CKKVMK SAP (Transfer Segment for Costing Object) Structure details
Description: Transfer Segment for Costing Object
Structure field list including key, data, relationships and ABAP select examples
CKKVMK is a standard SAP Structure so does not store data like a database table does. It can be used to define the fields of other actual tables or to process "Transfer Segment for Costing Object" Information within sap ABAP programs.
This is done by declaring abap internal tables, work areas or database tables based on this Structure. These can then be used to store and process the required data appropriately.
i.e. DATA: wa_CKKVMK TYPE CKKVMK.
The CKKVMK table consists of various fields, each holding specific information or linking keys about Transfer Segment for Costing Object data available in SAP. These include MANDT (Client), KALAID (Name of Costing Run), KALADAT (Costing Run Date), TVERS (Costing Version).. See below for full list along with technical details, documentation, text table, check tables, foreign key relationships, conversion routines, relevant tcodes and example ABAP select code etc. .
Delivery Class:Display/Maintenance via tcode SM30: Display/Maintenance Allowed but with Restrictions
SAP enhancement categories: Can be enhanced (character-type or numeric)
SAP CKKVMK structure fields - Full list of fields found in SAP data dictionary
Field | Description | Data Element | Data Type | length (Dec) | Check table | Conversion Routine | Domain Name | MemoryID | SHLP |
MANDT | Client | MANDT | CLNT | 3 | Assigned to domain | MANDT | |||
KALAID | Name of Costing Run | CK_KALAID | CHAR | 8 | CHAR8 | KKF | CKKAT | ||
KALADAT | Costing Run Date | CK_KALADAT | DATS | 8 | DATUM | KK1 | |||
TVERS | Costing Version | CK_TVERS | NUMC | 2 | CK_VERSION | VSN | |||
KALST | Costing Level | CK_KALST | NUMC | 4 | CK_KALST | ||||
KALVZAE | Numerator for Costing Run Tables (KAL*) | CK_KALVZAE | INT4 | 10 | INT4 | ||||
DISST | Low-Level Code | DISST | CHAR | 3 | DISST | ||||
CYCLENR | Cycle Number Within a Run | CK_CYCLENR | NUMC | 5 | NUMC5 | ||||
WERKS | Plant | WERKS_D | CHAR | 4 | T001W | WERKS | WRK | H_T001W_C | |
MATNR | Material Number | MATNR | CHAR | 18 | MARA | MATN1 | MATNR | MAT | S_MAT1 |
KALNR | Cost Estimate Number - Product Costing | CK_KALNR1 | NUMC | 12 | Assigned to domain | CK_KALNR | KNE | ||
BWTAR | Valuation Type | BWTAR_D | CHAR | 10 | Assigned to domain | BWTAR | BWT | ||
VERID | Production Version | VERID | CHAR | 4 | Assigned to domain | VERID | VER | ||
VBELN | Sales and Distribution Document Number | VBELN | CHAR | 10 | Assigned to domain | ALPHA | VBELN | AUN | |
POSNR | Item number of the SD document | POSNR | NUMC | 6 | Assigned to domain | POSNR | |||
PSPNR | Work Breakdown Structure Element (WBS element) | WB_POSNR | NUMC | 8 | Assigned to domain | ABPSP | PS_POSNR | ||
STLAN | BOM Usage | STLAN | CHAR | 1 | T416 | STLAN | CSV | ||
STNUM | Bill of material | STNUM | CHAR | 8 | NUMCV | STNUM | STLNR | ||
STALT | Alternative BOM | STALT | CHAR | 2 | ALPHA | ALTNR | |||
STVFIX | Checkbox | XFELD | CHAR | 1 | XFELD | ||||
