHAR1 Creation Cycle = Quantity (Quantity-Reference)
QKZPRFREIQKZPRFREICHAR1 Interval Without Reference to Time or Quantity
KZFEATQKZFEATCHAR1 Indicator Is Not Used Currently
QKZTLSBESTQKZTLSBESTCHAR1 Operation with Stock-Related Partial Lot Assignment
AENNRAENNRCHAR12 AENRChange NumberAENNR
CUOBJ_ARBCUOBJNUMC18 Configuration (internal object number)
EVGEWEV_WEIGHTDDEC8 Aggregation weight for POC (PS progress)
ARBIICR_OBJID_INUMC8 CRIDActual operating resources object identification
WERKIWERKS_ICHAR4 T001WActual plant
CY_SEQNRVCY_SEQNRVNUMC14 Sequence number operation
KAPT_PUFFRKAPT_PUFFRINT410 Operation floats after finite scheduling (in seconds)
EBELNEBELNCHAR10 EKKOPurchasing Document NumberALPHA
EBELPEBELPNUMC5 EKPOItem Number of Purchasing Document
WEMPFWEMPFCHAR12 Goods Recipient/Ship-To Party
ABLADABLADCHAR25 Unloading Point
CLASFCLASFCHAR1 Ind.: Take Activity Into Account for Project Summarization
FRUNVFRUNVCHAR1 Indicator: External procurement data incomplete
ZSCHLAUFZSCHLCHAR6 Overhead key
KALSMAUFKALSMCHAR6
*
Costing Sheet
SCHED_ENDSCEND_ACTCHAR1 Ind.: Purchase requisition at activity finish date
NETZKONTNETZKONTCHAR1 Indicator for the account assignment of a network(hdr/act.)
OWAEROWAERSCUKY5 TCURCObject currency for network activity
AFNAMAFNAMCHAR12 Name of Requisitioner/Requester
BEDNRBEDNRCHAR10 Requirement Tracking Number
KZFIXCN_KZFIXCHAR1 Indicator: Purchasing info record data are fixed
PERNRCO_PERNRNUMC8 Personnel number
FRDLBCO_FRDLBCHAR1 Indicator: Externally processed op. with subcontracting
QPARTQPARTCHAR8 TQ30Inspection Type
LOEKZAUFLOEKZCHAR1 Deletion flag
WKURSWKURSDEC9(5) Exchange RateEXCRT
PROD_ACTPROD_ACTCHAR1 Indicator: Activity is a production activity
FPLNRFPLNRCHAR10
*
Billing plan number / invoicing plan number
OBJTYPEOCM_OBJ_TYPECHAR1 Change indicator
CH_PROCOCM_CH_PROCCHAR1 Process that has lead to the change of an object
KLVARCK_KLVARCHAR4
*
Costing Variant
KALNRCK_KALNRNUMC12
*
Cost Estimate Number for Cost Est. w/o Qty Structure
FORDNSFORDNCHAR10
*
Framework OrderALPHA
FORDPFORDPNUMC5
*
Item of framework order
MAT_PRKSTMAT_PRKSTCURR11(2) Material planning in networks: primary costs
PRZ01CO_PRZNRCHAR12
*
Business ProcessALPHA
RFPNTCN_RFPNTCHAR20 TCNRFPReference point for BOM transfer
FUNC_AREAFKBERCHAR16 TFKBFunctional Area
TECHSTECHSCHAR12 Parameter Variant/Standard Variant
ADPSPADDCOMPARE_CORECHAR40
*
Reference Element PM/PS
RFIPPNTCN_RPIPCHAR20 TCNRPIPReference Point for Relationship Between iPPE and PS
MES_OPERIDCO_MES_INT_OPERIDCHAR48 Key of an Operation from an ME System
MES_STEPIDCO_MES_INT_STEPIDCHAR6 Key of a Step in a Routing (SAP ME)
/CUM/CUGUIDSYSUUID_XRAW16 /CUM/AFCUUUID in X form (binary)
