MQC_CAUFVD SAP (Material Quantity Calculation, Order Header) Structure details

Dictionary Type: Structure
Description: Material Quantity Calculation, Order Header




ABAP Code to SELECT data from MQC_CAUFVD
Related tables to MQC_CAUFVD
Access table MQC_CAUFVD




Structure field list including key, data, relationships and ABAP select examples

MQC_CAUFVD is a standard SAP Structure so does not store data like a database table does. It can be used to define the fields of other actual tables or to process "Material Quantity Calculation, Order Header" Information within sap ABAP programs.

This is done by declaring abap internal tables, work areas or database tables based on this Structure. These can then be used to store and process the required data appropriately.

i.e. DATA: wa_MQC_CAUFVD TYPE MQC_CAUFVD.

The MQC_CAUFVD table consists of various fields, each holding specific information or linking keys about Material Quantity Calculation, Order Header data available in SAP. These include MANDT (Client), AUFNR (Order Number), WERKS (Plant), DISPO (MRP controller for the order).. See below for full list along with technical details, documentation, text table, check tables, foreign key relationships, conversion routines, relevant tcodes and example ABAP select code etc. .

Delivery Class:
Display/Maintenance via tcode SM30: Display/Maintenance Allowed but with Restrictions
SAP enhancement categories: Can be enhanced (character-type or numeric)


SAP MQC_CAUFVD structure fields - Full list of fields found in SAP data dictionary

