BAPI_BUS2002_ACT_CHG SAP (Data Structure: Change Network Activity) Structure details

Dictionary Type: Structure
Description: Data Structure: Change Network Activity




ABAP Code to SELECT data from BAPI_BUS2002_ACT_CHG
Related tables to BAPI_BUS2002_ACT_CHG
Access table BAPI_BUS2002_ACT_CHG




Structure field list including key, data, relationships and ABAP select examples

BAPI_BUS2002_ACT_CHG is a standard SAP Structure so does not store data like a database table does. It can be used to define the fields of other actual tables or to process "Data Structure: Change Network Activity" Information within sap ABAP programs.

This is done by declaring abap internal tables, work areas or database tables based on this Structure. These can then be used to store and process the required data appropriately.

i.e. DATA: wa_BAPI_BUS2002_ACT_CHG TYPE BAPI_BUS2002_ACT_CHG.

The BAPI_BUS2002_ACT_CHG table consists of various fields, each holding specific information or linking keys about Data Structure: Change Network Activity data available in SAP. These include CONTROL_KEY (Control key), PLANT (Plant), WORK_CNTR (Work center), DESCRIPTION (Operation short text).. See below for full list along with technical details, documentation, text table, check tables, foreign key relationships, conversion routines, relevant tcodes and example ABAP select code etc. .

Delivery Class:
Display/Maintenance via tcode SM30: Display/Maintenance Allowed but with Restrictions
SAP enhancement categories: Not classified


SAP BAPI_BUS2002_ACT_CHG structure fields - Full list of fields found in SAP data dictionary