/ISDFPS/OBJNRJ_OBJNRCHAR22
*
Object number
.APPENDACTIVITY_STATUS Activity Leading Status
AFVC_STATUSACTCMB_DELEINT13 ACTCMB_TABStatus Combination
.APPENDMILL_PP_OC Mill: Order Combination / ATRKZ
.INCLUDEMILL_OC_MERGE_ORDER Mill: Order Number for Combined Order in Operation
MILL_OC_AUFNR_MOMILL_OC_AUFNR_MOCHAR12
*
Number of Combined OrderALPHA
.APPENDWTYSC_AFVGI_AS Struttura Append WTYSC per struttura AFGVI
.INCLUDEWTYSC_S_WTY_INDICATOR Warranty Indicator
WTY_INDWTYSC_WTY_INDICATORCHAR1 Warranty indicator
.INCLUDEAFVVI Include structure of the operation quantities/dates/values
MEINHVORMEUNIT3 T006Unit of Measure for Activity/OperationCUNIT
UMRENCP_UMRENDEC5 Denominator for converting rtg and op units of measure
UMREZCP_UMREZDEC5 Numerator for converting task list and oper. un. of measure
BMSCHBMSCHQUAN13(3) Base Quantity
ZMERHDZMERHQUAN9(3) Break
ZEIERDZEIERUNIT3 T006Unit for the break timeCUNIT
VGE01VGWRTEHUNIT3 T006Unit of measure for the standard valueCUNIT
VGW01VGWRTQUAN9(3) Standard Value
VGE02VGWRTEHUNIT3 T006Unit of measure for the standard valueCUNIT
VGW02VGWRTQUAN9(3) Standard Value
VGE03VGWRTEHUNIT3 T006Unit of measure for the standard valueCUNIT
VGW03VGWRTQUAN9(3) Standard Value
VGE04VGWRTEHUNIT3 T006Unit of measure for the standard valueCUNIT
VGW04VGWRTQUAN9(3) Standard Value
VGE05VGWRTEHUNIT3 T006Unit of measure for the standard valueCUNIT
VGW05VGWRTQUAN9(3) Standard Value
VGE06VGWRTEHUNIT3 T006Unit of measure for the standard valueCUNIT
VGW06VGWRTQUAN9(3) Standard Value
ZEIMUDZEIMUUNIT3 T006Unit for the minimum overlap timeCUNIT
ZMINUDZMINUQUAN9(3) Minimum overlap time
MINWEMINWEIQUAN13(3) Minimum Send-Ahead Quantity
ZEIMBDZEIMBUNIT3 T006Unit for the minimum processing timeCUNIT
ZMINBDZMINBQUAN9(3) Minimum processing time
ZEILMDZEILMUNIT3 T006Unit for the maximum wait timeCUNIT
ZLMAXDZLMAXQUAN9(3) Maximum wait time
ZEILPDZEILPUNIT3 T006Unit for the required wait timeCUNIT
ZLPRODZLPROQUAN9(3) Minimum wait time
ZEIWNDZEIWNUNIT3 T006Unit for the standard queue timeCUNIT
ZWNORDZWNORQUAN9(3) Standard queue time
ZEIWMDZEIWMUNIT3 T006Unit for the minumum queue timeCUNIT
ZWMINDZWMINQUAN9(3) Minimum queue time
ZEITNDZEITNUNIT3 T006Unit for the standard move timeCUNIT
ZTNORDZTNORQUAN9(3) Standard move time
ZEITMDZEITMUNIT3 T006Unit for the minimum move timeCUNIT
ZTMINDZTMINQUAN9(3) Minimum move time
PLIFZPLIFZDEC3 Planned Delivery Time in Days
DAUNODAUNORQUAN5(1) Normal duration of the activity
DAUNEDAUNOREUNIT3 T006Normal duration/unitCUNIT
DAUMIDAUMINQUAN5(1) Minimum activity duration
DAUMEDAUMINEUNIT3 T006Unit for the minimum durationCUNIT
EINSAEINSCHRACHAR1 Constraint on the basic start date for the activity