ALTSL | Method for Selecting Alternative Bills of Material | ALTSL | CHAR | 1 | ALTSL | ||||
PLNTY | Task List Type | PLNTY | CHAR | 1 | TCA01 | PLNTY | PTY | H_TCA01 | |
PLNNR | Key for Task List Group | PLNNR | CHAR | 8 | ALPHA | PLNNR | PLN | PLKS | |
PLNAL | Group Counter | PLNAL | CHAR | 2 | ALPHA | ALTNR | PAL | ||
PLNCT | Internal counter | CIM_COUNT | NUMC | 8 | CIM_COUNT | ||||
LOSGR | Planned lot size | LOSGR | QUAN | 13(3) | MENG13 | ||||
SUMLO | Planned lot size | LOSGR | QUAN | 13(3) | MENG13 | ||||
LOSAU | Lot Size Taking Scrap into Account | CK_LOSAU | QUAN | 13(3) | MENG13 | ||||
AUSSS | Assembly scrap in percent | AUSSS | DEC | 5(2) | DEC3_2 | ||||
MEINS | Valuation Unit of Measure | CK_MEINH_BEW | UNIT | 3 | T006 | CUNIT | MEINS | ||
KADAT | Date | DATUM | DATS | 8 | DATUM | ||||
BIDAT | Costing Date To | CK_BIDAT | DATS | 8 | CK_KADAT | KDB | |||
ALDAT | Quantity Structure Date for Costing | CK_BRDAT | DATS | 8 | CK_KADAT | ||||
BEDAT | Requirements Date | CK_BEDAT | DATS | 8 | CK_KADAT | ||||
BWDAT | Valuation Date of a Cost Estimate | CK_BWDAT | DATS | 8 | CK_KADAT | ||||
FEH_A_ANZ | No. System Messages in Selection/Qty Structure Determination | CK_FEH_ANZ | INT4 | 10 | CK_INT4 | ||||
FEH_K_ANZ | Number of System Messages in Costing | CK_FEH_ANK | INT4 | 10 | CK_INT4 | ||||
FEH_STATUS | Costing Status | CK_FEH_STA | CHAR | 2 | CK_STATUS | FEHSTA | |||
FEH_STATUF | Costing Status for Marked/Released Objects | CK_FEH_STF | CHAR | 2 | CK_STATUS | ||||
DISPO | MRP Controller (Materials Planner) | DISPO | CHAR | 3 | T024D | DISPO | DGR | HS_T024D | |
EKGRP | Purchasing Group | EKGRP | CHAR | 3 | T024 | EKGRP | EKG | ||
LABOR | Laboratory/design office | LABOR | CHAR | 3 | T024L | LABOR | |||
VAGRP | Responsible planner group/department | VAGRP | CHAR | 3 | T024A | VAGRP | H_T024A | ||
SOBSL | Special Procurement Key for the Costing Object | CK_SOBSK | CHAR | 2 | T460A | SOBSL | |||
SOBES | Special procurement type | SOBES | CHAR | 1 | SOBES | ||||
SOWRK | Special Procurement Plant - Costing | CK_SOWRK | CHAR | 4 | Assigned to domain | WERKS | |||
SODUM | Phantom item indicator | DUMPS | CHAR | 1 | XFELD | ||||
SBDKZ | Dependent requirements ind. for individual and coll. reqmts | SBDKZ | CHAR | 1 | SBDKZ | ||||
BESKZ | Procurement Type | BESKZ | CHAR | 1 | BESKZ | MBS | |||
KOSGR | Costing Overhead Group | CK_KOSGR | CHAR | 10 | Assigned to domain | CK_KOSGR | |||
ZSCHL | Costing Overhead Key | CK_ZSCHL | CHAR | 6 | CHAR6 | KKZ | |||
CUOBJ | Object Number for Conf. Objects | CK_CUOBJ | NUMC | 18 | CUOBJ | ||||
CUOBJID | Indicator for Configurable Objects | CK_CUOBJID | CHAR | 1 | CK_CUOBJID | ||||
TYPE | Configured Material (Variant) | CK_TYPE | CHAR | 18 | MARA | MATN1 | MATNR | ||
WRKLT | Plant | WERKS_D | CHAR | 4 | Assigned to domain | WERKS | WRK | H_T001W_C | |
PROZESS | Process Through Which Co-Product Was Costed | CK_PROZESS | CHAR | 18 | Assigned to domain | MATN1 | MATNR | MAT1 | |
KZKUP | Indicator: Material can be co-product | KZKUPMAT | CHAR | 1 | FLAG | ||||
