EVOPD_WBS SAP (Progress and Milestone: WBS and Activities) Structure details

Dictionary Type: Structure
Description: Progress and Milestone: WBS and Activities




ABAP Code to SELECT data from EVOPD_WBS
Related tables to EVOPD_WBS
Access table EVOPD_WBS




Structure field list including key, data, relationships and ABAP select examples

EVOPD_WBS is a standard SAP Structure so does not store data like a database table does. It can be used to define the fields of other actual tables or to process "Progress and Milestone: WBS and Activities" Information within sap ABAP programs.

This is done by declaring abap internal tables, work areas or database tables based on this Structure. These can then be used to store and process the required data appropriately.

i.e. DATA: wa_EVOPD_WBS TYPE EVOPD_WBS.

The EVOPD_WBS table consists of various fields, each holding specific information or linking keys about Progress and Milestone: WBS and Activities data available in SAP. These include T_EVOPD (), S_PRTE (), MANDT (Client), POSNR (WBS Element).. See below for full list along with technical details, documentation, text table, check tables, foreign key relationships, conversion routines, relevant tcodes and example ABAP select code etc. .

Delivery Class:
Display/Maintenance via tcode SM30: Display/Maintenance Allowed but with Restrictions
SAP enhancement categories: Can Be Enhanced (Deep)


SAP EVOPD_WBS structure fields - Full list of fields found in SAP data dictionary