Field Description Data Element Data Type length (Dec) Check table Conversion Routine Domain Name MemoryID SHLP
ACTIVITYActivity number in network and standard network CN_VORNRCHAR4NUMCVVORNR
CONTROL_KEYControl key STEUSCHAR4Assigned to domainSTEUS
PLANTPlant WERKS_DCHAR4Assigned to domainWERKSWRKH_T001W_C
WORK_CNTRWork center ARBPLCHAR8ARBPLAGR
DESCRIPTIONOperation short text LTXA1CHAR40TEXT40
WBS_ELEMENTWork Breakdown Structure Element (WBS Element) PS_POSIDCHAR24PROJNPS_POSIDPRO
WORK_ACTIVITYWork involved in the activity ARBEITQUAN7(1) ARBEIT
UN_WORKUnit for work ARBEITEUNIT3Assigned to domainCUNITMEINS
UN_WORK_ISOISO code for unit of measurement ISOCD_UNITCHAR3Assigned to domainISOCD_UNIT
CALCULATION_KEYKey for calculation INDETCHAR1INDET
ACTTYPEActivity Type LSTARCHAR6Assigned to domainLSTARLARLART_EMPTY
PRIORITYPriority NW_PRIOCHAR1Assigned to domainNW_PRIO
MILESTONEUsage MILESTONECHAR5Assigned to domainMILESTONE
DISTRIBUTION_KEYDistr.cap.reqmts (plant maint.,process order, network) CR_VERTNCHAR8Assigned to domainCR_VERTL
NUMBER_OF_CAPACITIESNumber of capacities required ANZKAPINT13INT1
PERCENT_OF_WORKWork percentage APROZENTINT13INT1
EXEC_FACTORExecution Factor AFAKTDEC3AFAKT
STD_TEXT_KEYStandard text key KTSCHCHAR7Assigned to domainKTSCH
DURATION_NORMALNormal duration of the activity DAUNORQUAN5(1) DAUER_4_1
DURATION_NORMAL_UNITNormal duration/unit DAUNOREUNIT3Assigned to domainCUNITMEINS
DURATION_NORMAL_UNIT_ISOISO code for unit of measurement ISOCD_UNITCHAR3Assigned to domainISOCD_UNIT
DURATION_MINIMUMMinimum activity duration DAUMINQUAN5(1) DAUER_4_1
DURATION_MINIMUM_UNITUnit for the minimum duration DAUMINEUNIT3Assigned to domainCUNITMEINS
DURATION_MINIMUM_UNIT_ISOISO code for unit of measurement ISOCD_UNITCHAR3Assigned to domainISOCD_UNIT
FLEXIBLE_DURATIONIndicator: flexible duration DAUDEHNCHAR1X
FACTORY_CALENDARFactory Calendar WFCIDCHAR2Assigned to domainWFCIDFCI
REDUCTION_STRATEGYReduction strategy per operation/activity RSTRACHAR2Assigned to domainRSTRA
INFO_RECNumber of Purchasing Info Record INFNRCHAR10Assigned to domainALPHAINFNRINFMEIN_C
VENDOR_NOAccount Number of Vendor or Creditor LIFNRCHAR10Assigned to domainALPHALIFNRLIFKRED_C
PURCH_ORGPurchasing Organization EKORGCHAR4Assigned to domainEKORGEKO
PUR_GROUPPurchasing Group EKGRPCHAR3Assigned to domainEKGRPEKG
MATL_GROUPMaterial Group MATKLCHAR9Assigned to domainMATKLMKLS_WBWG
AGREEMENTNumber of Principal Purchase Agreement KONNRCHAR10Assigned to domainALPHAEBELNKTR
AGMT_ITEMItem Number of Principal Purchase Agreement KTPNRNUMC5Assigned to domainEBELP
PRICEPrice PREISCURR11(2) WERT11
PRICE_UNITPrice Unit PEINHDEC5PACK3
CURRENCYCurrency Key WAERSCUKY5Assigned to domainWAERSFWS
CURRENCY_ISOISO currency code ISOCDCHAR3ISOCD
COST_ELEMCost Element KSTARCHAR10Assigned to domainALPHAKSTARKAT
PUR_INFO_RECORD_DATA_FIXEDIndicator: Purchasing info record data are fixed CN_KZFIXCHAR1XFELD
PLND_DELRYPlanned Delivery Time in Days PLIFZDEC3DEC3
OPERATION_QTYOperation quantity in order unit of measure CX_LOSVGQUAN13(3) MENG13
OPERATION_MEASURE_UNITUnit of Measure for Activity/Operation VORMEUNIT3Assigned to domainCUNITMEINS
OPERATION_MEASURE_UNIT_ISOISO code for unit of measurement ISOCD_UNITCHAR3Assigned to domainISOCD_UNIT
NOT_MRP_APPLICABLEInd: Reserv. not applicable to MRP;Purc. req. not created NODISPCHAR1XFELD
