BAPI_PP_CONFIRM SAP (Production Order Confirmation) Structure details

Dictionary Type: Structure
Description: Production Order Confirmation




ABAP Code to SELECT data from BAPI_PP_CONFIRM
Related tables to BAPI_PP_CONFIRM
Access table BAPI_PP_CONFIRM




Structure field list including key, data, relationships and ABAP select examples

BAPI_PP_CONFIRM is a standard SAP Structure so does not store data like a database table does. It can be used to define the fields of other actual tables or to process "Production Order Confirmation" Information within sap ABAP programs.

This is done by declaring abap internal tables, work areas or database tables based on this Structure. These can then be used to store and process the required data appropriately.

i.e. DATA: wa_BAPI_PP_CONFIRM TYPE BAPI_PP_CONFIRM.

The BAPI_PP_CONFIRM table consists of various fields, each holding specific information or linking keys about Production Order Confirmation data available in SAP. These include CONF_CNT (Confirmation counter), ORDERID (Order Number), SEQUENCE (Sequence), OPERATION (Operation/Activity Number).. See below for full list along with technical details, documentation, text table, check tables, foreign key relationships, conversion routines, relevant tcodes and example ABAP select code etc. .

Delivery Class:
Display/Maintenance via tcode SM30: Display/Maintenance Allowed but with Restrictions
SAP enhancement categories: Can be enhanced (character-type or numeric)


SAP BAPI_PP_CONFIRM structure fields - Full list of fields found in SAP data dictionary