Field Description Data Element Data Type length (Dec) Check table Conversion Routine Domain Name MemoryID SHLP
MANDTClient MANDTCLNT3T000MANDT
AUFNROrder Number AUFNRCHAR12AUFKALPHAAUFNRANR
WERKSPlant WERKS_DCHAR4T001WWERKSWRKH_T001W_C
DISPOMRP controller for the order CO_DISPOCHAR3T024DDISPODGR
FEVORProduction Supervisor FEVORCHAR3T024FFEVORCFV
PVERWTask list usage PLN_VERWECHAR3T411PLN_VERWEH_T411
PLNBEZMaterial Number MATNRCHAR18MARAMATN1MATNRMATS_MAT1
PLNAWApplication of the task list PLNAWCHAR1TCA09PLNAW
PLNTYTask List Type PLNTYCHAR1TCA01PLNTYPTYH_TCA01
PLNNRKey for Task List Group PLNNRCHAR8ALPHAPLNNRPLNPLKS
PLNALGroup Counter PLNALCHAR2ALPHAALTNRPAL
PLAUFDate for routing transfer CO_PLAUFDATS8DATUM
PLGRPResponsible planner group/department VAGRPCHAR3T024AVAGRPH_T024A
PLSVBTo lot size LOSGRBISQUAN13(3) MENG13
PLSVNFrom Lot Size LOSGRVONQUAN13(3) MENG13
PLNMETask list unit of measure PLNMEUNIT3T006CUNITMEINS
PDATVValid-From Date DATUVDATS8DATUM
PAENRChange Number AENNRCHAR12AENRAENNRAENNRAEN
STLTYBOM category STLTYCHAR1STLTY
STLSTBOM status STLSTNUMC2T415SSTLST
STLNRBill of material STNUMCHAR8NUMCVSTNUMSTLNR
STLANBOM Usage STLANCHAR1T416STLANCSV
SDATVValid-From Date DATUVDATS8DATUM
SBMNGBase quantity BASMNQUAN13(3) MENG13
SBMEHBase Unit of Measure MEINSUNIT3T006CUNITMEINS
SAENRChange Number AENNRCHAR12AENRAENNRAENNRAEN
STLBEZMaterial Number MATNRCHAR18MARAMATN1MATNRMATS_MAT1
STLALAlternative BOM STALTCHAR2ALPHAALTNR
SLSVNFrom Lot Size LOSVNQUAN13(3) MENG13
SLSBSTo Lot Size LOSBSQUAN13(3) MENG13
AUFLDDate of BOM Explosion/Routing Transfer CO_AUFLDDATS8DATUM
AUFPLRouting number of operations in the order CO_AUFPLNUMC10AUFPL
RSNUMNumber of Reservation/Dependent Requirement RSNUMNUMC10RESBRSNUMRES
FTRMSScheduled release date CO_FTRMSDATS8DATUM
FTRMIActual release date CO_FTRMIDATS8DATUM
FTRMPPlanned release date CO_FTRMPDATS8DATUM
GLTRPBasic finish date CO_GLTRPDATS8DATUM
GSTRPBasic start date CO_GSTRPDATS8DATUM
GLTRSScheduled finish CO_GLTRSDATS8DATUM
GSTRSScheduled start CO_GSTRSDATS8DATUM
GSTRIActual start date CO_GSTRIDATS8DATUM
GLTRIActual finish date CO_GLTRIDATS8DATUM
GETRIConfirmed Order Finish Date CO_GETRIDATS8DATUM
GASMGTotal scrap quantity in the order GASMGQUAN13(3) MENG13
GAMNGTotal order quantity GAMNGQUAN13(3) MENG13
GMEINCommon unit of measure for all order items CO_GMEINUNIT3T006CUNITMEINS
TERKZScheduling type TERMKZCHAR1T482TERART
REDKZReduction indicator for scheduling REDKZCHAR1REDKZ
FHORIScheduling Margin Key for Floats FHORICHAR3T436AFHORI
APRIOOrder priority CO_APRIOCHAR1CHAR1
AUARTOrder Type AUFARTCHAR4T003OAUFARTAAT
AUTYPOrder category AUFTYPNUMC2AUFTYP
REFNRReference order number AUFREFNRCHAR12AUFKALPHAAUFNRANV
ERNAMEntered by AUFERFNAMCHAR12USNAM
ERDATCreated on AUFERFDATDATS8DATUM
AENAMLast changed by AUFAENAMCHAR12USNAM
AEDATChange date for Order Master AUFAEDATDATS8DATUM
KTEXTDescription AUFTEXTCHAR40TEXT40
LTEXTLong Text Exists AUFLTEXTCHAR1XFELD
BUKRSCompany Code BUKRSCHAR4T001BUKRSBUKC_T001
STATSStatus Profile J_STSMACHAR8TJ20J_STSMA
OBJNRObject number J_OBJNRCHAR22ONR00J_OBJNRONR
LOEKZDeletion flag AUFLOEKZCHAR1XFELD
GSBERBusiness Area GSBERCHAR4TGSBGSBERGSB
KOKRSControlling Area KOKRSCHAR4TKA01CACCDCAC
CCKEYCost collector key CCKEYCHAR23Assigned to domainCCKEY
ASTKZIdentifier for statistical order AUFSTKZCHAR1XFELD
WAERSOrder Currency AUFWAERSCUKY5TCURCWAERS
OBJIDObject ID CCOBJIDCHAR1CHAR1
PLGKZIdentifier for planning with line items PLGKZCHAR1XFELD
KAPPLApplication KAPPLCHAR2T681AKAPPLKAP
KALSMCosting Sheet AUFKALSMCHAR6T683KALSM
ZSCHLOverhead key AUFZSCHLCHAR6CHAR6
ABKRSProcessing group AUFABKRSNUMC2TKO08AKREISAKR
PROFIDNetwork profile PROFIDNZPLCHAR7TCN41PROFILIDPNW
UPTERIndicator: Change to Scheduled Dates CO_UPTERCHAR1CHAR1
BEDIDID of the capacity requirements record BEDIDNUMC12KBKOBEDID
LODIVLot size divisor LOSDIVQUAN13(3) MENG13