Field Description Data Element Data Type length (Dec) Check table Conversion Routine Domain Name MemoryID SHLP
OBJNRObject number J_OBJNRCHAR22Assigned to domainJ_OBJNRONR
T_EVOPD 0
S_PRTE 0
MANDTClient MANDTCLNT3MANDT
POSNRWBS Element PS_POSNRNUMC8ABPSPPS_POSNR
PSPHICurrent number of the appropriate project PS_PSPHINUMC8KONPDPS_PSPNR
PSTRTWBS element: Basic start date PS_PSTRTDATS8DATUM
ESTRTForecasted start date of the WBS element PS_ESTRTDATS8DATUM
ISTRTActual start date for the WBS element PS_ISTRTDATS8DATUM
PENDEWBS element: Basic finish date PS_PENDEDATS8DATUM
EENDEForecasted finish date of the WBS element PS_EENDEDATS8DATUM
IENDEActual finish date of the WBS element PS_IENDEDATS8DATUM
PDAURLength (duration) of the basic dates in the WBS element PS_PDAURQUAN5(1) DAUER_4_1
EDAURForecasted length (duration) of the WBS element PS_EDAURQUAN5(1) DAUER_4_1
IDAURActual length (duration) of the WBS element PS_IDAURQUAN5(1) DAUER_4_1
IEINHUnit for duration of actual WBS element dates PS_IEINHUNIT3CUNITEINHEIT
EEINHUnit for duration of WBS element planned dates PS_EEINHUNIT3CUNITEINHEIT
PEINHUnit for duration of basic WBS element dates PS_PEINHUNIT3CUNITEINHEIT
FLGVGIndicator: There are activities for the WBS elements PS_FLGVGCHAR1X
FLGEWIndicator: Expected dates from the activities PS_FLGEWCHAR1X
FLGEMIndicator: Forecast dates set manually PS_FLGEMCHAR1X
FLGVMIndicator: Basic dates set manually PS_FLGVMCHAR1X
FLGIMIndicator: Actual dates set manually PS_FLGIMCHAR1X
FLGVIIndicator: Actual dates from the activities PS_FLGVICHAR1X
PSTRMEarliest scheduled start date (Basic) PS_GSTRSDATS8DATUM
PETRMLatest scheduled finish date (basic) PS_GLTRSDATS8DATUM
ESTRMScheduled start date (Forecast) PS_GSTPPDATS8DATUM
EETRMLatest scheduled finish date (Forecast) PS_GLTPPDATS8DATUM
VISTRTentative actual start date for WBS element PS_ISTVORLDATS8DATUM
VIENDTentative actual finish date for WBS element PS_IENVORLDATS8DATUM
PSTRSLatest scheduled start date (basic) PS_GSTREDATS8DATUM
PETRFEarliest scheduled finish date (basic) PS_GETREDATS8DATUM
ESTRSLatest scheduled start date (forecast) PS_GSTRPDATS8DATUM
EETRFEarliest scheduled finish date (forecast) PS_GLTRPDATS8DATUM
S_AFVGD 0
MANDTClient MANDTCLNT3MANDT
AUFPLRouting number of operations in the order CO_AUFPLNUMC10AUFPL
APLZLGeneral counter for order CO_APLZLNUMC8CO_APLZL
PLNFLSequence PLNFOLGECHAR6ALPHAPLNFOLGE
PLNKNNumber of the task list node PLNKNNUMC8KNTNR
PLNALGroup Counter PLNALCHAR2ALPHAALTNRPAL
PLNTYTask List Type PLNTYCHAR1PLNTYPTYH_TCA01
VINTVIncrement between referenced operations VINTVDEC3VINTV
PLNNRKey for Task List Group PLNNRCHAR8ALPHAPLNNRPLNPLKS
ZAEHLInternal counter CIM_COUNTNUMC8CIM_COUNT
VORNROperation/Activity Number VORNRCHAR4NUMCVVORNRVGN
STEUSControl key STEUSCHAR4STEUS
ARBIDObject ID of the resource CR_OBJIDNUMC8CR_OBJID
PDESTPrinter for shop papers CR_PDESTCHAR4SPDEVRSPOPNAME
WERKSPlant WERKS_DCHAR4WERKSWRKH_T001W_C
KTSCHStandard text key KTSCHCHAR7KTSCH
LTXA1Operation short text LTXA1CHAR40TEXT40
LTXA2Second line of the description LTXA2CHAR40TEXT40
TXTSPLanguage Key SPRASLANG1ISOLASPRASSPRH_T002
VPLTYType of the referenced task list VPLNTYCHAR1PLNTY
VPLNRGroup of the referenced task list VPLNNRCHAR8ALPHAPLNNR
VPLALGroup counter of the referenced task list VPLNALCHAR2ALPHAALTNR
VPLFLReferenced sequence in routing VPLBFLCHAR6ALPHAPLNFOLGE
VGWTSStandard value key VORGSCHLCHAR4VORGSCHL
LAR01Activity Type LSTARCHAR6LSTARLARLART_EMPTY
LAR02Activity Type LSTARCHAR6LSTARLARLART_EMPTY
LAR03Activity Type LSTARCHAR6LSTARLARLART_EMPTY
LAR04Activity Type LSTARCHAR6LSTARLARLART_EMPTY
LAR05Activity Type LSTARCHAR6LSTARLARLART_EMPTY
LAR06Activity Type LSTARCHAR6LSTARLARLART_EMPTY
ZERMAType of standard value calculation DZERMACHAR5ZERMA
ZGDATDate when the standard value was calculated DZGDATCHAR4GJAHRCJAHR
ZCODEReference number for standard value code DZCODECHAR6ZCODE
ZULNRBasis for standard value calculation DZULNRCHAR5ZULNR
LOANZNumber of Time Tickets LOHNANZDEC3LOHNANZ
LOARTWage Type LOHNARTCHAR4LOART
RSANZNumber of confirmation slips CR_RS_ANZNUMC3NUM03
QUALFSuitability QUALFCHAR2QUALF
ANZMANumber of employees ANZMSDEC5(2) ANZMA
RFGRPSetup group category RUEFAGRPCHAR10RUEFAGRP
RFSCHSetup group key RUEFASCHLUCHAR10RUEFASCHLU
RASCHSetup Type Key RUEARSCHLUCHAR2RUEARSCHLU
AUFAKScrap factor AUSCHUFAKDEC5(3) AUSCHUFAK
LOGRPWage group LOHNGRPCHAR3LOHNGRP
UEMUSRequired overlapping UEMUSKZCHAR1XFELD
UEKANOptional overlapping UEKANKZCHAR1XFELD
FLIESIndicator: continuous flow production FLIESSKZCHAR1XFELD
SPMUSRequired splitting SPLITTUNGCHAR1XFELD
SPLIMMaximum number of splits SPLITTANZDEC3SPLITTANZ
ABLIPKZIndicator: simultaneous teardown and wait ABLIPKZCHAR1FLAG
RSTRAReduction strategy per operation/activity RSTRACHAR2RSTRA
SUMNRNode number of the superior operation SUMKNTNRNUMC8KNTNR
SORTLSort Term for Non-Stock Info Records SORTICHAR10CHAR10
LIFNRAccount Number of Vendor or Creditor LIFNRCHAR10ALPHALIFNRLIFKRED_C
PREISPrice PREISCURR11(2) WERT11
PEINHPrice Unit PEINHDEC5PACK3
SAKTOCost Element KSTARCHAR10ALPHAKSTARKAT
WAERSCurrency Key WAERSCUKY5WAERSFWS
INFNRNumber of Purchasing Info Record INFNRCHAR10ALPHAINFNRINFMEIN_C
ESOKZPurchasing info record category ESOKZCHAR1ESOKZESO
EKORGPurchasing Organization EKORGCHAR4EKORGEKO
EKGRPPurchasing group for external processing VG_EKGRPCHAR3EKGRP
KZLGFIndicator: fixed lot external processing KZLGFCHAR1XFELD