SORTED_BYSort Term for Non-Stock Info Records SORTICHAR10CHAR10
PREQ_NAMEName of Requisitioner/Requester AFNAMCHAR12AFNAM
GR_RCPTGoods Recipient/Ship-To Party WEMPFCHAR12WEMPF
TRACKINGNORequirement Tracking Number BEDNRCHAR10CHAR10
UNLOAD_PTUnloading Point ABLADCHAR25TEXT25
CONSTRAINT_TYPE_STARTConstraint on the basic start date for the activity EINSCHRACHAR1RESTRIKSTR
CONSTRAINT_TYPE_FINISHConstraint on the finish date of the activity EINSCHRECHAR1RESTRIKEND
CONSTRAINT_START_DATEConstraint for activity start (Basic) VORGABESTDDATS8VORGABESTR
CONSTRAINT_START_TIMEConstraint for activity start time (Basic) VORGABESTZTIMS6ATIME
CONSTRAINT_FINISH_DATEConstraint for finish of activity (Basic) VORGABEENDDATS8VORGABEEND
CONSTRAINT_FINISH_TIMEBasic finish time of the activity VORGABEENZTIMS6ATIME
CONSTRAINT_TYPE_FINISH_FCForecast date constraint on activity finish PS_RESTECHAR1RESTRIKEND
CONSTRAINT_TYPE_START_FCForecast date constraint on activity start PS_RESTACHAR1RESTRIKSTR
CONSTRAINT_START_DATE_FCForecasted start date for the activity EWSTARTDDATS8DATUM
CONSTRAINT_START_TIME_FCForecast start time of the activity EWSTARTZTIMS6ATIME
CONSTRAINT_FINISH_DATE_FCForecast finish date EWENDEDDATS8DATUM
CONSTRAINT_FINISH_TIME_FCForecast finish time for the activity EWENDEZTIMS6ATIME
BUS_AREABusiness Area GSBERCHAR4Assigned to domainGSBERGSB
PROFIT_CTRProfit Center PRCTRCHAR10Assigned to domainALPHAPRCTRPRCPRCTR_EMPTY
CHANGE_NOChange Number AENNRCHAR12Assigned to domainAENNRAENNRAEN
REFERENCE_POINTReference point for BOM transfer CN_RFPNTCHAR20Assigned to domainCN_RFPNT
CSTG_SHEETCosting Sheet AUFKALSMCHAR6Assigned to domainKALSM
OVERHEAD_KEYOverhead key AUFZSCHLCHAR6CHAR6
TAXJURCODETax Jurisdiction TXJCDCHAR15Assigned to domainTXJCDTXJ
OBJECTCLASSObject class, language-dependent SCOPE_LDCHAR5CHAR5
ACTIVITY_COSTSCosts in the activity PRKSTCURR11(2) PRKST
PROJECT_SUMMARIZATIONInd.: Take Activity Into Account for Project Summarization CLASFCHAR1XFELD
REQ_COST_CENTERRequesting cost center ANFKOCHAR10Assigned to domainALPHAKOSTL
EARLY_START_DATEEarliest scheduled start: Execution (date) FSAVDDATS8DATUM
EARLY_START_TIMEEarliest scheduled start: Execution (time) FSAVZTIMS6ATIME
EARLY_FINISH_DATEEarliest scheduled finish: Execution (date) FSEDDDATS8DATUM
EARLY_FINISH_TIMEEarliest scheduled finish: Execution (time) FSEDZTIMS6ATIME
LATEST_START_DATELatest scheduled start: Execution (date) SSAVDDATS8DATUM
LATEST_START_TIMELatest scheduled start: Execution (time) SSAVZTIMS6ATIME
LATEST_FINISH_DATELatest scheduled finish: Execution (date) SSEDDDATS8DATUM
LATEST_FINISH_TIMELatest scheduled finish: Execution (time) SSEDZTIMS6ATIME
FLOAT_FREEFree float PUFFR_FREIDEC3PUFFER
FLOAT_TOTALTotal float PUFFR_GESMDEC3PUFFER
USER_FIELD_KEYKey word ID for user-defined fields SLWIDCHAR7Assigned to domainSLWID
USER_FIELD_CHAR20_1User field with 20 characters USRCHAR20CHAR20USRCHAR20
USER_FIELD_CHAR20_2User field with 20 characters USRCHAR20CHAR20USRCHAR20
USER_FIELD_CHAR10_1User field with 10 characters USRCHAR10CHAR10USRCHAR10
USER_FIELD_CHAR10_2User field with 10 characters USRCHAR10CHAR10USRCHAR10
USER_FIELD_QUAN1User field for quantity (length 10.3) USRQUAN13QUAN13(3) USRQUAN13
USER_FIELD_UNIT1User field: Unit for quantity fields USRUNITUNIT3Assigned to domainCUNITMEINS
USER_FIELD_UNIT1_ISOISO code for unit of measurement ISOCD_UNITCHAR3Assigned to domainISOCD_UNIT