VORGZFloat before production (in days) VORGZNUMC3NUM3
SICHZFloat after production (in days) SICHZNUMC3NUM3
FREIZRelease period (in days) FREIZNUMC3NUM3
PRONRProject definition PS_PSP_PRONUMC8Assigned to domainKONPDPS_PSPNR
PSPELWork Breakdown Structure Element (WBS Element) PS_PSP_PNRNUMC8PRPSKONPRPS_POSNR
ZAEHLInternal counter CIM_COUNTNUMC8CIM_COUNT
MZAEHLInternal counter CIM_COUNTNUMC8CIM_COUNT
ZKRIZCounter for additional criteria DZKRIZNUMC7ZKRIZ
PRUEFLOSInspection Lot Number QPLOSNUMC12QALSQPLOSQLSQALS
PLARTBasis for scheduling PS_PLARTCHAR1PS_PLART
RGEKZIndicator: Backflush RGEKZCHAR1XFELD
KLVARPCosting variant for planned costs KALKVARPLNCHAR4TCK03KLVAR
KLVARICosting variant for actual costs KALKVARISTCHAR4TCK03KLVAR
ABGSLResults Analysis Key ABGR_SCHLCHAR6TKKAAABGR_SCHLACS
AWSLSVariance Key AWSLSCHAR6TKV01AWSLS
FLG_AOBIndicator: relationships FLG_AOBCHAR1FLAG
FLG_ARBEIIndicator: Default value work is relevant FLG_ARBEICHAR1FLAG
PRCTRProfit Center PRCTRCHAR10CEPCALPHAPRCTRPRCPRCTR_EMPTY
GLTPPFinish date (forecast) CO_GLTPPDATS8DATUM
GSTPPForecast start date CO_GSTPPDATS8DATUM
GLTPSScheduled forecast finish CO_GLTPSDATS8DATUM
GSTPSScheduled forecast start CO_GSTPSDATS8DATUM
FTRPSScheduled release date (forecast) CO_FTRPSDATS8DATUM
RDKZPReduction indicator for scheduling (forecast) REDKZPCHAR1REDKZ
TRKZPScheduling type (forecast) TERMKZPCHAR1T482TERART
RUECKCompletion confirmation number for the operation CO_RUECKNUMC10CO_RUECKRCK
RMZHLInternal counter CIM_COUNTNUMC8CIM_COUNT
KVEWEUsage of the condition table KVEWECHAR1T681VKVEWEKVW
IGMNGYield confirmed from order confirmation CO_IGMNGQUAN13(3) MENG13
RATIDID of the capacity requirements record BEDIDNUMC12KBKOBEDID
GROIDID of the capacity requirements record BEDIDNUMC12KBKOBEDID
CUOBJConfiguration (internal object number) CUOBJNUMC18CUOBJCUX
GLUZSScheduled finish time CO_GLUZSTIMS6UHRZT
GSUZSScheduled Start (Time) CO_GSUZSTIMS6ATIME
REVLVRevision Level REVLVCHAR2NUMCVREVLVRVS
RSHTYObject types of the CIM resource CR_OBJTYCHAR2CR_OBJTY
RSHIDObject ID of the resource CR_OBJIDNUMC8CRIDCR_OBJID
RSNTYObject types of the CIM resource CR_OBJTYCHAR2CR_OBJTY
RSNIDObject ID of the resource CR_OBJIDNUMC8CRIDCR_OBJID
NAUTERMIndicator: Do not schedule automatically CO_NAUTERMCHAR1KREUZ
NAUCOSTIndicator: Do not cost automatically CO_NAUCOSTCHAR1KREUZ
STUFELevel (in multi-level BOM explosions) HISTUDEC2DEC2
WEGXXPath (for multi-level BOM explosions) WEGXXDEC4DEC4
VWEGXPath (for multi-level BOM explosions) WEGXXDEC4DEC4
ARSNRNumber of Reservation/Dependent Requirement RSNUMNUMC10RESBRSNUMRES
ARSPSOrder Item Number CO_POSNRNUMC4CO_POSNR
MAUFNRNumber of superior order MAUFNRCHAR12AUFKALPHAAUFNRUAF
LKNOTLeft node in collective order CO_LKNOTCHAR12AUFKALPHAAUFNR
RKNOTRight node of a collective order CO_RKNOTCHAR12AUFKALPHAAUFNR
PRODNETIndicator: Order is part of collective order CO_PRODNETCHAR1KREUZ
IASMGScrap confirmed for order CO_IASMGQUAN13(3) MENG13
ABARBConfirmation: Degree of processing CO_ABARBNUMC3CO_ABARB
TXJCDTax Jurisdiction TXJCDCHAR15TTXJTXJCDTXJ
SCOPEObject Class SCOPE_CVCHAR2SCOPESCOPE_CVPCO
NO_DISPEffective for Materials Planning NO_DISP_PLUSCHAR1NO_DISP_PLUS
AUFNTNumber of superior network CO_TEILNETCHAR12Assigned to domainALPHAAUFNR
AUFPTRouting number of operations in the order CO_AUFPLNUMC10AUFPL
APLZTGeneral counter for order CO_APLZLNUMC8Assigned to domainCO_APLZL
CSPLITApportionment Structure CSPLITCHAR4MAKVCSPLIT
AENNRChange Number AENNRCHAR12AENRAENNRAENNRAEN
CY_SEQNRSeq. number order CY_SEQNRNUMC14CY_SEQNR
BREAKSIndicator: Scheduling allowing for breaks BREAKSCHAR1XFELD
VORGZ_TRMScheduled float before production in days VORGZ_TRMDEC6(3) PUFFER_TRM
SICHZ_TRMScheduled float after production in days SICHZ_TRMDEC6(3) PUFFER_TRM
TRMDTDate of the last scheduling TRMDTDATS8DATUM
GLUZPBasic finish (time) CO_GLUZPTIMS6UHRZT
GSUZPBasic start time CO_GSUZPTIMS6UHRZT