KZWRTFIndicator: Fixed price for external processing KZWRTFCHAR1XFELD
MATKLMaterial Group MATKLCHAR9MATKLMKLS_WBWG
DDEHNIndicator: flexible duration DAUDEHNCHAR1X
ANZZLNumber of capacities required ANZKAPINT13INT1
PRZNTWork percentage APROZENTINT13INT1
MLSTNUsage MILESTONECHAR5MILESTONE
PPRIOPriority PRIORITAETCHAR2PRIORITAET
BUKRSCompany Code BUKRSCHAR4BUKRSBUKC_T001
ANFKORequesting cost center ANFKOCHAR10ALPHAKOSTL
ANFKOKRSControlling area of the requesting cost center ANFKOKRSCHAR4CACCD
INDETKey for calculation INDETCHAR1INDET
LARNTActivity Type LSTARCHAR6LSTARLARLART_EMPTY
PRKSTCosts in the activity PRKSTCURR11(2) PRKST
APLFLSequence PLNFOLGECHAR6ALPHAPLNFOLGE
RUECKCompletion confirmation number for the operation CO_RUECKNUMC10CO_RUECKRCK
RMZHLConfirmation counter CO_RMZHLNUMC8CIM_COUNTRZL
PROJNWork breakdown structure element (WBS element) PS_PSP_ELENUMC8KONPRPS_POSNR
OBJNRObject number J_OBJNRCHAR22J_OBJNRONR
SPANZActual number of splits SPLITTERMDEC3DEC3
BEDIDID of the capacity requirements record BEDIDNUMC12BEDID
BEDZLInternal counter CIM_COUNTNUMC8CIM_COUNT
BANFNPurchase requisition number CO_BANFNCHAR10ALPHABANFN
BNFPOItem number of the purchase requisition in the order CO_BNFPONUMC5BNFPO
LEK01Indicator: No remaining activity expected CO_LEIKZCHAR1XFELD
LEK02Indicator: No remaining activity expected CO_LEIKZCHAR1XFELD
LEK03Indicator: No remaining activity expected CO_LEIKZCHAR1XFELD
LEK04Indicator: No remaining activity expected CO_LEIKZCHAR1XFELD
LEK05Indicator: No remaining activity expected CO_LEIKZCHAR1XFELD
LEK06Indicator: No remaining activity expected CO_LEIKZCHAR1XFELD
SELKZSelection indicator for costing line items CO_SELKZCHAR1CK_SELKZ
KALIDFactory Calendar WFCIDCHAR2WFCIDFCI
FRSPEarliest possible activity / Latest possible activity FRSPCHAR1FRSP
STDKNNode of operation within reference operation set STDKNNUMC8KNTNR
ANLZUSyst.Condition ANLZUCHAR1ANLZU
ISTRUAssembly ISTRUCHAR18MATN1MATNR
ISTTYBOM category STLTYCHAR1STLTY
ISTNRBill of material STNUMCHAR8NUMCVSTNUMSTLNR
ISTKNBOM item node number STLKNNUMC8KNTNR
ISTPOInternal counter CIM_COUNTNUMC8CIM_COUNT
IUPOZSubitem Number UPOSZCHAR4NUMCVSPOSN
EBORTInstallation Point for Subitem EBORTCHAR20TEXT20
VERTLDistr.cap.reqmts (plant maint.,process order, network) CR_VERTNCHAR8CR_VERTL
LEKNWIndicator: No Remaining Work Expected LEKNWCHAR1XFELD
NPRIOPriority NW_PRIOCHAR1NW_PRIO
PVZKNGeneral counter for order CO_APLZLNUMC8CO_APLZL
PHFLGIndicator: Phase PHFLGCHAR1XFELD
PHSEQControl Recipe Destination PHSEQCHAR2PHSEQ
KNOBJNumber of Object with Assigned Dependencies KNOBJNUMC18KNOBJ
ERFSICHTRecording View QERFSICHTCHAR2QERFSICHTQER
QPPKTABSFlow Variants for Inspection Point Completion QPPKTABSCHAR1QPPKTABS
OTYPEObject Type OTYPECHAR2OTYPEPOT
OBJEKTIDObject ID OBJEKTIDNUMC8NUM08PON
QLKAPARCapacity category QL_KAPARTCHAR3KAPARTCAA
RSTUFReduction level which reduces operation lead time RSTUFNUMC1REDST
NPTXTKYInternal text number (12-character) TXTKYCHAR12CHAR12
SUBSYSSubsystem Identifier for QM Subsystem Interface QEIFSUBSYSCHAR6QEIFSUBSYS
PSPNRStandard WBS element PS_SPS_ELENUMC8KONPTPS_SPSNR
PACKNOPackage number PACKNONUMC10PACKNO
TXJCDTax Jurisdiction TXJCDCHAR15TXJCDTXJ
SCOPEObject Class SCOPE_CVCHAR2SCOPESCOPE_CVPCO
GSBERBusiness Area GSBERCHAR4GSBERGSB
PRCTRProfit Center PRCTRCHAR10ALPHAPRCTRPRCPRCTR_EMPTY
NO_DISPEffective for Materials Planning NO_DISP_PLUSCHAR1NO_DISP_PLUS
QKZPRZEITInterval = Time (Time-Related) QKZPRZEITCHAR1QKZ
QKZZTMG1Quantity Confirmation for Each Partial Lot QKZZTMG1CHAR1QKZ
QKZPRMENGCreation Cycle = Quantity (Quantity-Reference) QKZPRMENGCHAR1QKZ
QKZPRFREIInterval Without Reference to Time or Quantity QKZPRFREICHAR1QKZ
KZFEATIndicator Is Not Used Currently QKZFEATCHAR1QKZFEAT
QKZTLSBESTOperation with Stock-Related Partial Lot Assignment QKZTLSBESTCHAR1QKZ
AENNRChange Number AENNRCHAR12AENNRAENNRAEN
CUOBJ_ARBConfiguration (internal object number) CUOBJNUMC18CUOBJCUX
EVGEWAggregation weight for POC (PS progress) EV_WEIGHTDDEC8DEC8
ARBIIActual operating resources object identification CR_OBJID_INUMC8CR_OBJID
WERKIActual plant WERKS_ICHAR4WERKSWRK
CY_SEQNRVSequence number operation CY_SEQNRVNUMC14CY_SEQNR
KAPT_PUFFROperation floats after finite scheduling (in seconds) KAPT_PUFFRINT410INT4
EBELNPurchasing Document Number EBELNCHAR10ALPHAEBELNBESMEKK_C
EBELPItem Number of Purchasing Document EBELPNUMC5EBELPBSP
WEMPFGoods Recipient/Ship-To Party WEMPFCHAR12WEMPF
ABLADUnloading Point ABLADCHAR25TEXT25
CLASFInd.: Take Activity Into Account for Project Summarization CLASFCHAR1XFELD
FRUNVIndicator: External procurement data incomplete FRUNVCHAR1KREUZ
ZSCHLOverhead key AUFZSCHLCHAR6CHAR6
KALSMCosting Sheet AUFKALSMCHAR6KALSM
SCHED_ENDInd.: Purchase requisition at activity finish date SCEND_ACTCHAR1XFELD
NETZKONTIndicator for the account assignment of a network(hdr/act.) NETZKONTCHAR1NETZKONT
OWAERObject currency for network activity OWAERSCUKY5WAERS
AFNAMName of Requisitioner/Requester AFNAMCHAR12AFNAM
BEDNRRequirement Tracking Number BEDNRCHAR10CHAR10
KZFIXIndicator: Purchasing info record data are fixed CN_KZFIXCHAR1XFELD
PERNRPersonnel number CO_PERNRNUMC8PERNRPER
FRDLBIndicator: Externally processed op. with subcontracting CO_FRDLBCHAR1CHAR1
QPARTInspection Type QPARTCHAR8QPARTQLA
LOEKZDeletion flag AUFLOEKZCHAR1XFELD
WKURSExchange Rate WKURSDEC9(5) EXCRTKURSP
PROD_ACTIndicator: Activity is a production activity PROD_ACTCHAR1XFELD