EINSEEINSCHRECHAR1 Constraint on the finish date of the activity
ARBEIARBEITQUAN7(1) Work involved in the activity
ARBEHARBEITEUNIT3 T006Unit for workCUNIT
MGVRGMGVRGQUAN13(3) Operation Quantity
ASVRGASVRGQUAN13(3) Operation scrap
LMNGALMNGAQUAN13(3) Total Yield Confirmed
XMNGAXMNGAQUAN13(3) Total scrap quantity confirmed
GMNGAGMNGAQUAN13(3) Confirmed yield in order unit of measure
ISM01CO_RUMNGQUAN13(3) Previously confirmed activity
ISM02CO_RUMNGQUAN13(3) Previously confirmed activity
ISM03CO_RUMNGQUAN13(3) Previously confirmed activity
ISM04CO_RUMNGQUAN13(3) Previously confirmed activity
ISM05CO_RUMNGQUAN13(3) Previously confirmed activity
ISM06CO_RUMNGQUAN13(3) Previously confirmed activity
ISMNWCO_ISMNWQUAN13(3) Actual work
FSAVDFSAVDDATS8 Earliest scheduled start: Execution (date)
FSAVZFSAVZTIMS6 Earliest scheduled start: Execution (time)
FSSBDFSSBDDATS8 Earliest scheduled start: Processing (date)
FSSBZFSSBZTIMS6 Earliest scheduled start: Processing (time)
FSSADFSSADDATS8 Earliest scheduled start: Teardown (date)
FSSAZFSSAZTIMS6 Earliest scheduled start: Teardown (time)
FSEDDFSEDDDATS8 Earliest scheduled finish: Execution (date)
FSEDZFSEDZTIMS6 Earliest scheduled finish: Execution (time)
FSSLDFSSLDDATS8 Earliest scheduled start: Wait (date)
FSSLZFSSLZTIMS6 Earliest scheduled start: Wait (time)
FSELDFSELDDATS8 Earliest scheduled finish: Wait (date)
FSELZFSELZTIMS6 Earliest scheduled finish: Wait (time)
SSAVDSSAVDDATS8 Latest scheduled start: Execution (date)
SSAVZSSAVZTIMS6 Latest scheduled start: Execution (time)
SSSBDSSSBDDATS8 Latest scheduled start: Processing (date)
SSSBZSSSBZTIMS6 Latest scheduled start: Processing (time)
SSSADSSSADDATS8 Latest scheduled start: Teardown (date)
SSSAZSSSAZTIMS6 Latest scheduled start: Teardown (time)
SSEDDSSEDDDATS8 Latest scheduled finish: Execution (date)
SSEDZSSEDZTIMS6 Latest scheduled finish: Execution (time)
SSSLDSSSLDDATS8 Latest scheduled start: Wait time (date)
SSSLZSSSLZTIMS6 Latest scheduled start: Wait time
SSELDSSELDDATS8 Latest scheduled finish: Wait time (date)
SSELZSSELZTIMS6 Latest scheduled finish: Wait time
ISAVDISAVDDATS8 Actual operation start (date)
IEAVDIEAVDDATS8 Actual finish of operation (date)
ISDDISDDDATS8 Actual start: Execution (date)
ISDZISDZTIMS6 Actual start: Execution/setup (time)
IERDIERDDATS8 Actual finish: Setup (date)
IERZIERZTIMS6 Actual finish: Setup (time)
ISBDISBDDATS8 Actual start: Processing (date)
ISBZISBZTIMS6 Actual start: Processing (time)
IEBDIEBDDATS8 Actual finish: Processing (date)
IEBZIEBZTIMS6 Actual processing finish (time)
ISADISADDATS8 Actual start: Teardown (date)
ISAZISAZTIMS6 Actual start: Teardown (time)