FXPRU | Fixed-Price Co-Product | CK_FIXPRKU | CHAR | 1 | XFELD | ||||
PR_LOSGR | Planned lot size | LOSGR | QUAN | 13(3) | MENG13 | ||||
PR_SUMLO | Planned lot size | LOSGR | QUAN | 13(3) | MENG13 | ||||
PR_LOSAU | Lot Size Taking Scrap into Account | CK_LOSAU | QUAN | 13(3) | MENG13 | ||||
PR_MEINS | Valuation Unit of Measure | CK_MEINH_BEW | UNIT | 3 | T006 | CUNIT | MEINS | ||
PR_VERID | Production Version To Be Costed | CK_VERID | CHAR | 4 | MKAL | VERID | |||
MLMAA | Material ledger activated at material level | CK_ML_MAAC | CHAR | 1 | XFELD | ||||
ERFNM | Entered by | ERFNM | CHAR | 12 | USNAM | ||||
ROHSTOFF | Material Component | CK_ROH | CHAR | 1 | XFELD | ||||
PRCTR | Profit Center | PRCTR | CHAR | 10 | Assigned to domain | ALPHA | PRCTR | PRC | PRCTR_EMPTY |
SPART | Division | SPART | CHAR | 2 | Assigned to domain | SPART | SPA | C_SPART | |
MTART | Material Type | MTART | CHAR | 4 | T134 | MTART | MTA | ||
BALTKZ | Cost Estimate for a Procurement Alternative | CK_BALT_FLAG | CHAR | 1 | XFELD | ||||
KALNR_BA | Cost Estimate Number of Procurement Alternative | CKKALNRBA | NUMC | 12 | Assigned to domain | CK_KALNR | |||
MKALK | Mixed Costing Indicator | CK_MKALK | CHAR | 1 | XFELD | ||||
BTYP | Process Category | CKML_BTYP | CHAR | 4 | Assigned to domain | CKML_PROZESS_TYP | |||
.INCLU--AP | 0 | ||||||||
IPPE_COSTING | Costing for a Material with iPPE Quantity Structure | CK_IPPE_COSTING | CHAR | 1 | CHAR1 | ||||
CMPEXT_NONCOL | Internal Identification of the Component (Material/Product) | PVS_CMPID | CHAR | 32 | PVS_CHAR32 | ||||
CCODE | Color Supplement Key | PVS_COL_CODE | CHAR | 10 | CHAR10 | ||||
NONCOL_VERID | Production Version | VERID | CHAR | 4 | Assigned to domain | VERID | VER | ||
SUMMENSATZ | Checkbox | XFELD | CHAR | 1 | XFELD | ||||
NEZDISST | Field defined as in SY-TABIX | TABIX_D | INT4 | 10 | TABIX | ||||
NEZDISST_CYCLE | Field defined as in SY-TABIX | TABIX_D | INT4 | 10 | TABIX | ||||
FIRST_KEKO | Field defined as in SY-TABIX | TABIX_D | INT4 | 10 | TABIX | ||||
LAST_KEKO | Field defined as in SY-TABIX | TABIX_D | INT4 | 10 | TABIX | ||||
PTR_SUM | Field defined as in SY-TABIX | TABIX_D | INT4 | 10 | TABIX | ||||
SPERRKZ | Cost Estimate Locked | CK_SPERRKZ | CHAR | 1 | XFELD | ||||
LOSMA | Lot Size of Calculated Yield | CK_LOSMA | QUAN | 13(3) | MENG13 | ||||
VORGAENGER | Field defined as in SY-TABIX | TABIX_D | INT4 | 10 | TABIX | ||||
STUEAUF | Checkbox | XFELD | CHAR | 1 | XFELD | ||||
STRUNR | Structure Number for Associated Costing Structure | CK_STRUNR | NUMC | 12 | CK_STRUNR | ||||
MNGLG | Lot Size for Product Costing | CK_LOSGR | QUAN | 13(3) | MENG13 | ||||
SBDKZ_KOPF | Dependent requirements ind. for individual and coll. reqmts | SBDKZ | CHAR | 1 | SBDKZ | ||||
KALNR_TOP | Cost Estimate Number - Product Costing | CK_KALNR1 | NUMC | 12 | Assigned to domain | CK_KALNR | KNE | ||
STLKN | BOM item node number | STLKN | NUMC | 8 | KNTNR | ||||
BEZWISSEN | Checkbox | XFELD | CHAR | 1 | XFELD | ||||
INP_IN_PROC | Process Through Which Co-Product Was Costed | CK_PROZESS | CHAR | 18 | Assigned to domain | MATN1 | MATNR | MAT1 | |