FPLNRBilling plan number / invoicing plan number FPLNRCHAR10FPLNR
OBJTYPEChange indicator OCM_OBJ_TYPECHAR1OCM_OBJ_TYPE
CH_PROCProcess that has lead to the change of an object OCM_CH_PROCCHAR1OCM_CH_PROC
KLVARCosting Variant CK_KLVARCHAR4KLVARKRT
KALNRCost Estimate Number for Cost Est. w/o Qty Structure CK_KALNRNUMC12CK_KALNRKNR
FORDNFramework Order SFORDNCHAR10ALPHAEBELN
FORDPItem of framework order FORDPNUMC5EBELP
MAT_PRKSTMaterial planning in networks: primary costs MAT_PRKSTCURR11(2) PRKST
PRZ01Business Process CO_PRZNRCHAR12ALPHACO_PRZNRKWP
RFPNTReference point for BOM transfer CN_RFPNTCHAR20CN_RFPNT
FUNC_AREAFunctional Area FKBERCHAR16FKBERFBE
TECHSParameter Variant/Standard Variant TECHSCHAR12TECHS
ADPSPReference Element PM/PS ADDCOMPARE_CORECHAR40ADDCOMPARE_COREADCP
RFIPPNTReference Point for Relationship Between iPPE and PS CN_RPIPCHAR20CN_RFPNT
MES_OPERIDKey of an Operation from an ME System CO_MES_INT_OPERIDCHAR48CHAR48
MES_STEPIDKey of a Step in a Routing (SAP ME) CO_MES_INT_STEPIDCHAR6CHAR6
.INCLU--AP 0
/CUM/CUGUIDUUID in X form (binary) SYSUUID_XRAW16SYSUUID
.INCLU--AP 0
/ISDFPS/OBJNRObject number J_OBJNRCHAR22J_OBJNRONR
.INCLU--AP 0
AFVC_STATUSStatus Combination ACTCMB_DELEINT13ACTCMB_DOM
.INCLU--AP 0
MILL_OC_AUFNR_MONumber of Combined Order MILL_OC_AUFNR_MOCHAR12ALPHAAUFNR
.INCLU--AP 0
WTY_INDWarranty indicator WTYSC_WTY_INDICATORCHAR1WTYSC_WTY_INDICATOR
MEINHUnit of Measure for Activity/Operation VORMEUNIT3CUNITMEINS
UMRENDenominator for converting rtg and op units of measure CP_UMRENDEC5UMBSN
UMREZNumerator for converting task list and oper. un. of measure CP_UMREZDEC5UMBSZ
BMSCHBase Quantity BMSCHQUAN13(3) BMSCH
ZMERHBreak DZMERHQUAN9(3) VGWRT
ZEIERUnit for the break time DZEIERUNIT3CUNITMEINS
VGE01Unit of measure for the standard value VGWRTEHUNIT3CUNITMEINS
VGW01Standard Value VGWRTQUAN9(3) VGWRT
VGE02Unit of measure for the standard value VGWRTEHUNIT3CUNITMEINS
VGW02Standard Value VGWRTQUAN9(3) VGWRT
VGE03Unit of measure for the standard value VGWRTEHUNIT3CUNITMEINS
VGW03Standard Value VGWRTQUAN9(3) VGWRT
VGE04Unit of measure for the standard value VGWRTEHUNIT3CUNITMEINS
VGW04Standard Value VGWRTQUAN9(3) VGWRT
VGE05Unit of measure for the standard value VGWRTEHUNIT3CUNITMEINS
VGW05Standard Value VGWRTQUAN9(3) VGWRT
VGE06Unit of measure for the standard value VGWRTEHUNIT3CUNITMEINS
VGW06Standard Value VGWRTQUAN9(3) VGWRT
ZEIMUUnit for the minimum overlap time DZEIMUUNIT3CUNITMEINS
ZMINUMinimum overlap time DZMINUQUAN9(3) VGWRT
MINWEMinimum Send-Ahead Quantity MINWEIQUAN13(3) MINWEI
ZEIMBUnit for the minimum processing time DZEIMBUNIT3CUNITMEINS
ZMINBMinimum processing time DZMINBQUAN9(3) VGWRT
ZEILMUnit for the maximum wait time DZEILMUNIT3CUNITMEINS
ZLMAXMaximum wait time DZLMAXQUAN9(3) VGWRT
ZEILPUnit for the required wait time DZEILPUNIT3CUNITMEINS
ZLPROMinimum wait time DZLPROQUAN9(3) VGWRT
ZEIWNUnit for the standard queue time DZEIWNUNIT3CUNITMEINS
ZWNORStandard queue time DZWNORQUAN9(3) VGWRT
ZEIWMUnit for the minumum queue time DZEIWMUNIT3CUNITMEINS
ZWMINMinimum queue time DZWMINQUAN9(3) VGWRT
ZEITNUnit for the standard move time DZEITNUNIT3CUNITMEINS
ZTNORStandard move time DZTNORQUAN9(3) VGWRT
ZEITMUnit for the minimum move time DZEITMUNIT3CUNITMEINS
ZTMINMinimum move time DZTMINQUAN9(3) VGWRT
PLIFZPlanned Delivery Time in Days PLIFZDEC3DEC3
DAUNONormal duration of the activity DAUNORQUAN5(1) DAUER_4_1
DAUNENormal duration/unit DAUNOREUNIT3CUNITMEINS
DAUMIMinimum activity duration DAUMINQUAN5(1) DAUER_4_1
DAUMEUnit for the minimum duration DAUMINEUNIT3CUNITMEINS
EINSAConstraint on the basic start date for the activity EINSCHRACHAR1RESTRIKSTR
EINSEConstraint on the finish date of the activity EINSCHRECHAR1RESTRIKEND
ARBEIWork involved in the activity ARBEITQUAN7(1) ARBEIT
ARBEHUnit for work ARBEITEUNIT3CUNITMEINS
MGVRGOperation Quantity MGVRGQUAN13(3) MENG13
ASVRGOperation scrap ASVRGQUAN13(3) MENG13
LMNGATotal Yield Confirmed LMNGAQUAN13(3) MENG13
XMNGATotal scrap quantity confirmed XMNGAQUAN13(3) MENG13
GMNGAConfirmed yield in order unit of measure GMNGAQUAN13(3) MENG13
ISM01Previously confirmed activity CO_RUMNGQUAN13(3) MENGV13
ISM02Previously confirmed activity CO_RUMNGQUAN13(3) MENGV13
ISM03Previously confirmed activity CO_RUMNGQUAN13(3) MENGV13
ISM04Previously confirmed activity CO_RUMNGQUAN13(3) MENGV13
ISM05Previously confirmed activity CO_RUMNGQUAN13(3) MENGV13
ISM06Previously confirmed activity CO_RUMNGQUAN13(3) MENGV13
ISMNWActual work CO_ISMNWQUAN13(3) MENG13
FSAVDEarliest scheduled start: Execution (date) FSAVDDATS8DATUM
FSAVZEarliest scheduled start: Execution (time) FSAVZTIMS6ATIME
FSSBDEarliest scheduled start: Processing (date) FSSBDDATS8DATUM
FSSBZEarliest scheduled start: Processing (time) FSSBZTIMS6ATIME
FSSADEarliest scheduled start: Teardown (date) FSSADDATS8DATUM
FSSAZEarliest scheduled start: Teardown (time) FSSAZTIMS6ATIME
FSEDDEarliest scheduled finish: Execution (date) FSEDDDATS8DATUM
FSEDZEarliest scheduled finish: Execution (time) FSEDZTIMS6ATIME
FSSLDEarliest scheduled start: Wait (date) FSSLDDATS8DATUM
FSSLZEarliest scheduled start: Wait (time) FSSLZTIMS6ATIME
FSELDEarliest scheduled finish: Wait (date) FSELDDATS8DATUM
FSELZEarliest scheduled finish: Wait (time) FSELZTIMS6ATIME
SSAVDLatest scheduled start: Execution (date) SSAVDDATS8DATUM
SSAVZLatest scheduled start: Execution (time) SSAVZTIMS6ATIME
SSSBDLatest scheduled start: Processing (date) SSSBDDATS8DATUM