IEDDIEDDDATS8 Actual finish: Execution (date)
IEDZIEDZTIMS6 Actual finish: Execution (time)
PEDDCO_PEDDDATS8 Forecast finish date of operation from confirmation
PEDZCO_PEDZTIMS6 Forecast finish time of operation from confirmation
PUFFRPUFFR_FREIDEC3 Free float
PUFGSPUFFR_GESMDEC3 Total float
NTANFVORGABESTDDATS8 Constraint for activity start (Basic)
NTANZVORGABESTZTIMS6 Constraint for activity start time (Basic)
NTENDVORGABEEND2DATS8 Constraint for Finish of Activity (Basic)
NTENZVORGABEENZTIMS6 Basic finish time of the activity
EWSTDEWSTARTDDATS8 Forecasted start date for the activity
EWSTZEWSTARTZTIMS6 Forecast start time of the activity
EWENDEWENDEDDATS8 Forecast finish date
EWENZEWENDEZTIMS6 Forecast finish time for the activity
EWDANEWDANQUAN5(1) Normal duration (from forecast) of activity
EWDNEEWDNEUNIT3 T006Unit for forecast normal durationCUNIT
EWDAMEWDAMQUAN5(1) Minimum duration (from forecast) for activity
EWDMEEWDMEUNIT3 T006Unit for forecast minimum durationCUNIT
EWSTEPS_RESTECHAR1 Forecast date constraint on activity finish
EWSTAPS_RESTACHAR1 Forecast date constraint on activity start
WARTZWARTEZEITFLTP16(16) Queue time used for scheduling
WRTZEWTRZEUNIT3 Unit of measure for queue timeCUNIT
RUESTRUESTFLTP16(16) Setup time
RSTZERSTZEUNIT3 Unit of measure for setup timeCUNIT
BEARZBEARZEITFLTP16(16) Processing time
BEAZEBEAZEUNIT3 Unit of measure for processing timeCUNIT
ABRUEABRUEFLTP16(16) Teardown
ARUZEARUZEUNIT3 Unit of measure for teardownCUNIT
LIEGZLIEGEZEITFLTP16(16) Wait time used for scheduling
LIGZELIGZEUNIT3 Unit of measure for wait timeCUNIT
TRANZTRANSZEITFLTP16(16) Move time used for scheduling
TRAZETRAZEUNIT3 Unit of measure for move timeCUNIT
ISERHISERHQUAN9(3) Confirmed break time
OFM01CO_SCHAETZQUAN9(3) Forecast value used to update the standard value
OFM02CO_SCHAETZQUAN9(3) Forecast value used to update the standard value
OFM03CO_SCHAETZQUAN9(3) Forecast value used to update the standard value
OFM04CO_SCHAETZQUAN9(3) Forecast value used to update the standard value
OFM05CO_SCHAETZQUAN9(3) Forecast value used to update the standard value
OFM06CO_SCHAETZQUAN9(3) Forecast value used to update the standard value
OFMNWOFMNWQUAN7(1) Forecasted work (actual + remaining)
BZOFFBCP_OBZOFFBCHAR2 TCA54Reference date for start of sub-operation
EHOFFBCP_OEHOFFBUNIT3 T006Unit for offset to startCUNIT
OFFSTBCP_OOFFSTBQUAN5 Offset to sub-operation start
OFFSTECP_OOFFSTEQUAN5 Offset to sub-operation finish
BZOFFECP_OBZOFFECHAR2 TCA54Reference date for finish of sub-operation
EHOFFECP_OEHOFFEUNIT3 T006Unit for offset to finishCUNIT
FPAVDFPAVDDATS8 Earliest scheduled start date (forecast)
FPAVZFPAVZTIMS6 Earliest scheduled start time (forecast)