USER_FIELD_QUAN2User field for quantity (length 10.3) USRQUAN13QUAN13(3) USRQUAN13
USER_FIELD_UNIT2User field: Unit for quantity fields USRUNITUNIT3Assigned to domainCUNITMEINS
USER_FIELD_UNIT2_ISOISO code for unit of measurement ISOCD_UNITCHAR3Assigned to domainISOCD_UNIT
USER_FIELD_CURR1User-defined field for values (length 10,3) USRCURR13CURR13(3) USRCURR13
USER_FIELD_CUKY1User field: Unit for value fields USRCUKYCUKY5Assigned to domainWAERS
USER_FIELD_CUKY1_ISOISO currency code ISOCDCHAR3ISOCD
USER_FIELD_CURR2User-defined field for values (length 10,3) USRCURR13CURR13(3) USRCURR13
USER_FIELD_CUKY2User field: Unit for value fields USRCUKYCUKY5Assigned to domainWAERS
USER_FIELD_CUKY2_ISOISO currency code ISOCDCHAR3ISOCD
USER_FIELD_DATE1User field for date USRDATEDATS8USRDATE
USER_FIELD_DATE2User field for date USRDATEDATS8USRDATE
USER_FIELD_FLAG1User-defined field: Indicator for reports USRFLAGCHAR1FLAG
USER_FIELD_FLAG2User-defined field: Indicator for reports USRFLAGCHAR1FLAG
DURATION_NORMAL_FCNormal duration (from forecast) of activity EWDANQUAN5(1) DAUER_4_1
DURATION_NORMAL_FC_UNITUnit for forecast normal duration EWDNEUNIT3Assigned to domainCUNITMEINS
DURATION_NORMAL_FC_UNIT_ISOISO code for unit of measurement ISOCD_UNITCHAR3Assigned to domainISOCD_UNIT
DURATION_MINIMUM_FCMinimum duration (from forecast) for activity EWDAMQUAN5(1) DAUER_4_1
DURATION_MINIMUM_FC_UNITUnit for forecast minimum duration EWDMEUNIT3Assigned to domainCUNITMEINS
DURATION_MINIMUM_FC_UNIT_ISOISO code for unit of measurement ISOCD_UNITCHAR3Assigned to domainISOCD_UNIT
EARLY_START_DATE_FCEarliest scheduled start date (forecast) FPAVDDATS8DATUM
EARLY_START_TIME_FCEarliest scheduled start time (forecast) FPAVZTIMS6ATIME
EARLY_FINISH_DATE_FCEarliest scheduled finish date (forecast) FPEDDDATS8DATUM
EARLY_FINISH_TIME_FCEarliest scheduled finish time (forecast) FPEDZTIMS6ATIME
LATEST_START_DATE_FCLatest scheduled start date (forecast) SPAVDDATS8DATUM
LATEST_START_TIME_FCLatest scheduled start time (forecast) SPAVZTIMS6ATIME
LATEST_FINISH_DATE_FCLatest scheduled finish date (forecast) SPEDDDATS8DATUM
LATEST_FINISH_TIME_FCLatest scheduled finish time (forecast) SPEDZTIMS6ATIME
FLOAT_FREE_FCFree float (from forecast) PPUFF_FREIDEC3PUFFER
FLOAT_TOTAL_FCTotal float (from forecast) PPUFF_GESMDEC3PUFFER
FUNC_AREAFunctional Area FKBERCHAR16Assigned to domainFKBERFBE

Key field Non-key field



How do I retrieve data from SAP structure BAPI_BUS2002_ACT_CHG using ABAP code?

As BAPI_BUS2002_ACT_CHG is a database structure and not a table it does not store any data in the SAP data dictionary. The ABAP SELECT statement is therefore not appropriate and can not be performed on BAPI_BUS2002_ACT_CHG as there is no data to select.

How to access SAP table BAPI_BUS2002_ACT_CHG

Within an ECC or HANA version of SAP you can also view further information about BAPI_BUS2002_ACT_CHG and the data within it using relevant transactions such as

SE11 (ABAP Dictionary Maintenance)
SM30 (Maintain Table Data)
SE80 (Object Navigator)
SE16 (Data Browser).


Search for further information about these or an SAP related objects



Comments on this SAP object

What made you want to lookup this SAP object? Please tell us what you were looking for and anything you would like to be included on this page!