Field Description Data Element Data Type length (Dec) Check table Conversion Routine Domain Name MemoryID SHLP
CONF_NOCompletion confirmation number for the operation CO_RUECKNUMC10CO_RUECKRCK
CONF_CNTConfirmation counter CO_RMZHLNUMC8CIM_COUNTRZL
ORDERIDOrder Number AUFNRCHAR12AUFKALPHAAUFNRANR
SEQUENCESequence PLNFOLGECHAR6ALPHAPLNFOLGE
OPERATIONOperation/Activity Number VORNRCHAR4NUMCVVORNRVGN
SUB_OPERSuboperation UVORNCHAR4NUMCVVORNR
CAPA_CATEGORYCapacity category KAPARTCHAR3TC26KAPARTCAA
SPLITSplit number CY_SPLITINT13INT1
CREATED_BYName of Person who Created the Object ERNAMCHAR12USNAM
CREATED_DATECreated On ERSDADATS8DATUM
CREATED_TIMEEntry time ERZETTIMS6UZEIT
CR_BY_APPLOrigin Indicator of PDC Message (Application) ORINDCHAR1ORIND
ORIGINOrigin Indicator of PDC Message ORIGFCHAR1ORIGF
CREATE_MODEIndicator for type of confirmation MANURCHAR1MANUR
CR_BY_MILESTIndicator: Milestone confirmation carried out MEILRCHAR1MEILR
CONF_NO_MILESTCompletion confirmation number for the operation CO_RUECKNUMC10CO_RUECKRCK
CONF_CNT_MILESTConfirmation counter CO_RMZHLNUMC8CIM_COUNTRZL
REVERSEDIndicator: Document Has Been Reversed CO_STOKZCHAR1FLAG
REV_CONF_CNTConfirmation counter of cancelled confirmation CO_STZHLNUMC8CIM_COUNT
FIN_CONFPartial/Final Confirmation AUERU_VSCHAR1AUERU_VS
CLEAR_RESClear Open Reservations AUSBUCHAR1XFELD
POSTG_DATEPosting date BUCHDATUMDATS8DATUM
DEV_REASONReason for Variance CO_AGRNDCHAR4TRUGCO_AGRND
DEV_REAS_TXTText describing the reason for a variance in a confirmation CO_GRDTXCHAR30TEXT30
CONF_TEXTConfirmation text CO_RTEXTCHAR40TEXT40
EX_CREATED_BYExternal creator of confirmation RU_EXNAMCHAR12USNAM
EX_CREATED_DATEExternal date of entry for confirmation RU_EXERDDATS8DATUM
EX_CREATED_TIMEExternal time of entry for confirmation RU_EXERZTIMS6UZEIT
CONF_QUAN_UNITConfirmation unit of measure RU_VORMEUNIT3T006CUNITMEINS
CONF_QUAN_UNIT_ISOISO code for unit of measurement ISOCD_UNITCHAR3T006IISOCD_UNIT
YIELDYield to Be Confirmed RU_LMNGAQUAN13(3) MENGV13
SCRAPScrap to Be Confirmed RU_XMNGAQUAN13(3) MENGV13
REWORKCurrent rework quantity to be confirmed RU_RMNGAQUAN13(3) MENGV13
EXEC_START_DATEConfirmed date for start of execution RU_ISDDDATS8DATUM
EXEC_START_TIMEConfirmed time for 'Execution start' RU_ISDZTIMS6ATIME
SETUP_FIN_DATEConfirmed date for 'Setup finish' RU_IERDDATS8DATUM
SETUP_FIN_TIMEConfirmed time for 'Setup finish' RU_IERZTIMS6ATIME
PROC_START_DATEConfirmed date for 'Processing start' RU_ISBDDATS8DATUM
PROC_START_TIMEConfirmed time for 'Processing start' RU_ISBZTIMS6ATIME
PROC_FIN_DATEConfirmed date for 'processing finish' RU_IEBDDATS8DATUM
PROC_FIN_TIMEConfirmed time for 'processing finish' RU_IEBZTIMS6ATIME
TEARDOWN_START_DATEConfirmed date for 'teardown start' RU_ISADDATS8DATUM
TEARDOWN_START_TIMEConfirmed time for 'teardown start' RU_ISAZTIMS6ATIME
EXEC_FIN_DATEConfirmed date for execution finish RU_IEDDDATS8DATUMEDR
EXEC_FIN_TIMEConfirmed time for 'Execution finish' RU_IEDZTIMS6ATIMEEZR
FCST_FIN_DATEForecast finish date of operation from confirmation CO_PEDDDATS8DATUM
FCST_FIN_TIMEForecast finish time of operation from confirmation CO_PEDZTIMS6ATIME
PLANTPlant WERKS_DCHAR4T001WWERKSWRKH_T001W_C
WORK_CNTRWork center ARBPLCHAR8ARBPLAGR
COSTCENTERCost Center KOSTLCHAR10CSKSALPHAKOSTLKOS
CO_AREAControlling Area KOKRSCHAR4TKA01CACCDCAC
RECORDTYPERecord type for confirmation CO_SATZACHAR3CO_SATZA
LOGDATELogical Date LDATEDATS8DATUM
LOGTIMELogical time LTIMETIMS6UZEIT
CONF_ACTI_UNIT1Unit of measure for the activity to be confirmed CO_ISMNGEHUNIT3T006CUNITMEINS
CONF_ACTI_UNIT1_ISOISO code for unit of measurement ISOCD_UNITCHAR3T006IISOCD_UNIT
CONF_ACTIVITY1Activity Currently to be Confirmed RU_ISMNGQUAN13(3) MENGV13
NO_REMN_ACTI1Indicator: No remaining activity expected CO_LEIKZCHAR1XFELD
CONF_ACTI_UNIT2Unit of measure for the activity to be confirmed CO_ISMNGEHUNIT3T006CUNITMEINS
CONF_ACTI_UNIT2_ISOISO code for unit of measurement ISOCD_UNITCHAR3T006IISOCD_UNIT
CONF_ACTIVITY2Activity Currently to be Confirmed RU_ISMNGQUAN13(3) MENGV13
NO_REMN_ACTI2Indicator: No remaining activity expected CO_LEIKZCHAR1XFELD
CONF_ACTI_UNIT3Unit of measure for the activity to be confirmed CO_ISMNGEHUNIT3T006CUNITMEINS
CONF_ACTI_UNIT3_ISOISO code for unit of measurement ISOCD_UNITCHAR3T006IISOCD_UNIT
CONF_ACTIVITY3Activity Currently to be Confirmed RU_ISMNGQUAN13(3) MENGV13
NO_REMN_ACTI3Indicator: No remaining activity expected CO_LEIKZCHAR1XFELD
CONF_ACTI_UNIT4Unit of measure for the activity to be confirmed CO_ISMNGEHUNIT3T006CUNITMEINS
CONF_ACTI_UNIT4_ISOISO code for unit of measurement ISOCD_UNITCHAR3T006IISOCD_UNIT