FPEDDFPEDDDATS8 Earliest scheduled finish date (forecast)
FPEDZFPEDZTIMS6 Earliest scheduled finish time (forecast)
SPAVDSPAVDDATS8 Latest scheduled start date (forecast)
SPAVZSPAVZTIMS6 Latest scheduled start time (forecast)
SPEDDSPEDDDATS8 Latest scheduled finish date (forecast)
SPEDZSPEDZTIMS6 Latest scheduled finish time (forecast)
BEAZPBEAZEPUNIT3 Unit of processing time (Forecast)CUNIT
PUFGPPPUFF_GESMDEC3 Total float (from forecast)
PUFFPPPUFF_FREIDEC3 Free float (from forecast)
BEARPPBEARZEITFLTP16(16) Processing time (forecast)
EPANFEPANFDATS8 Dispatched start date for operation
EPANZEPANZTIMS6 Dispatched start time for operation
EPENDEPENDDATS8 Dispatched finish date
EPENZEPENZTIMS6 Dispatched finish time
PDAUPDAUQUAN5(1) Forecasted duration of activity from confirmation
PDAEPDAEUNIT3 T006Unit of the forecasted duration from the confirmationCUNIT
KNOTEKNOTECHAR10 TVKNTransportation Connection Points
VSTZWVSTZWCHAR4 TVTZDeadline function
VSTGAVSTGACHAR4 TVTGDeadline deviation reason
QRASTZEHTQRASTZEHTUNIT3
*
Time UnitCUNIT
QRASTZFAKQRASTZFAKDEC5(2) Time Factor
QRASTMENGQRASTMENGQUAN13(3) Quantity Between Two Inspections
QRASTEREHQRASTEREHUNIT3
*
Grid Unit of MeasureCUNIT
AUFKTAFAKTDEC3 Execution Factor
RMNGARMNGAQUAN13(3) Total confirmed rework quantity
ILE01CO_ISMNGEHUNIT3
*
Unit of measure for the activity to be confirmedCUNIT
ILE02CO_ISMNGEHUNIT3
*
Unit of measure for the activity to be confirmedCUNIT
ILE03CO_ISMNGEHUNIT3
*
Unit of measure for the activity to be confirmedCUNIT
ILE04CO_ISMNGEHUNIT3
*
Unit of measure for the activity to be confirmedCUNIT
ILE05CO_ISMNGEHUNIT3
*
Unit of measure for the activity to be confirmedCUNIT
ILE06CO_ISMNGEHUNIT3
*
Unit of measure for the activity to be confirmedCUNIT
RWFAKRWFAKDEC5(3) Rework factor (is not used yet)
IPRZ1CO_IPRZSQUAN13(3) Confirmed quantity/work for business process
IPRE1RU_IPRZEUNIT3
*
Unit of measurement for conf. quantity for business processCUNIT
IPRK1RU_IPRZKCHAR1 No remaining quantity expected for business process
TAKTLD_TAKTNUMC4 takt within a line segment
OPRZ1OPRZ1QUAN13(3) Remaining quantity for business process
OPRE1OPRE1UNIT3
*
Unit for remaining quantity of business processCUNIT
PSPM_INDICATORPSPM_INDICATORCHAR1 Indicates PMCS date influence activity scheduling
.INCLUDEAFVUI Include structure of the user fields of the operation
SLWIDSLWIDCHAR7 TCN00Key word ID for user-defined fields
USR00USRCHAR20CHAR20 User field with 20 characters
USR01USRCHAR20CHAR20 User field with 20 characters
USR02USRCHAR10CHAR10 User field with 10 characters
USR03USRCHAR10CHAR10 User field with 10 characters
USR04USRQUAN13QUAN13(3) User field for quantity (length 10.3)