PATNR | Partner number for costing | NKPRTN | NUMC | 6 | NUM6 | ||||
AUSID | Assembly/Operation Scrap Included | CK_AUSID | CHAR | 1 | CK_AUSID | ||||
CFXPR | Cost Estimate Contains Fixed-Price Co-Products | CK_CONTFIXPRICE | CHAR | 1 | FLAG | ||||
CSPLIT | Apportionment Structure | CSPLIT | CHAR | 4 | MAKV | CSPLIT | |||
ZIFFR | Equivalence Number | CK_ZIFFR | DEC | 3 | AEQUI | ||||
SUMZIFFR | Sum of Equivalence Numbers of Co-Products for a Process | CK_SUMZIFFR | DEC | 5 | CK_SUMZIFFR | ||||
SCNAM | Structure | CO_SCNAM | CHAR | 2 | Assigned to domain | ALPHA | CO_SCNAM | ||
AFAKT | Costg.: Apportionment Factor for Itemiz. Line in Joint Prod. | CK_SPLITFAC | FLTP | 16(16) | CK_FLTP | ||||
DBREAD | New Input Values | XFLAG | CHAR | 1 | XFLAG | ||||
SELKZ | Indicator for Relevancy to Costing | CK_SELKZ | CHAR | 1 | Assigned to domain | CK_SELKZ | |||
LOSGR_INPUT | Indicator for Relevancy to Costing | CK_SELKZ | CHAR | 1 | Assigned to domain | CK_SELKZ | |||
PEINH | Price Unit | PEINH | DEC | 5 | PACK3 | ||||
BALT_INPUT | New Input Values | XFLAG | CHAR | 1 | XFLAG | ||||
OTYP | Object Type | CKML_OTYP | CHAR | 2 | CKML_OTYP | ||||
NO_UNITCOSTING | New Input Values | XFLAG | CHAR | 1 | XFLAG | ||||
KZEFF | Assign effectivity parameter values/ override change numbers | CC_MTEFF | CHAR | 1 | XFELD | ||||
MAXMSGTYP | Maximum Message Type of Executed Action | CK_MAXMSGTYP | CHAR | 1 | SYCHAR01 | ||||
MISCH_VERH | Mixing Ratio | CK_CROSSR | DEC | 13(3) | DEC10_3 | ||||
MGTYP | Quantity Structure Type | CKML_MGTYP | CHAR | 5 | Assigned to domain | CKML_MGTYP | CKML_MGTYP | ||
BWVAR_BA | Valuation Variant in Costing | CK_BWVAR | CHAR | 3 | Assigned to domain | CK_BWVAR | BWV | ||
PLSCN | Planning Scenario of Long-Term Planning | PLSCN | NUMC | 3 | Assigned to domain | PLSCN | PLS | ||
PLMNG | Production Plan Quantity Transferred to the Cost Estimate | CKI_PLMNG | QUAN | 15(3) | MENGV8 | ||||
.INCLU--AP | 0 | ||||||||
CLINT | Internal Class Number | CLINT | NUMC | 10 | Assigned to domain | CLINT | |||
PPEGUID | Internal Identification for PVS Objects | PVS_GUID | RAW | 16 | SYSUUID | ||||
OTYPE | iPPE Object Type | PVS_OTYPE | CHAR | 1 | PVS_OTYPE | ||||
APPLOBJ_TYPE | Application Object Type for iPPE | PVS_APPLOBJ_TYPE | CHAR | 4 | PVS_APPLOBJ_TYPE | ||||
AENNR | Change Number | AENNR | CHAR | 12 | Assigned to domain | AENNR | AENNR | AEN |
Key field | Non-key field |
How do I retrieve data from SAP structure CKKVMK using ABAP code?
As CKKVMK is a database structure and not a table it does not store any data in the SAP data dictionary. The ABAP SELECT statement is therefore not appropriate and can not be performed on CKKVMK as there is no data to select.How to access SAP table CKKVMK
Within an ECC or HANA version of SAP you can also view further information about CKKVMK and the data within it using relevant transactions such asSE11 (ABAP Dictionary Maintenance)
SM30 (Maintain Table Data)
SE80 (Object Navigator)
SE16 (Data Browser).
Search for further information about these or an SAP related objects