SSSBZLatest scheduled start: Processing (time) SSSBZTIMS6ATIME
SSSADLatest scheduled start: Teardown (date) SSSADDATS8DATUM
SSSAZLatest scheduled start: Teardown (time) SSSAZTIMS6ATIME
SSEDDLatest scheduled finish: Execution (date) SSEDDDATS8DATUM
SSEDZLatest scheduled finish: Execution (time) SSEDZTIMS6ATIME
SSSLDLatest scheduled start: Wait time (date) SSSLDDATS8DATUM
SSSLZLatest scheduled start: Wait time SSSLZTIMS6ATIME
SSELDLatest scheduled finish: Wait time (date) SSELDDATS8DATUM
SSELZLatest scheduled finish: Wait time SSELZTIMS6ATIME
ISAVDActual operation start (date) ISAVDDATS8DATUM
IEAVDActual finish of operation (date) IEAVDDATS8DATUM
ISDDActual start: Execution (date) ISDDDATS8DATUM
ISDZActual start: Execution/setup (time) ISDZTIMS6ATIME
IERDActual finish: Setup (date) IERDDATS8DATUM
IERZActual finish: Setup (time) IERZTIMS6ATIME
ISBDActual start: Processing (date) ISBDDATS8DATUM
ISBZActual start: Processing (time) ISBZTIMS6ATIME
IEBDActual finish: Processing (date) IEBDDATS8DATUM
IEBZActual processing finish (time) IEBZTIMS6ATIME
ISADActual start: Teardown (date) ISADDATS8DATUM
ISAZActual start: Teardown (time) ISAZTIMS6ATIME
IEDDActual finish: Execution (date) IEDDDATS8DATUMEDR
IEDZActual finish: Execution (time) IEDZTIMS6ATIMEEZR
PEDDForecast finish date of operation from confirmation CO_PEDDDATS8DATUM
PEDZForecast finish time of operation from confirmation CO_PEDZTIMS6ATIME
PUFFRFree float PUFFR_FREIDEC3PUFFER
PUFGSTotal float PUFFR_GESMDEC3PUFFER
NTANFConstraint for activity start (Basic) VORGABESTDDATS8VORGABESTR
NTANZConstraint for activity start time (Basic) VORGABESTZTIMS6ATIME
NTENDConstraint for Finish of Activity (Basic) VORGABEEND2DATS8VORGABEEND
NTENZBasic finish time of the activity VORGABEENZTIMS6ATIME
EWSTDForecasted start date for the activity EWSTARTDDATS8DATUM
EWSTZForecast start time of the activity EWSTARTZTIMS6ATIME
EWENDForecast finish date EWENDEDDATS8DATUM
EWENZForecast finish time for the activity EWENDEZTIMS6ATIME
EWDANNormal duration (from forecast) of activity EWDANQUAN5(1) DAUER_4_1
EWDNEUnit for forecast normal duration EWDNEUNIT3CUNITMEINS
EWDAMMinimum duration (from forecast) for activity EWDAMQUAN5(1) DAUER_4_1
EWDMEUnit for forecast minimum duration EWDMEUNIT3CUNITMEINS
EWSTEForecast date constraint on activity finish PS_RESTECHAR1RESTRIKEND
EWSTAForecast date constraint on activity start PS_RESTACHAR1RESTRIKSTR
WARTZQueue time used for scheduling WARTEZEITFLTP16(16) CX_ZEIT
WRTZEUnit of measure for queue time WTRZEUNIT3CUNITEINHEIT
RUESTSetup time RUESTFLTP16(16) CX_ZEIT
RSTZEUnit of measure for setup time RSTZEUNIT3CUNITEINHEIT
BEARZProcessing time BEARZEITFLTP16(16) CX_ZEIT
BEAZEUnit of measure for processing time BEAZEUNIT3CUNITEINHEIT
ABRUETeardown ABRUEFLTP16(16) CX_ZEIT
ARUZEUnit of measure for teardown ARUZEUNIT3CUNITEINHEIT
LIEGZWait time used for scheduling LIEGEZEITFLTP16(16) CX_ZEIT
LIGZEUnit of measure for wait time LIGZEUNIT3CUNITEINHEIT
TRANZMove time used for scheduling TRANSZEITFLTP16(16) CX_ZEIT
TRAZEUnit of measure for move time TRAZEUNIT3CUNITEINHEIT
ISERHConfirmed break time ISERHQUAN9(3) VGWRT
OFM01Forecast value used to update the standard value CO_SCHAETZQUAN9(3) VGWRT
OFM02Forecast value used to update the standard value CO_SCHAETZQUAN9(3) VGWRT
OFM03Forecast value used to update the standard value CO_SCHAETZQUAN9(3) VGWRT
OFM04Forecast value used to update the standard value CO_SCHAETZQUAN9(3) VGWRT
OFM05Forecast value used to update the standard value CO_SCHAETZQUAN9(3) VGWRT
OFM06Forecast value used to update the standard value CO_SCHAETZQUAN9(3) VGWRT
OFMNWForecasted work (actual + remaining) OFMNWQUAN7(1) ARBEIT
BZOFFBReference date for start of sub-operation CP_OBZOFFBCHAR2CP_BZOFF
EHOFFBUnit for offset to start CP_OEHOFFBUNIT3CUNITMEINS
OFFSTBOffset to sub-operation start CP_OOFFSTBQUAN5VNZTV
OFFSTEOffset to sub-operation finish CP_OOFFSTEQUAN5VNZTV
BZOFFEReference date for finish of sub-operation CP_OBZOFFECHAR2CP_BZOFF
EHOFFEUnit for offset to finish CP_OEHOFFEUNIT3CUNITMEINS
FPAVDEarliest scheduled start date (forecast) FPAVDDATS8DATUM
FPAVZEarliest scheduled start time (forecast) FPAVZTIMS6ATIME
FPEDDEarliest scheduled finish date (forecast) FPEDDDATS8DATUM
FPEDZEarliest scheduled finish time (forecast) FPEDZTIMS6ATIME
SPAVDLatest scheduled start date (forecast) SPAVDDATS8DATUM
SPAVZLatest scheduled start time (forecast) SPAVZTIMS6ATIME
SPEDDLatest scheduled finish date (forecast) SPEDDDATS8DATUM
SPEDZLatest scheduled finish time (forecast) SPEDZTIMS6ATIME
BEAZPUnit of processing time (Forecast) BEAZEPUNIT3CUNITEINHEIT
PUFGPTotal float (from forecast) PPUFF_GESMDEC3PUFFER
PUFFPFree float (from forecast) PPUFF_FREIDEC3PUFFER
BEARPProcessing time (forecast) PBEARZEITFLTP16(16) CX_ZEIT
EPANFDispatched start date for operation EPANFDATS8DATUM
EPANZDispatched start time for operation EPANZTIMS6ATIME
EPENDDispatched finish date EPENDDATS8DATUM
EPENZDispatched finish time EPENZTIMS6ATIME
PDAUForecasted duration of activity from confirmation PDAUQUAN5(1) DAUER_4_1
PDAEUnit of the forecasted duration from the confirmation PDAEUNIT3CUNITMEINS
KNOTETransportation Connection Points KNOTECHAR10KNOTN
VSTZWDeadline function VSTZWCHAR4VSTZW
VSTGADeadline deviation reason VSTGACHAR4VSTGA
QRASTZEHTTime Unit QRASTZEHTUNIT3CUNITMEINS
QRASTZFAKTime Factor QRASTZFAKDEC5(2) QPROBEFAK
QRASTMENGQuantity Between Two Inspections QRASTMENGQUAN13(3) MENG13