USE04USRUNITUNIT3 T006User field: Unit for quantity fieldsCUNIT
USR05USRQUAN13QUAN13(3) User field for quantity (length 10.3)
USE05USRUNITUNIT3 T006User field: Unit for quantity fieldsCUNIT
USR06USRCURR13CURR13(3) User-defined field for values (length 10,3)
USE06USRCUKYCUKY5 TCURCUser field: Unit for value fields
USR07USRCURR13CURR13(3) User-defined field for values (length 10,3)
USE07USRCUKYCUKY5 TCURCUser field: Unit for value fields
USR08USRDATEDATS8 User field for date
USR09USRDATEDATS8 User field for date
USR10USRFLAGCHAR1 User-defined field: Indicator for reports
USR11USRFLAGCHAR1 User-defined field: Indicator for reports
.INCLUDEGJV_DATA_5 JV data: (GJV_DATA_2),jv_oco
.INCLUDEGJV_DATA_2 JV data: (vname,recid,etype),jv_otype,jv_jibcl,jv_jibsa
.INCLUDEGJV_DATA_0 General assignments of application objects
VNAMEJV_NAMECHAR6 T8JVJoint VentureALPHA
RECIDJV_RECINDCHAR2 T8JJRecovery IndicatorALPHA
ETYPEJV_ETYPECHAR3 T8JGEquity typeALPHA
JV_OTYPEJV_OTYPECHAR4 Joint Venture Object TypeALPHA
JV_JIBCLJV_JIBCLCHAR3 T8J6AJIB/JIBE Class
JV_JIBSAJV_JIBSACHAR5 T8J6CJIB/JIBE Subclass A
JV_OCOJV_OR_COCHAR1 JV original cost object
DUMMY_CI_AFVUCHAR1CHAR1 Single-Character Indicator
SPARAMETER1SPARAMETERCHAR4 Scheduling Parameters for External Scheduling
SPARAMETER2SPARAMETERCHAR4 Scheduling Parameters for External Scheduling
SPARAMETER3SPARAMETERCHAR4 Scheduling Parameters for External Scheduling
/MRSS/ID_PROFILE/MRSS/T_REQU_UPDCHAR1 Requirements Profile Was Changed Manually
/MRSS/PROF_KEY/MRSS/T_RSG_REQUIDCHAR10 Profile KeyALPHA
/MRSS/PROF_GUIDCHAR32CHAR32 Character field, length 32
/MRSS/ACT_TYPE/MRSS/T_ACTIVITY_TYPECHAR1 Process variant
/MRSS/ORDER_PROB/MRSS/T_ORDER_PROBCHAR3 Order probability in percentOPROB
/MRSS/INIT_DONE/MRSS/T_INIT_DONECHAR1 Internal initialization carried out once
/MRSS/DATACHANGE/MRSS/T_USCREENCTL_DATACHANGEDCHAR1 Data was changed in the controls on the user screen
/MRSS/DEM_COUNT/MRSS/T_DEM_COUNTNUMC4 Counter for Demands in Operation
/MRSS/SUPERV_CNT/MRSS/T_RAP_SUPERVISOR_COUNTCHAR2 Number of Site SupervisorsALPHA
/MRSS/RULE_ID/MRSS/T_RSG_TIME_RULE_IDCHAR25 Time Rule Id
/MRSS/SALES_ORGVKORGCHAR4
*
Sales Organization
/MRSS/REFF_RCNT/MRSS/T_REM_EFFORT_RES_COUNTNUMC3 Determination of Remaining Demand: No. of Resources
/MRSS/REFF_E_BEG/MRSS/T_TIMESTAMP_BEGINNUMC14 Time stamp: startTSTLC
/MRSS/REFF_E_END/MRSS/T_TIMESTAMP_ENDNUMC14 Time stamp: endTSTLC
/MRSS/REFF_L_BEG/MRSS/T_TIMESTAMP_BEGINNUMC14 Time stamp: startTSTLC
/MRSS/REFF_L_END/MRSS/T_TIMESTAMP_ENDNUMC14 Time stamp: endTSTLC
/MRSS/RELEVANT/MRSS/T_RELEVANT_FOR_MRSCHAR1 Operation Set as MRS-Relevant
/MRSS/TEAM_PLAN/MRSS/T_RSG_TEAM_PLANNINGCHAR1 Team Planning flag for Demand