GSUZIActual start time CO_GSUZITIMS6UHRZT
GEUZIConfirmed order finish (time) CO_GEUZITIMS6UHRZT
GLUPPForecast finish (time) CO_GLUPPTIMS6UHRZT
GSUPPForecast start (time) CO_GSUPPTIMS6UHRZT
GLUPSScheduled forecast finish time CO_GLUPSTIMS6UHRZT
GSUPSScheduled start time (Forecast) CO_GSUPSTIMS6UHRZT
CHSCHSearch procedure for batch determination KALSMA_CHCHAR6T683KALSM
LEAD_AUFNRLeading order in current processing CO_LAUFNRCHAR12Assigned to domainALPHAAUFNR
PNETSTARTDOutline start of collective network (date) CO_PSTARTDDATS8DATUM
PNETSTARTTStart time of a collective order CO_PSTARTTTIMS6ATIME
PNETENDDOutline finish of collective order (date) CO_PENDDDATS8DATUM
PNETENDTOutline finish time CO_PENDTTIMS6ATIME
FLG_MLTPSOrder with multiple items CO_MLTPSCHAR1KREUZ
IDAT2Technical completion date AUFIDAT2DATS8DATUM
KDAUF_AUFKSales Order Number KDAUFCHAR10VBUKALPHAVBELNAUN
KDPOS_AUFKItem Number in Sales Order KDPOSNUMC6NUM06KPO
KBEDInd: do not create capacity requirements KBED_DCHAR1XFELD
SFCPFProduction Scheduling Profile CO_PRODPRFCHAR6TCO43CO_PRODPRF
KKALKRIndicator: Components will not be costed COMP_CALCCHAR1XFELD
KSTARSettlement cost element AUFKSTARCHAR10Assigned to domainALPHAKSTAR
USER4Estimated total costs of order AUFUSER4CURR11(2) AUFUSER4
RMNGATotal confirmed rework quantity RMNGAQUAN13(3) MENGV13
NOPCOSTDo not calculate planned costs for order CO_NOPCOSTCHAR1XFELD
KSTEMPFIndicator: Direct cost collector CO_KSTEMPFCHAR1CO_KSTEMPF
NETZKONTIndicator for the account assignment of a network(hdr/act.) NETZKONTCHAR1NETZKONT
PKOSACost collector for production process PROCNR PKOSA_DCHAR12Assigned to domainALPHAAUFNR
PROCNRProduction Process CKML_F_PROCNRNUMC12Assigned to domainCK_KALNRCKML_PROCNR
PROTYProcess Category (Procurement/Consumption) CKML_PROZESS_TYPCHAR4Assigned to domainCKML_PROZESS_TYP
RSORDRefurbishment order indicator (PM) RSORDCHAR1XFELD
ATRKZRequest ID ATRKZCHAR1ATRKZ
BEMOTAccounting Indicator BEMOTCHAR2TBMOTBEMOT
ADRNRAAddress number AD_ADDRNUMCHAR10Assigned to domainALPHAAD_ADDRNUMADR
COMP_RESOCM: Result of comparison of two order objects OCM_COMP_RESCHAR1OCM_COMP_RES
CH_PROCProcess that has lead to the change of an object OCM_CH_PROCCHAR1OCM_CH_PROC
ERFZEITTime created C_TIMETIMS6UZEIT
AEZEITChanged at CO_CHG_TIMETIMS6UZEIT
KAPVERSAVersion of Available Capacity KAPVERSANUMC2TC36KAPVERSION
COLORDPROCCollective order with/without automatic goods movement CO_COLORDPRCCHAR1CO_COLORDPRC
KZERBIndicator: Project summarization via master data charact. PS_KZERBCHAR1XFELD
IVPROInvestment measure profile IM_PROFILCHAR6TAPRFIM_PROFIL
SOWRKLocation plant AUFSOWRKCHAR4T001WWERKS
ABUKRRequesting company code IM_ABUKRSCHAR4T001BUKRSBUK
AKSTLRequesting cost center PS_AKSTLCHAR10CSKSALPHAKOSTLKOS
SIZECLScale of investment objects IM_SIZECLCHAR2TAIF5ALPHASIZECL
IZWEKReason for investment IZWEKCHAR2T087IIZWEK
UMWKZReason for environmental investment AM_UMWKZCHAR5T087KAM_UMWKZ
CONF_KEYIdentical object CC_CONF_KEYNUMC8CC_NUMC8
VSNMR_VSales document version number VSNMR_VCHAR12VSNMR
TERHWScheduling note from order scheduling TERHWCHAR1TERHW
ST_ARBIDObject ID OBJEKTIDNUMC8NUM08PON
COSTUPDCosts are updated CN_COSTUPDCHAR1XFELD
OBJTYPEChange indicator OCM_OBJ_TYPECHAR1OCM_OBJ_TYPE
KOSTVResponsible cost center AUFKOSTVCHAR10Assigned to domainALPHAKOSTL
FUNC_AREAFunctional Area FKBERCHAR16TFKBFKBERFBE
SPLSTATStatus of an order in a split hierarchy SPLIT_STATCHAR1SPLIT_STAT
MAX_GAMNGMaximum Value of Total Order Quantity After Distribution CO_MES_MAX_GAMNGQUAN13(3) MENG13
MES_ROUTINGIDKey of a Routing from an ME System CO_MES_INT_ROUTINGIDCHAR64CHAR64
RMANRSales and Distribution Document Number VBELNCHAR10Assigned to domainALPHAVBELNAUN
POSNR_RMAItem number of the SD document POSNRNUMC6Assigned to domainPOSNR
POSNV_RMAItem number of the SD document POSNRNUMC6Assigned to domainPOSNR
VNAMEJoint Venture JV_NAMECHAR6T8JVALPHAJV_NAMEJVV