CONF_ACTIVITY4Activity Currently to be Confirmed RU_ISMNGQUAN13(3) MENGV13
NO_REMN_ACTI4Indicator: No remaining activity expected CO_LEIKZCHAR1XFELD
CONF_ACTI_UNIT5Unit of measure for the activity to be confirmed CO_ISMNGEHUNIT3T006CUNITMEINS
CONF_ACTI_UNIT5_ISOISO code for unit of measurement ISOCD_UNITCHAR3T006IISOCD_UNIT
CONF_ACTIVITY5Activity Currently to be Confirmed RU_ISMNGQUAN13(3) MENGV13
NO_REMN_ACTI5Indicator: No remaining activity expected CO_LEIKZCHAR1XFELD
CONF_ACTI_UNIT6Unit of measure for the activity to be confirmed CO_ISMNGEHUNIT3T006CUNITMEINS
CONF_ACTI_UNIT6_ISOISO code for unit of measurement ISOCD_UNITCHAR3T006IISOCD_UNIT
CONF_ACTIVITY6Activity Currently to be Confirmed RU_ISMNGQUAN13(3) MENGV13
NO_REMN_ACTI6Indicator: No remaining activity expected CO_LEIKZCHAR1XFELD
CONF_BUS_PROC_UNIT1Unit of measurement for conf. quantity for business process RU_IPRZEUNIT3Assigned to domainCUNITMEINS
CONF_BUS_PROC_UNIT1_ISOISO code for unit of measurement ISOCD_UNITCHAR3T006IISOCD_UNIT
CONF_BUSS_PROC1Current quantity to be confirmed for the business process RU_IPRZSQUAN13(3) MENGV13
NO_REMN_BUS_PROC1No remaining quantity expected for business process RU_IPRZKCHAR1XFELD
PROCSS_DEGConfirmation: Degree of processing CO_ABARBNUMC3CO_ABARB
STD_UNIT1Unit of measure for the standard value VGWRTEHUNIT3T006CUNITMEINS
STD_UNIT1_ISOISO code for unit of measurement ISOCD_UNITCHAR3T006IISOCD_UNIT
FORCAST_STD_VAL1Forecast value used to update the standard value CO_SCHAETZQUAN9(3) VGWRT
STD_UNIT2Unit of measure for the standard value VGWRTEHUNIT3T006CUNITMEINS
STD_UNIT2_ISOISO code for unit of measurement ISOCD_UNITCHAR3T006IISOCD_UNIT
FORCAST_STD_VAL2Forecast value used to update the standard value CO_SCHAETZQUAN9(3) VGWRT
STD_UNIT3Unit of measure for the standard value VGWRTEHUNIT3T006CUNITMEINS
STD_UNIT3_ISOISO code for unit of measurement ISOCD_UNITCHAR3T006IISOCD_UNIT
FORCAST_STD_VAL3Forecast value used to update the standard value CO_SCHAETZQUAN9(3) VGWRT
STD_UNIT4Unit of measure for the standard value VGWRTEHUNIT3T006CUNITMEINS
STD_UNIT4_ISOISO code for unit of measurement ISOCD_UNITCHAR3T006IISOCD_UNIT
FORCAST_STD_VAL4Forecast value used to update the standard value CO_SCHAETZQUAN9(3) VGWRT
STD_UNIT5Unit of measure for the standard value VGWRTEHUNIT3T006CUNITMEINS
STD_UNIT5_ISOISO code for unit of measurement ISOCD_UNITCHAR3T006IISOCD_UNIT
FORCAST_STD_VAL5Forecast value used to update the standard value CO_SCHAETZQUAN9(3) VGWRT
STD_UNIT6Unit of measure for the standard value VGWRTEHUNIT3T006CUNITMEINS
STD_UNIT6_ISOISO code for unit of measurement ISOCD_UNITCHAR3T006IISOCD_UNIT
FORCAST_STD_VAL6Forecast value used to update the standard value CO_SCHAETZQUAN9(3) VGWRT
FORCAST_BUS_PROC_UNIT1Unit for remaining quantity of business process OPRE1UNIT3T006CUNITMEINS
FORCAST_BUS_PROC_UNIT1_ISOISO code for unit of measurement ISOCD_UNITCHAR3T006IISOCD_UNIT
FORCAST_BUS_PROC_VAL1Remaining quantity for business process OPRZ1QUAN13(3) MENGV13
PERS_NOPersonnel number CO_PERNRNUMC8PERNRPER
NAMEName of employee RU_NAMECHAR40TEXT40
TIMEID_NOTime Recording ID Number DZAUSWNUMC8ZAUSW
WAGETYPEWage Type LOHNARTCHAR4LOART
SUITABILITYSuitability QUALFCHAR2T423QUALF
NO_OF_EMPLNumber of employees ANZMSDEC5(2) ANZMA
WAGEGROUPWage group LOHNGRPCHAR3T421LOHNGRP
BREAK_UNITUnit for the break time DZEIERUNIT3T006CUNITMEINS
BREAK_UNIT_ISOISO code for unit of measurement ISOCD_UNITCHAR3T006IISOCD_UNIT
BREAK_TIMEConfirmed break time ISERHQUAN9(3) VGWRT
EX_IDENTExternal key of a confirmation (for example from PDC system) RU_EXTID_CHARCHAR32SYSUUID_C
WIP_MATERIALMaterial of WIP Batch CO_WIPBMATCHAR18Assigned to domainMATN1MATNR
WIP_BATCHWIP Batch CO_WIPBBATCHCHAR10Assigned to domainCHARG

Key field Non-key field



How do I retrieve data from SAP structure BAPI_PP_CONFIRM using ABAP code?

As BAPI_PP_CONFIRM is a database structure and not a table it does not store any data in the SAP data dictionary. The ABAP SELECT statement is therefore not appropriate and can not be performed on BAPI_PP_CONFIRM as there is no data to select.

How to access SAP table BAPI_PP_CONFIRM

Within an ECC or HANA version of SAP you can also view further information about BAPI_PP_CONFIRM and the data within it using relevant transactions such as

SE11 (ABAP Dictionary Maintenance)
SM30 (Maintain Table Data)
SE80 (Object Navigator)
SE16 (Data Browser).


Search for further information about these or an SAP related objects



Comments on this SAP object

What made you want to lookup this SAP object? Please tell us what you were looking for and anything you would like to be included on this page!