/MRSS/SINGL_RES/MRSS/T_RSG_FORCE_SINGLE_RESCHAR1 Indicator for Forcing a Single Resource
/MRSS/TO_BEGDATDATSDATS8 Field of type DATS
/MRSS/TO_BEGTIMTIMSTIMS6 Field of type TIMS
/MRSS/TO_ENDDATDATSDATS8 Field of type DATS
/MRSS/TO_ENDTIMTIMSTIMS6 Field of type TIMS
/MRSS/TO_DURATCHAR10CHAR10 Character Field Length = 10
/MRSS/TO_DUNITMEINSUNIT3
*
Base Unit of MeasureCUNIT
/MRSS/TO_DISTANCHAR19CHAR19 19 Characters
/MRSS/TO_MANUAL/MRSS/T_RSG_BOOLEANCHAR1 Boolean Variable
/MRSS/FR_BEGDATDATSDATS8 Field of type DATS
/MRSS/FR_BEGTIMTIMSTIMS6 Field of type TIMS
/MRSS/FR_ENDDATDATSDATS8 Field of type DATS
/MRSS/FR_ENDTIMTIMSTIMS6 Field of type TIMS
/MRSS/FR_DURATCHAR10CHAR10 Character Field Length = 10
/MRSS/FR_DUNITMEINSUNIT3
*
Base Unit of MeasureCUNIT
/MRSS/FR_DISTANCHAR19CHAR19 19 Characters
/MRSS/FR_MANUAL/MRSS/T_RSG_BOOLEANCHAR1 Boolean Variable
.APPENDAFVUI_OLC AFVUI APPEND for Operation Account Assignment
ILART_OPILACHAR3
*
Maintenance activity type
.APPENDFERC_AFVUI Append structure for Regulatory Reporting
FERC_INDFE_INDCHAR4 FERC_C7Regulatory indicatorALPHA
.INCLUDECOOPRINF Order: Additional dialog fields for AFVGF
FLGATFOLGENARTCHAR1 TCA07Sequence category
APLFZPLIFZDEC3 Planned Delivery Time in Days
ARBPLARBPLCHAR8 Work center
LOSVGCX_LOSVGQUAN13(3) Operation quantity in order unit of measure
LOSMEMEINSUNIT3 T006Base Unit of MeasureCUNIT
FLG_KMPFLG_KMPCHAR1 Indicator: Components allocated
FLG_PRMFLG_PRMCHAR1 Indicator: Inspection Characteristics Assigned
FLG_FHMFLG_FHTCHAR1 Indicator: PRTs Assigned
FLG_EVPFLG_EVPCHAR1 Indicator: Trigger points allocated
FLG_PSTFLG_PSTCHAR1 Indicator: PS texts exist
UVORNUVORNCHAR4 SuboperationNUMCV
KOSTLKOSTLCHAR10
*
Cost CenterALPHA
KOKRSKOKRSCHAR4
*
Controlling Area
DAWARCO_DAUWARQUAN7(1) Queue time
DARUECO_DAURUEQUAN7(1) Setup time
DABEACO_DAUBEAQUAN7(1) Processing time
DAABRCO_DAUABRQUAN7(1) Teardown time
DALIECO_DAULIEQUAN7(1) Wait time
VSTTXTCO_STTXTCHAR40 System Status
FLG_UVOFLG_UVOCHAR1 Indicator: Suboperation exists
FLG_MSTFLG_MSTCHAR1 Indicator: Milestone
FLG_RCKFLG_RCKCHAR1 Indicator: Operation requires confirmation
FLG_OFFFLG_OFFCHAR1 Indicator: Open operation (not finally confirmed)
FLG_FREFLG_FRECHAR1 Indicator: Release operation
FLG_LOEFLG_LOECHAR1 Indicator: Operation is deleted
FLG_FRDFLG_FRDCHAR1 Indicator: Operation is processed externally
FLG_AWEFLG_AWECHAR1 Indicator: automatic goods receipt
VARTCIM_VARTCHAR1 Dummy
INDBTTABIX_DINT410 Field defined as in SY-TABIX
AUFNRDAUFNRCHAR12
*
Order NumberALPHA
DAPBECO_DAUBEAPQUAN7(1) Duration of processing time (forecast)
WEMNG_OPRWEMNGQUAN13(3) Quantity of Goods Received
WEMEH_OPRBSTMEUNIT3