RECIDRecovery Indicator JV_RECINDCHAR2T8JJALPHAJV_RECIND
ETYPEEquity type JV_ETYPECHAR3T8JGALPHAJV_ETYPE
OTYPEJoint Venture Object Type JV_OTYPECHAR4ALPHAJV_OTYPE
JV_JIBCLJIB/JIBE Class JV_JIBCLCHAR3T8J6AJV_JIBCLJIB
JV_JIBSAJIB/JIBE Subclass A JV_JIBSACHAR5T8J6CJV_JIBSAJBS
JV_OCOJV original cost object JV_OR_COCHAR1JV_OR_COB
DUMMY_CI_AUFKSingle-Character Indicator CHAR1CHAR1CHAR1
CALIDFactory Calendar WFCIDCHAR2TFACDWFCIDFCI
KALSNCalendar Selection for Order KALSNNUMC2KALSN
CFB_MAXLZMaximum Storage Period MAXLZDEC5DEC5
CFB_LZEIHUnit for maximum storage period LZEIHUNIT3T006CUNITMEINS
CFB_ADTDAYSAdditional Days CFB_ADTDAYSDEC4DECV4
CFB_DATOFMDate of Manufacture CFB_DATOFMDATS8DATUM
CFB_BBDPIBest-Before Date (BBD)/ Shelf Life Expiration Date (SLED) CFB_BBD_PPPIDATS8DATUM
.INCLU--AP 0
CPD_UPDATTime Stamp /CPD/PFP_TSTMPDEC15TSTLC/CPD/PFP_TSTMP
.INCLU--AP 0
/CUM/INDCUCU: Order is Used for Compatible Units /CUM/INDCUCHAR1FLAG
/CUM/CMNUMCU: Construction Measure Number /CUM/CMNUMCHAR12ALPHA/CUM/CMNUM/CUM/CMNUM/CUM/V_CMNUM_ALL
/CUM/AUESTCU: Automatic Copy of Estimated Costs /CUM/AUESTCHAR1FLAG
/CUM/INTCUNRCU: Internal CU Number in a Work Order /CUM/INTCUNRNUMC6NUMC6
/CUM/CUGUIDUUID in X form (binary) SYSUUID_XRAW16SYSUUID
/CUM/DESNUMCU: Design Number /CUM/DESNUMCHAR12Assigned to domainALPHA/CUM/DESNUM/CUM/DESNUM
/CUM/DESGUIDCU: GUID of Design Document /CUM/DESGUIDRAW16SYSUUID
/CUM/AUFPL_TMPRouting number of operations in the order CO_AUFPLNUMC10AUFPL
/CUM/IWERK_TLSELMaintenance Planning Plant IWERKCHAR4Assigned to domainWERKSIWK
.INCLU--AP 0
/MRSS/PL_STRU_IDResource planning nodes /MRSS/T_PLAN_STRUCT_IDNUMC8Assigned to domainCR_OBJID
/MRSS/PL_MAN_TYPAssignment to resource planner or contact person /MRSS/T_MANAGER_TYPECHAR1/MRSS/_MANAGER_TYPE
/MRSS/ORDER_PROBOrder probability in percent /MRSS/T_ORDER_PROBCHAR3OPROB/MRSS/_ORDER_PROB
/MRSS/ACT_TYPEProcess variant /MRSS/T_ACTIVITY_TYPECHAR1/MRSS/_ACTIVITY_TYPE
/MRSS/INIT_DONEInternal initialization carried out once /MRSS/T_INIT_DONECHAR1FLAG
/MRSS/DATACHANGEData was changed in the controls on the user screen /MRSS/T_USCREENCTL_DATACHANGEDCHAR1FLAG
/MRSS/SALES_ORGSales Organization VKORGCHAR4Assigned to domainVKORGVKOC_VKORG
/MRSS/NW_BOOKEDNetwork Set to 'Booked' /MRSS/T_NW_BOOKEDCHAR1FLAG
.INCLU--AP 0
AD01PROFNRDynamic Item Processor Profile AD01PROFNRCHAR8AD01C_PROFAD01PROFNRAD0DIP_PROFILE
.INCLU--AP 0
MILL_RATIOFactor for Quantity-Based Settlement MILL_RATIOINT410CDINT4
.INCLU--AP 0
MILL_OC_ZUSKZCombination Indicator MILL_OC_ZUSKZCHAR1MILL_OC_ZUSKZ
.INCLU--AP 0
CLAIM_CONTROLClaim creation control indicator WTYSC_CLAIM_CONTROLCHAR1WTYSCC_CLM_CONTWTYSC_CLAIM_CONTROL
UPDATE_NEEDEDClaim inconsistency with order indicator WTYSC_UPDATE_NEEDEDCHAR1WTYSC_UPDATE_NEEDED
UPDATE_CONTROLClaim update trigger point from service order WTYSC_UPDATE_CONTROLCHAR1WTYSCC_UPDT_CONTWTYSC_UPDATE_CONTROL
MATXTMaterial description CO_MATXTCHAR40TEXT40
KONTIAccount assignment CO_KONTICHAR1KREUZ
STTXTSystem Status CO_STTXTCHAR40CHAR40
ASTEXUser status active CO_ASTEXCHAR1KREUZ
TXTKZLong text exists CO_LTEXTCHAR1XFELD
STDNRNumber of standard networks to be copied PLNNR_REFCHAR8ALPHAPLNNRPLN
AVOUEBIndicator: Display operation overview AVOUEBCHAR1CHAR1
PRTRVIndicator: Project date definition PRTRVCHAR1XFELD
PROJNWork Breakdown Structure Element (WBS Element) PS_PSP_PNRNUMC8PRPSKONPRPS_POSNR
SLDTVFrom selection date CO_SDATVDATS8DATUM
SLDTBTo selection date CO_SDATBDATS8DATUM
FLG_TERMIndicator: Scheduling must take data changes into account FLG_TERMCHAR1XFELD
FLG_TERDIAIndicator: Refill dialog table for scheduling FLG_TERDIACHAR1CHAR1
FLG_DIRECTIndicator: Direct function call FLG_DIRECTCHAR1CHAR1
FLG_TRMVIndicator: Operation changes relevant to scheduling FLG_TRMVCHAR1KREUZ
FLG_TRMEIndicator: Scheduling is carried out at least once FLG_TRMECHAR1KREUZ