QRASTEREHGrid Unit of Measure QRASTEREHUNIT3CUNITMEINS
AUFKTExecution Factor AFAKTDEC3AFAKT
RMNGATotal confirmed rework quantity RMNGAQUAN13(3) MENGV13
ILE01Unit of measure for the activity to be confirmed CO_ISMNGEHUNIT3CUNITMEINS
ILE02Unit of measure for the activity to be confirmed CO_ISMNGEHUNIT3CUNITMEINS
ILE03Unit of measure for the activity to be confirmed CO_ISMNGEHUNIT3CUNITMEINS
ILE04Unit of measure for the activity to be confirmed CO_ISMNGEHUNIT3CUNITMEINS
ILE05Unit of measure for the activity to be confirmed CO_ISMNGEHUNIT3CUNITMEINS
ILE06Unit of measure for the activity to be confirmed CO_ISMNGEHUNIT3CUNITMEINS
RWFAKRework factor (is not used yet) RWFAKDEC5(3) AUSCHUFAK
IPRZ1Confirmed quantity/work for business process CO_IPRZSQUAN13(3) MENGV13
IPRE1Unit of measurement for conf. quantity for business process RU_IPRZEUNIT3CUNITMEINS
IPRK1No remaining quantity expected for business process RU_IPRZKCHAR1XFELD
TAKTtakt within a line segment LD_TAKTNUMC4LD_TAKT
OPRZ1Remaining quantity for business process OPRZ1QUAN13(3) MENGV13
OPRE1Unit for remaining quantity of business process OPRE1UNIT3CUNITMEINS
PSPM_INDICATORIndicates PMCS date influence activity scheduling PSPM_INDICATORCHAR1PSPM_INDICATOR
SLWIDKey word ID for user-defined fields SLWIDCHAR7SLWID
USR00User field with 20 characters USRCHAR20CHAR20USRCHAR20
USR01User field with 20 characters USRCHAR20CHAR20USRCHAR20
USR02User field with 10 characters USRCHAR10CHAR10USRCHAR10
USR03User field with 10 characters USRCHAR10CHAR10USRCHAR10
USR04User field for quantity (length 10.3) USRQUAN13QUAN13(3) USRQUAN13
USE04User field: Unit for quantity fields USRUNITUNIT3CUNITMEINS
USR05User field for quantity (length 10.3) USRQUAN13QUAN13(3) USRQUAN13
USE05User field: Unit for quantity fields USRUNITUNIT3CUNITMEINS
USR06User-defined field for values (length 10,3) USRCURR13CURR13(3) USRCURR13
USE06User field: Unit for value fields USRCUKYCUKY5WAERS
USR07User-defined field for values (length 10,3) USRCURR13CURR13(3) USRCURR13
USE07User field: Unit for value fields USRCUKYCUKY5WAERS
USR08User field for date USRDATEDATS8USRDATE
USR09User field for date USRDATEDATS8USRDATE
USR10User-defined field: Indicator for reports USRFLAGCHAR1FLAG
USR11User-defined field: Indicator for reports USRFLAGCHAR1FLAG
VNAMEJoint Venture JV_NAMECHAR6ALPHAJV_NAMEJVV
RECIDRecovery Indicator JV_RECINDCHAR2ALPHAJV_RECIND
ETYPEEquity type JV_ETYPECHAR3ALPHAJV_ETYPE
JV_OTYPEJoint Venture Object Type JV_OTYPECHAR4ALPHAJV_OTYPE
JV_JIBCLJIB/JIBE Class JV_JIBCLCHAR3JV_JIBCLJIB
JV_JIBSAJIB/JIBE Subclass A JV_JIBSACHAR5JV_JIBSAJBS
JV_OCOJV original cost object JV_OR_COCHAR1JV_OR_COB
DUMMY_CI_AFVUSingle-Character Indicator CHAR1CHAR1CHAR1
SPARAMETER1Scheduling Parameters for External Scheduling SPARAMETERCHAR4
SPARAMETER2Scheduling Parameters for External Scheduling SPARAMETERCHAR4
SPARAMETER3Scheduling Parameters for External Scheduling SPARAMETERCHAR4
.INCLU--AP 0
/MRSS/ID_PROFILERequirements Profile Was Changed Manually /MRSS/T_REQU_UPDCHAR1/MRSS/_HCM_BOOLEAN
/MRSS/PROF_KEYProfile Key /MRSS/T_RSG_REQUIDCHAR10ALPHA/MRSS/RSG_REQUID
/MRSS/PROF_GUIDCharacter field, length 32 CHAR32CHAR32CHAR32
/MRSS/ACT_TYPEProcess variant /MRSS/T_ACTIVITY_TYPECHAR1/MRSS/_ACTIVITY_TYPE
/MRSS/ORDER_PROBOrder probability in percent /MRSS/T_ORDER_PROBCHAR3OPROB/MRSS/_ORDER_PROB
/MRSS/INIT_DONEInternal initialization carried out once /MRSS/T_INIT_DONECHAR1FLAG
/MRSS/DATACHANGEData was changed in the controls on the user screen /MRSS/T_USCREENCTL_DATACHANGEDCHAR1FLAG
/MRSS/DEM_COUNTCounter for Demands in Operation /MRSS/T_DEM_COUNTNUMC4NUMC4
/MRSS/SUPERV_CNTNumber of Site Supervisors /MRSS/T_RAP_SUPERVISOR_COUNTCHAR2ALPHA/MRSS/_RAP_SUPERVISOR_COUNT
/MRSS/RULE_IDTime Rule Id /MRSS/T_RSG_TIME_RULE_IDCHAR25TEXT25
/MRSS/SALES_ORGSales Organization VKORGCHAR4VKORGVKOC_VKORG
/MRSS/REFF_RCNTDetermination of Remaining Demand: No. of Resources /MRSS/T_REM_EFFORT_RES_COUNTNUMC3NUMC3
/MRSS/REFF_E_BEGTime stamp: start /MRSS/T_TIMESTAMP_BEGINNUMC14TSTLC/MRSS/_TIMESTAMP
/MRSS/REFF_E_ENDTime stamp: end /MRSS/T_TIMESTAMP_ENDNUMC14TSTLC/MRSS/_TIMESTAMP
/MRSS/REFF_L_BEGTime stamp: start /MRSS/T_TIMESTAMP_BEGINNUMC14TSTLC/MRSS/_TIMESTAMP
/MRSS/REFF_L_ENDTime stamp: end /MRSS/T_TIMESTAMP_ENDNUMC14TSTLC/MRSS/_TIMESTAMP
/MRSS/RELEVANTOperation Set as MRS-Relevant /MRSS/T_RELEVANT_FOR_MRSCHAR1FLAG
/MRSS/TEAM_PLANTeam Planning flag for Demand /MRSS/T_RSG_TEAM_PLANNINGCHAR1/MRSS/_RSG_TEAM_PLANNING
/MRSS/SINGL_RESIndicator for Forcing a Single Resource /MRSS/T_RSG_FORCE_SINGLE_RESCHAR1/MRSS/_BOOLEAN
/MRSS/TO_BEGDATField of type DATS DATSDATS8DATS
/MRSS/TO_BEGTIMField of type TIMS TIMSTIMS6TIME
/MRSS/TO_ENDDATField of type DATS DATSDATS8DATS
/MRSS/TO_ENDTIMField of type TIMS TIMSTIMS6TIME
/MRSS/TO_DURATCharacter Field Length = 10 CHAR10CHAR10CHAR10
/MRSS/TO_DUNITBase Unit of Measure MEINSUNIT3CUNITMEINS
/MRSS/TO_DISTAN19 Characters CHAR19CHAR19CHAR19
/MRSS/TO_MANUALBoolean Variable /MRSS/T_RSG_BOOLEANCHAR1/MRSS/_RSG_BOOLEAN
/MRSS/FR_BEGDATField of type DATS DATSDATS8DATS
/MRSS/FR_BEGTIMField of type TIMS TIMSTIMS6TIME
/MRSS/FR_ENDDATField of type DATS DATSDATS8DATS
/MRSS/FR_ENDTIMField of type TIMS TIMSTIMS6TIME
/MRSS/FR_DURATCharacter Field Length = 10 CHAR10CHAR10CHAR10
/MRSS/FR_DUNITBase Unit of Measure MEINSUNIT3CUNITMEINS
/MRSS/FR_DISTAN19 Characters CHAR19CHAR19CHAR19
/MRSS/FR_MANUALBoolean Variable /MRSS/T_RSG_BOOLEANCHAR1/MRSS/_RSG_BOOLEAN
.INCLU--AP 0