*
Purchase Order Unit of MeasureCUNIT
DATRACO_DAUTRAQUAN7(1) Duration of move time
DADRFCO_DAUDRFQUAN7(1) Duration of execution time (setup + processing + teardown)
FSEVDFSEVDDATS8 Earliest finish of operation (date)
FSEVZFSEVZTIMS6 Earliest finish of operation (time)
SSEVDSSEVDDATS8 Latest finish date of operation
SSEVZSSEVZTIMS6 Latest operation finish (time)
BANFN_DELCO_BANFNCHAR10 Purchase requisition numberALPHA
BNFPO_DELCO_BNFPONUMC5
*
Item number of the purchase requisition in the order
KALTXKALTXCHAR20 Description of the factory calendar
FLG_PURSFLG_PURSCHAR1 Indicator: Purchase order exists
KONNRKONNRCHAR10 EKKONumber of Principal Purchase AgreementALPHA
KTPNRKTPNRNUMC5 EKPOItem Number of Principal Purchase Agreement
PVZNRPVZNRCHAR4 Superordinate OperationNUMCV
PVZINTABIX_DINT410 Field defined as in SY-TABIX
FLG_VABFLG_VABCHAR1 Indicator: Sub-network exists
QLSEARCHQL_SEARCHCHAR12 Search term for qualification requirements
QLSTEXTSTEXTCHAR40 Object Name
PSTXTARNPTXARTCHAR2
*
Type of PS text to be copied into the purchase requisition
PSTXTTITXTTICHAR20 PS text description
INDEXSUMNRTABIX_DINT410 Field defined as in SY-TABIX
ARBPIARBPL_ICHAR8 Actual work center
AUDISPAUDISP_PLUSCHAR1 Reservation Relevance/Generation of Purchase Requisition
FLIEFFLIEFCHAR10
*
Fixed VendorALPHA
TXCHGTXCHGCHAR1 Indicator: long text changed
COMP_RESOCM_COMP_RESCHAR1 OCM: Result of comparison of two order objects
ASKUMX_KUM_PERQUAN13(3) Cumulative Scrap Qty of Subsequent Reporting Pts (Cur. Per.)
PSTXCHGPSTXCHGCHAR1 Ind.: Changed PS text
FLG_DLFLG_DLCHAR1 Document links exist
FLG_CALCFLG_CALCCHAR1 Indicator: Order (network etc.) still to be calculated
SPLQSPLIT_QTYQUAN13(3) Split Quantity in Order Split
EQUNREQUNRCHAR18
*
Equipment NumberALPHA
TPLNRTPLNRCHAR30
*
Functional LocationTPLNR
IDENTOPRIDCHAR8 Operation ID
SERVCHGXFELDCHAR1 Checkbox
FLG_OBJCKKNOBJONCHAR1 KNOBJ Is Filled, Object Dependencies Exist
QMNUMQMNUMCHAR12
*
Notification NoALPHA
NPLDANPLDADATS8 Next planned date
EPROFILEMEPROFILECHAR2 External Procurement Profile
/CUM/INTCUNR/CUM/INTCUNRNUMC6 CU: Internal CU Number in a Work Order
.INCLUDEVSOPRINF Include activities for versions
VSNMRVSNMRCHAR12 Number or description of a version
.INCLUDEVSACTINF Version include for original key activity
ORGAUFPLCO_AUFPLNUMC10 Routing number of operations in the order
ORGAPLZLCO_APLZLNUMC8
*
General counter for order
INACTVSINACTCHAR1 Version inactive indicator
INDEX_ITABINDEX_ITABINT410 Line number of an entry in index table ITAB
FLG_PRFLG_PROBJCHAR1 Indicator: Object is to be printed (internal field)
COUNTERCOUNTER1INT13 Counter
TDLINETDLINECHAR132 Text Line


Key field
Non-key field