GWEMGDelivered quantity CO_GWEMGQUAN13(3) MENG13
GIAMGExpected variance from planned qty to be delivered to stock CO_GIAMGQUAN13(3) MENG13
MIMEZExpected yield variance CO_MIMEZQUAN13(3) MENGV13
APROZScrap percentage CO_APROZDEC5(2) DEC3_2
IAPRZScrap percentage CO_APROZDEC5(2) DEC3_2
VERANPerson/Group responsible for the network VANTWCHAR3T024DDISPO
NWARTType of network NWARTCHAR4T003OAUFART
POSNROrder Item Number CO_POSNRNUMC4CO_POSNR
REDKZ_TXDescription of reduction indicator REDKZ_TXCHAR40TEXT40
TERKZ_TXDescription of scheduling type TERMKZ_TXTCHAR30TEXT30
TRKZP_TXDescription of scheduling type TERMKZ_TXTCHAR30TEXT30
PLART_TXDescription of the basis for scheduling PLART_TXCHAR40TEXT40
TMBASSet of dates for network PS_TERMBASCHAR1PS_PLART
TMBAS_TXDescription of the planning type TMBAS_TXCHAR40TEXT40
MATNRMaterial Number for Order CO_MATNRCHAR18MARAMATN1MATNRMAT
FLG_PRINTIndicator: Order still to be printed (internal field) FLG_PRINTCHAR1KREUZ
ARTTEXTText, 40 Characters Long TEXT40CHAR40TEXT40
ASTTXField displaying user status CO_ASTTXCHAR40CHAR40
KORRKOrder conversion with the possibility of making corrections CO_KORRKCHAR1XFELD
FREIKZIndicator: Release order immediately CO_FREIKZCHAR1XFELDAEF
PLAFKZIndicator: Convert planned order with RSNUM CO_PLAFKZCHAR1CHAR1
UMSKZIndicator: Collective conversion of planned orders CO_UMSKZCHAR1CHAR1
BMEINSBase Unit of Measure MEINSUNIT3T006CUNITMEINS
BMENGEBase quantity BASMNQUAN13(3) MENG13
BAUMNGBase quantity BASMNQUAN13(3) MENG13
FLG_CALCIndicator: Order (network etc.) still to be calculated FLG_CALCCHAR1KREUZ
LOSGRLot Size for Product Costing CK_LOSGRQUAN13(3) MENG13
TYPKZCategory of object causing the load (order category) TYPKZCHAR1TYPKZ
CREA_APLApplication code, where the order/network was created CREA_APLCHAR1CHAR1
INDBTField defined as in SY-TABIX TABIX_DINT410TABIX
O_SALDOOrder balance in order currency O_SALDOCURR15(2) WERTV8
K_SALDOOrder balance in controlling-area currency K_SALDOCURR15(2) WERTV8
M_BAUGRSuperior assembly CO_MBAUGRCHAR18MARAMATN1MATNR
FLG_RUCKInd: Confirmation to be saved FLG_RUCKCHAR1XFELD
FLG_SERVInd: Services must be updated FLG_SERVCHAR1XFELD
PSPNRStandard WBS element PS_SPS_ELENUMC8Assigned to domainKONPTPS_SPSNR
FLG_LVSIndicator: WM relevant change made FLG_LVSCHAR1KREUZ
FLG_ADDRInd: Address update must be called up FLG_ADDRCHAR1XFELD
FLG_LFINFInd.: Book delivery information FLG_LFINFCHAR1XFELD
AUCOSTIndicator: Cost automatically CO_AUCOSTCHAR1KREUZ
AUTERMIndicator: Schedule automatically CO_AUTERMCHAR1KREUZ
FLG_FREIIndicator: Order is (partially) released CO_TM_FREICHAR1CHAR1
FLG_TABGIndicator: Order is technically completed CO_TM_TABGCHAR1CHAR1
FLG_PARENTIndicator: Order has dependent orders FLG_PARENTCHAR1KREUZ
NSTART_TRMScheduled start date of collective order (date) NSTART_TRMDATS8DATUM
NSTT_TRMScheduled start collective order (time) NSTT_TRMTIMS6UHRZT
NEND_TRMScheduled finish date of collective order (date) NEND_TRMDATS8DATUM
NENT_TRMScheduled finish collective order (time) NENT_TRMTIMS6UHRZT
NSTART_ISTActual start collective order (date) NSTART_ISTDATS8DATUM
NSTT_ISTActual start collective order (time) NSTT_ISTTIMS6UHRZT
NEND_ISTActual finish for collective order (date) NEND_ISTDATS8DATUM
NENT_ISTActual finish collective order (time) NENT_ISTTIMS6UHRZT
AUKBEDIndicator: Calculate capacity requirements AUKBEDCHAR1XFELD
AUDISPReservation Relevance/Generation of Purchase Requisition AUDISP_PLUSCHAR1AUDISP
CONV_FEHLCheckbox XFELDCHAR1XFELD
PKNUMControl cycle number PKNUMCHAR7PKHDALPHAPKNUMPKNUM
PKPOSKanban item number / control cycle item PKPOSNUMC3PKPOS
FEHLCheckbox XFELDCHAR1XFELD
PRREGChecking Rule for Availability Check PRREGCHAR2T441RPRREGPRR
FLG_CRPROJGeneral Flag FLAGCHAR1FLAG
MA_UNBWGeneral Flag FLAGCHAR1FLAG
KZAVCIndicator for type of availability check KZAVCCHAR1KZAVC
PRMBDCheck with requirements CO_PRMBDCHAR1CHAR1