ILART_OPMaintenance activity type ILACHAR3ILARTH_T350I
.INCLU--AP 0
FERC_INDRegulatory indicator FE_INDCHAR4ALPHAFE_IND
FLGATSequence category FOLGENARTCHAR1FLGAT
APLFZPlanned Delivery Time in Days PLIFZDEC3DEC3
ARBPLWork center ARBPLCHAR8ARBPLAGR
LOSVGOperation quantity in order unit of measure CX_LOSVGQUAN13(3) MENG13
LOSMEBase Unit of Measure MEINSUNIT3CUNITMEINS
FLG_KMPIndicator: Components allocated FLG_KMPCHAR1KREUZ
FLG_PRMIndicator: Inspection Characteristics Assigned FLG_PRMCHAR1KREUZ
FLG_FHMIndicator: PRTs Assigned FLG_FHTCHAR1KREUZ
FLG_EVPIndicator: Trigger points allocated FLG_EVPCHAR1KREUZ
FLG_PSTIndicator: PS texts exist FLG_PSTCHAR1KREUZ
UVORNSuboperation UVORNCHAR4NUMCVVORNR
KOSTLCost Center KOSTLCHAR10ALPHAKOSTLKOS
KOKRSControlling Area KOKRSCHAR4CACCDCAC
DAWARQueue time CO_DAUWARQUAN7(1) DAUER_6_1
DARUESetup time CO_DAURUEQUAN7(1) DAUER_6_1
DABEAProcessing time CO_DAUBEAQUAN7(1) DAUER_6_1
DAABRTeardown time CO_DAUABRQUAN7(1) DAUER_6_1
DALIEWait time CO_DAULIEQUAN7(1) DAUER_6_1
VSTTXTSystem Status CO_STTXTCHAR40CHAR40
FLG_UVOIndicator: Suboperation exists FLG_UVOCHAR1XFELD
FLG_MSTIndicator: Milestone FLG_MSTCHAR1XFELD
FLG_RCKIndicator: Operation requires confirmation FLG_RCKCHAR1XFELD
FLG_OFFIndicator: Open operation (not finally confirmed) FLG_OFFCHAR1XFELD
FLG_FREIndicator: Release operation FLG_FRECHAR1XFELD
FLG_LOEIndicator: Operation is deleted FLG_LOECHAR1XFELD
FLG_FRDIndicator: Operation is processed externally FLG_FRDCHAR1XFELD
FLG_AWEIndicator: automatic goods receipt FLG_AWECHAR1XFELD
VARTDummy CIM_VARTCHAR1CIM_VART
INDBTField defined as in SY-TABIX TABIX_DINT410TABIX
AUFNRDOrder Number AUFNRCHAR12ALPHAAUFNRANR
DAPBEDuration of processing time (forecast) CO_DAUBEAPQUAN7(1) DAUER_6_1
WEMNG_OPRQuantity of Goods Received WEMNGQUAN13(3) MENG13
WEMEH_OPRPurchase Order Unit of Measure BSTMEUNIT3CUNITMEINS
DATRADuration of move time CO_DAUTRAQUAN7(1) DAUER_6_1
DADRFDuration of execution time (setup + processing + teardown) CO_DAUDRFQUAN7(1) DAUER_6_1
FSEVDEarliest finish of operation (date) FSEVDDATS8DATUM
FSEVZEarliest finish of operation (time) FSEVZTIMS6ATIME
SSEVDLatest finish date of operation SSEVDDATS8DATUM
SSEVZLatest operation finish (time) SSEVZTIMS6ATIME
BANFN_DELPurchase requisition number CO_BANFNCHAR10ALPHABANFN
BNFPO_DELItem number of the purchase requisition in the order CO_BNFPONUMC5BNFPO
KALTXDescription of the factory calendar KALTXCHAR20TEXT20
FLG_PURSIndicator: Purchase order exists FLG_PURSCHAR1KREUZ
KONNRNumber of Principal Purchase Agreement KONNRCHAR10ALPHAEBELNKTR
KTPNRItem Number of Principal Purchase Agreement KTPNRNUMC5EBELP
PVZNRSuperordinate Operation PVZNRCHAR4NUMCVVORNR
PVZINField defined as in SY-TABIX TABIX_DINT410TABIX
FLG_VABIndicator: Sub-network exists FLG_VABCHAR1X
QLSEARCHSearch term for qualification requirements QL_SEARCHCHAR12TEXT12
QLSTEXTObject Name STEXTCHAR40TEXT40
PSTXTARType of PS text to be copied into the purchase requisition NPTXARTCHAR2TXTAR
PSTXTTIPS text description TXTTICHAR20CHAR20
INDEXSUMNRField defined as in SY-TABIX TABIX_DINT410TABIX
ARBPIActual work center ARBPL_ICHAR8ARBPLAGR
AUDISPReservation Relevance/Generation of Purchase Requisition AUDISP_PLUSCHAR1AUDISP
FLIEFFixed Vendor FLIEFCHAR10ALPHALIFNR
TXCHGIndicator: long text changed TXCHGCHAR1XFELD
COMP_RESOCM: Result of comparison of two order objects OCM_COMP_RESCHAR1OCM_COMP_RES
ASKUMCumulative Scrap Qty of Subsequent Reporting Pts (Cur. Per.) X_KUM_PERQUAN13(3) MENG13
PSTXCHGInd.: Changed PS text PSTXCHGCHAR1XFELD
FLG_DLDocument links exist FLG_DLCHAR1KREUZ
FLG_CALCIndicator: Order (network etc.) still to be calculated FLG_CALCCHAR1KREUZ
SPLQSplit Quantity in Order Split SPLIT_QTYQUAN13(3) MENG13
EQUNREquipment Number EQUNRCHAR18ALPHAEQUNREQNEQUI
TPLNRFunctional Location TPLNRCHAR30TPLNRTPLNRIFLIFLM
IDENTOperation ID OPRIDCHAR8CHAR8
SERVCHGCheckbox XFELDCHAR1XFELD
FLG_OBJKNOBJ Is Filled, Object Dependencies Exist CKKNOBJONCHAR1XFELD
QMNUMNotification No QMNUMCHAR12ALPHAQMNUMIQM
NPLDANext planned date NPLDADATS8DATUM
EPROFILEExternal Procurement Profile MEPROFILECHAR2EPROFILE
.INCLU--AP 0
/CUM/INTCUNRCU: Internal CU Number in a Work Order /CUM/INTCUNRNUMC6NUMC6
VSNMRNumber or description of a version VSNMRCHAR12VSNMRVS2
ORGAUFPLRouting number of operations in the order CO_AUFPLNUMC10AUFPL
ORGAPLZLGeneral counter for order CO_APLZLNUMC8CO_APLZL
INACTVersion inactive indicator VSINACTCHAR1XFELD
S_RCNEV 0
OBJNRObject number J_OBJNRCHAR22J_OBJNRONR
GJAHRFiscal Year GJAHRNUMC4GJAHRGJAHRGJR
PERIOPeriod CO_PERIONUMC3PERBLVPE
EVGEWAggregation weight for POC (PS progress) EV_WEIGHTDDEC8DEC8
POC_PLNPercentage of completion EV_FERGRDDEC5(2) DEC03_2
POC_ACTPercentage of completion EV_FERGRDDEC5(2) DEC03_2
EVMET10_1Measurement method in PS progress analysis EV_MTTXT10CHAR10TEXT10
REFOB_1Reference object for secondary proportionality (text) EV_REFOBJ_TXTCHAR28CHAR28
EVMET10_2Measurement method in PS progress analysis EV_MTTXT10CHAR10TEXT10
REFOB_2Reference object for secondary proportionality (text) EV_REFOBJ_TXTCHAR28CHAR28
EVMET10_3Measurement method in PS progress analysis EV_MTTXT10CHAR10TEXT10
REFOB_3Reference object for secondary proportionality (text) EV_REFOBJ_TXTCHAR28CHAR28
EVMET10_4Measurement method in PS progress analysis EV_MTTXT10CHAR10TEXT10
REFOB_4Reference object for secondary proportionality (text) EV_REFOBJ_TXTCHAR28CHAR28
EVMET10_5Measurement method in PS progress analysis EV_MTTXT10CHAR10TEXT10