VBELNSales order number CO_KDAUFCHAR10Assigned to domainALPHAVBELNAUN
VBELPSales order item CO_KDPOSNUMC6Assigned to domainPOSNRAUP
KONSISelection: Consignment stock CO_KONSICHAR1CHAR1
LEIHGSelection: Returnable packaging CO_LEIHGCHAR1CHAR1
FLG_IMMOChange indicator AEKNZCHAR1FLAG
FLG_HHMChange indicator AEKNZCHAR1FLAG
FLG_AIPPChange indicator AEKNZCHAR1FLAG
FLG_ASSChange indicator AEKNZCHAR1FLAG
FLG_AIBChange indicator AEKNZCHAR1FLAG
FLG_AFASChange indicator AEKNZCHAR1FLAG
FLG_PMSDChange indicator AEKNZCHAR1FLAG
FLGSERSerial Number with Incomplete Equipment FLGSERCHAR1XFELD
AUFKTExecution Factor AFAKTDEC3AFAKT
LINELine hierarchy LD_LINECHAR8ARBPLLDH
TXCHGIndicator: long text changed TXCHGCHAR1XFELD
FLG_COMMUNICATIONChange indicator AEKNZCHAR1FLAG
ACT_CHANGEDCheckbox XFELDCHAR1XFELD
FLG_MDFAUF: Reading of master data executed CO_FLGMDNUMC1COFLGMD
MDSTPUTC Time Stamp in Long Form (YYYYMMDDhhmmssmmmuuun) TIMESTAMPLDEC21(7) TZNTSTMPL
NPLDANext planned date NPLDADATS8DATUM
ARTPRPriority Type ARTPRCHAR2T356AARTPR
PRIOKPriority PRIOKCHAR1T356PRIOKPRIOK
EQUNREquipment Number EQUNRCHAR18EQUIALPHAEQUNREQNEQUI
BAUTLAssembly BAUTLCHAR18MARAMATN1MATNRMAT
ILOANLocation and account assignment for technical object ILOANCHAR12ILOAILOAN
ILOAIILOA Individual ILOAICHAR1X
ANLZUSyst.Condition ANLZUCHAR1T357MANLZU
IWERKMaintenance Planning Plant IWERKCHAR4T399IWERKSIWK
INGPRPlanner Group for Customer Service and Plant Maintenance INGRPCHAR3T024IINGRPIHG
APGRPResponsible planner group/department VAGRPCHAR3T024AVAGRPH_T024A
PM_OBJTYObject Type of CIM Resources for Work Center PM_OBJTYCHAR2CR_OBJTY
GEWRKObject ID of the Work Center LGWIDNUMC8CRIDCR_OBJID
KUNUMCustomer Number KUNUMCHAR10KNA1ALPHAKUNNRKUN
ANINGName of Person Reponsible for System ANINGCHAR12USNAM
GAUZTPlanned downtime in hours GAUZTFLTP16(16) FLTP
GAUEHUnit for Breakdown Duration MAUEHUNIT3T006CUNITMEINS
ANLBDDate until which the system is available ANLBDDATS8DATUM
ANLVDDate from which the system is available ANLVDDATS8DATUM
ANLBZTime until which the system is available ANLBZTIMS6UHRZT
ANLVZTime from Which System is Available ANLVZTIMS6UHRZT
INSPKName of Person Responsible for Technical Inspection INSPKCHAR12USNAM
DATANDate of Technical Inspection DATANDATS8DATUM
WARPLMaintenance Plan WARPLCHAR12MPLAALPHAWARPLMPLMPLAL
ABNUMMaintenance Plan Call Number ABNUMINT410ABNUM
WAPOSMaintenance item WAPOSCHAR16ALPHAPOSNUMPSMPOSL
LAUFNOrder number LAUFNCHAR12AUFKALPHAAUFNRANR
OBKNRObject list number OBJKNRINT410Assigned to domainOBJKN
REVNRRevision for Plant Maintenance and Customer Service REVNICHAR8T352RREVNI
ADDATPM Order: Reference Date ADDATDATS8DATUM
ADUHRTime of Reference Date ADUHRTIMS6UZEIT
IPHASMaintenance Processing Phase PM_PHASECHAR1PM_PHASE
ILARTMaintenance activity type ILACHAR3T353IILARTH_T350I
QMNUMNotification No QMNUMCHAR12QMELALPHAQMNUMIQM
HISDAPM request: History date HISDADATS8DATUM
AKKNZOrder Category Indicator Plant Maintenance AKKNZCHAR1AKKNZ
PLKNZMaintenance order planning indicator AUF_PLKNZCHAR1AUF_PLKNZ
SERIALNRSerial Number GERNRCHAR18GERNRGERNRSER
SERMATMaterial Number MATNRCHAR18Assigned to domainMATN1MATNRMATS_MAT1
DEVICEIDAdditional Device Data DEVICEIDCHAR40DEVICEID
SCREENTYScenario or Subscreen Category SCRTPCHAR4Assigned to domainSCRTP
ADPSPReference Element PM/PS ADDCOMPARE_CORECHAR40Assigned to domainADDCOMPARE_COREADCP
RSUPGUpgrade Order Indicator RSUPGCHAR1XFIELD
VAWRKPlant associated with main work center WERGWCHAR4T001WWERKS
VAPLZMain work center for maintenance tasks GEWRKCHAR8ARBPLVAP
VATXTShort text for the work center AP_KTEXTCHAR40TEXT40
INNAMName of the Maintenance Planner Group INNAMCHAR18TEXT18
OL_AEKNZChange indicator AEKNZCHAR1FLAG
PMCO_AEKNZChange indicator AEKNZCHAR1FLAG
SP_AEKNZChange indicator AEKNZCHAR1FLAG
PRINT_FLAGIndicator: Order Printing Requested PM_PRT_FLGCHAR1X
ABRUF_FLAGFlag: Maintenance plan call PM_ABR_FLGCHAR1X