REFOB_5Reference object for secondary proportionality (text) EV_REFOBJ_TXTCHAR28CHAR28
EVMET10_6Measurement method in PS progress analysis EV_MTTXT10CHAR10TEXT10
REFOB_6Reference object for secondary proportionality (text) EV_REFOBJ_TXTCHAR28CHAR28
EVMET10_7Measurement method in PS progress analysis EV_MTTXT10CHAR10TEXT10
REFOB_7Reference object for secondary proportionality (text) EV_REFOBJ_TXTCHAR28CHAR28
EVMET10_8Measurement method in PS progress analysis EV_MTTXT10CHAR10TEXT10
REFOB_8Reference object for secondary proportionality (text) EV_REFOBJ_TXTCHAR28CHAR28
EVFLD10_1Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_2Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_3Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_4Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_5Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_6Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_7Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_8Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_9Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_10Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_11Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_122Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_13Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_14Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_15Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_16Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_17Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_18Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_19Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_20Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_21Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_22Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_23Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_24Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_25Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_26Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_27Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_28Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_29Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_30Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_31Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_32Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_33Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_34Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_35Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_36Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_37Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_38Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_39Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_40Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_41Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_42Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_43Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_44Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_45Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_46Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_47Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_48Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_49Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_50Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_51Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_52Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_53Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_54Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_55Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_56Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_57Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_58Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_59Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
EVFLD10_60Field in progress analysis (key word) EV_FELDSWCHAR10TEXT10
PSPELWork Breakdown Structure Element (WBS Element) PS_POSIDCHAR24PROJNPS_POSIDPRO
PTEXTPS: Short description (1st text line) PS_POST1CHAR40TEXT40
STUFELevel in Project Hierarchy PS_STUFEINT13INT1
NETNRNetwork number NW_AUFNRCHAR12ALPHAAUFNRANR
NTEXTDescription AUFTEXTCHAR40TEXT40
AUFNROrder Number AUFNRCHAR12ALPHAAUFNRANR
ATEXTDescription AUFTEXTCHAR40TEXT40
VORNRActivity number in network and standard network CN_VORNRCHAR4NUMCVVORNR
VTEXTOperation short text LTXA1CHAR40TEXT40
UVORNActivity element number (work/external/general costs) CN_ELEMENTCHAR4NUMCVVORNR
UTEXTOperation short text LTXA1CHAR40TEXT40
ZRANFStart date for display time period EV_DATUVDATS8DATUM
ZRENDFinish date of display time period EV_DATUBDATS8DATUM
UPD_INDCheckbox XFELDCHAR1XFELD
CHANGE_FLAGDummy for B20 int1 (Local Everywhere) INT1INT13INT1

Key field Non-key field



How do I retrieve data from SAP structure EVOPD_WBS using ABAP code?

As EVOPD_WBS is a database structure and not a table it does not store any data in the SAP data dictionary. The ABAP SELECT statement is therefore not appropriate and can not be performed on EVOPD_WBS as there is no data to select.

How to access SAP table EVOPD_WBS

Within an ECC or HANA version of SAP you can also view further information about EVOPD_WBS and the data within it using relevant transactions such as

SE11 (ABAP Dictionary Maintenance)
SM30 (Maintain Table Data)
SE80 (Object Navigator)
SE16 (Data Browser).