WO_FLAGIndicator: Order Creation from PM Notification PM_WO_FLGCHAR1X
PLVARPlan Version PLVARCHAR2T778PPLVARPOP
WCM_VBKZChange indicator AEKNZCHAR1FLAG
.INCLU--AP 0
/ISDFPS/OBJNRObject number J_OBJNRCHAR22Assigned to domainJ_OBJNRONR
/ISDFPS/MEQUIMaster Equipment /ISDFPS/MEQUICHAR18Assigned to domainALPHAEQUNR
.INCLU--AP 0
ORCODPM/CS Order Code Indicating Rotable Process ADPM_ORDERCODECHAR1ADPMPRIOHDADPM_ORDERCODE
PRMANCMC: Priority Manually Changed ADPM_PRMANCHAR1CHAR1
PRVALPriority for PM/CS Orders ADPM_RTPRIONUMC2DOKU_SEQN2
TWTDECMC: Use Minimum or Standard TWT from PP Matrix ADPM_TWTFLAGCHAR1CHAR1
MSTCKSingle-Character Indicator CHAR1CHAR1CHAR1
.INCLU--AP 0
UIIUnique Item Identifier UII_CHAR72CHAR72UII_CHAR72UIIH_UII
TPLNRFunctional Location TPLNRCHAR30IFLOTTPLNRTPLNRIFLIFLM
ABCKZABC indicator for technical object ABCKZCHAR1T370CABCKZ
EQFNRSort field EQFNRCHAR30CHAR30
SWERKMaintenance plant SWERKCHAR4T001WWERKSSWK
STORTAsset location STORTCHAR10T499SAP_STAND
MSGRPRoom RAUMNRCHAR8CHAR8
BEBERPlant section BEBERCHAR3T357BEBERBBE
CR_OBJTYObject types of the CIM resource CR_OBJTYCHAR2CR_OBJTY
PPSIDObject ID of PP work center PPSIDNUMC8CRIDCR_OBJID
PROIDWork Breakdown Structure Element (WBS Element) PS_PSP_PNRNUMC8PRPSKONPRPS_POSNR
DAUFNStanding order number DAUFNCHAR12AUFKALPHAAUFNRORDP
KOSTLCost Center KOSTLCHAR10CSKSALPHAKOSTLKOS
ANLNRMain Asset Number ANLN1CHAR12ANLHALPHAANLN1AN1
ANLUNAsset Subnumber ANLN2CHAR4ANLAALPHAANLN2AN2
IAUFNROrder Number AUFNRCHAR12AUFKALPHAAUFNRANR
IKOKRSControlling Area KOKRSCHAR4TKA01CACCDCAC
IBUKRSCompany Code BUKRSCHAR4T001BUKRSBUKC_T001
IGSBERBusiness Area GSBERCHAR4TGSBGSBERGSB
VKORGSales Organization VKORGCHAR4TVKOVKORGVKOC_VKORG
VTWEGDistribution Channel VTWEGCHAR2TVTWVTWEGVTWC_VTWEG
SPARTDivision SPARTCHAR2TSPASPARTSPAC_SPART
ADRNRAddresses: Address Number CADNRCHAR10Assigned to domainALPHACADRNR
OWNERObject reference indicator ILOM_OWNERCHAR1ILOM_OWNER
CREATEInd.: Authorization exists CN_AUTHCHAR1XFELD
CHANGEInd.: Authorization exists CN_AUTHCHAR1XFELD
DISPLAYInd.: Authorization exists CN_AUTHCHAR1XFELD
PSTEXTInd.: Authorization exists CN_AUTHCHAR1XFELD
MATERIALInd.: Authorization exists CN_AUTHCHAR1XFELD
PRTInd.: Authorization exists CN_AUTHCHAR1XFELD
ACTELEMInd.: Authorization exists CN_AUTHCHAR1XFELD
VSNMRNumber or description of a version VSNMRCHAR12VSNMRVS2
ORGKEYOrder Number AUFNRCHAR12Assigned to domainALPHAAUFNRANR
EXT_AUFNROrder Number AUFNRCHAR12Assigned to domainALPHAAUFNRANR
INACTVersion inactive indicator VSINACTCHAR1XFELD
MATSVService product MATSVCHAR18Assigned to domainMATN1MATNRMATMAT1
VORAB_SMAdvance Shipment Indicator VORAB_SMCHAR1VORAB_SM
MNGSPService product quantity MNGSPQUAN13(3) MENG13
MEHSPBase Unit of Measure MEINSUNIT3Assigned to domainCUNITMEINS
.INCLU--AP 0
MPN_SETKZSelection of all components in interchangeable parts' group MPNKZCHAR1XFELD
MPN_FFFKZ Selection of Whole FFF Class0
MPN_INDKZ Individual Material Display0
CHARGBatch Number CHARG_DCHAR10Assigned to domainCHARGCHA

Key field Non-key field



How do I retrieve data from SAP structure MQC_CAUFVD using ABAP code?

As MQC_CAUFVD is a database structure and not a table it does not store any data in the SAP data dictionary. The ABAP SELECT statement is therefore not appropriate and can not be performed on MQC_CAUFVD as there is no data to select.

How to access SAP table MQC_CAUFVD

Within an ECC or HANA version of SAP you can also view further information about MQC_CAUFVD and the data within it using relevant transactions such as

SE11 (ABAP Dictionary Maintenance)
SM30 (Maintain Table Data)
SE80 (Object Navigator)
SE16 (Data Browser).


Search for further information about these or an SAP related objects



Comments on this SAP object

What made you want to lookup this SAP object? Please tell us what you were looking for and anything you would like to be included on this page!