AFRU_WIPB_RT SAP (Runtime Structure for WIP Batches) Structure details
Description: Runtime Structure for WIP Batches
Structure field list including key, data, relationships and ABAP select examples
AFRU_WIPB_RT is a standard SAP Structure so does not store data like a database table does. It can be used to define the fields of other actual tables or to process "Runtime Structure for WIP Batches" Information within sap ABAP programs.
This is done by declaring abap internal tables, work areas or database tables based on this Structure. These can then be used to store and process the required data appropriately.
i.e. DATA: wa_AFRU_WIPB_RT TYPE AFRU_WIPB_RT.
The AFRU_WIPB_RT table consists of various fields, each holding specific information or linking keys about Runtime Structure for WIP Batches data available in SAP. These include MANDT (Client), RUECK (Completion confirmation number for the operation), RMZHL (Confirmation counter), ERSDA (Confirmation entry date).. See below for full list along with technical details, documentation, text table, check tables, foreign key relationships, conversion routines, relevant tcodes and example ABAP select code etc. .
Delivery Class:Display/Maintenance via tcode SM30: Display/Maintenance Allowed but with Restrictions
SAP enhancement categories: Can be enhanced (character-type or numeric)
SAP AFRU_WIPB_RT structure fields - Full list of fields found in SAP data dictionary
Field | Description | Data Element | Data Type | length (Dec) | Check table | Conversion Routine | Domain Name | MemoryID | SHLP |
TC_MARK | Character Field Length 1 | CHAR01 | CHAR | 1 | CHAR1 | ||||
MANDT | Client | MANDT | CLNT | 3 | T000 | MANDT | |||
RUECK | Completion confirmation number for the operation | CO_RUECK | NUMC | 10 | CO_RUECK | RCK | |||
RMZHL | Confirmation counter | CO_RMZHL | NUMC | 8 | CIM_COUNT | RZL | |||
ERSDA | Confirmation entry date | RU_ERSDA | DATS | 8 | DATUM | ||||
ERNAM | Name of the person who entered the confirmation | RU_ERNAM | CHAR | 12 | USNAM | ||||
LAEDA | Date of Last Change | LAEDA | DATS | 8 | DATUM | ||||
AENAM | Name of Person Who Changed Object | AENAM | CHAR | 12 | USNAM | ||||
BUDAT | Posting date | BUCHDATUM | DATS | 8 | DATUM | ||||
ARBID | Object ID | OBJEKTID | NUMC | 8 | NUM08 | PON | |||
WERKS | Plant | WERKS_D | CHAR | 4 | T001W | WERKS | WRK | H_T001W_C | |
LTXA1 | Confirmation text | CO_RTEXT | CHAR | 40 | TEXT40 | ||||
TXTSP | Language Key | SPRAS | LANG | 1 | T002 | ISOLA | SPRAS | SPR | H_T002 |
ISERH | Confirmed break time | ISERH | QUAN | 9(3) | VGWRT | ||||
ZEIER | Unit for the break time | DZEIER | UNIT | 3 | T006 | CUNIT | MEINS | ||
ILE01 | Unit of measure for the activity to be confirmed | CO_ISMNGEH | UNIT | 3 | T006 | CUNIT | MEINS | ||
ISM01 | Activity Currently to be Confirmed | RU_ISMNG | QUAN | 13(3) | MENGV13 | ||||
ILE02 | Unit of measure for the activity to be confirmed | CO_ISMNGEH | UNIT | 3 | T006 | CUNIT | MEINS | ||
ISM02 | Activity Currently to be Confirmed | RU_ISMNG | QUAN | 13(3) | MENGV13 | ||||
ILE03 | Unit of measure for the activity to be confirmed | CO_ISMNGEH | UNIT | 3 | T006 | CUNIT | MEINS | ||
ISM03 | Activity Currently to be Confirmed | RU_ISMNG | QUAN | 13(3) | MENGV13 | ||||
ILE04 | Unit of measure for the activity to be confirmed | CO_ISMNGEH | UNIT | 3 | T006 | CUNIT | MEINS | ||
ISM04 | Activity Currently to be Confirmed | RU_ISMNG | QUAN | 13(3) | MENGV13 | ||||
ILE05 | Unit of measure for the activity to be confirmed | CO_ISMNGEH | UNIT | 3 | T006 | CUNIT | MEINS | ||
ISM05 | Activity Currently to be Confirmed | RU_ISMNG | QUAN | 13(3) | MENGV13 | ||||
ILE06 | Unit of measure for the activity to be confirmed | CO_ISMNGEH | UNIT | 3 | T006 | CUNIT | MEINS | ||
ISM06 | Activity Currently to be Confirmed | RU_ISMNG | QUAN | 13(3) | MENGV13 | ||||
ABARB | Confirmation: Degree of processing | CO_ABARB | NUMC | 3 | CO_ABARB | ||||
ISMNW | Actual work | ISMNW | QUAN | 7(1) | ARBEIT | ||||
ISMNE | Unit for work | ARBEITE | UNIT | 3 | T006 | CUNIT | MEINS | ||
LEARR | Activity Type for Confirmation | LEARR | CHAR | 6 | CSLA | LSTAR | |||
IDAUR | Actual Duration for Confirmation | IDAUR | QUAN | 5(1) | DAUER_4_1 | ||||
IDAUE | Unit for actual duration | IDAURE | UNIT | 3 | T006 | CUNIT | MEINS | ||
ZCODE | Reference number for standard value code | DZCODE | CHAR | 6 | ZCODE | ||||
LOART | Wage Type | LOHNART | CHAR | 4 | LOART | ||||
QUALF | Suitability | QUALF | CHAR | 2 | T423 | QUALF | |||
ANZMA | Number of employees | ANZMS | DEC | 5(2) | ANZMA | ||||
LOGRP | Wage group | LOHNGRP | CHAR | 3 | T421 | LOHNGRP | |||
GMNGA | Previously confirmed yield in order unit of measure | RU_GMNGA | QUAN | 13(3) | MENG13 | ||||
LMNGA | Yield to Be Confirmed | RU_LMNGA | QUAN | 13(3) | MENGV13 | ||||
XMNGA | Scrap to Be Confirmed | RU_XMNGA | QUAN | 13(3) | MENGV13 | ||||
GMEIN | Base Unit of Measure | MEINS | UNIT | 3 | T006 | CUNIT | MEINS | ||
MEINH | Confirmation unit of measure | RU_VORME | UNIT | 3 | T006 | CUNIT | MEINS | ||
GRUND | Reason for Variance | CO_AGRND | CHAR | 4 | TRUG | CO_AGRND | |||
PERNR | Personnel number | CO_PERNR | NUMC | 8 | PERNR | PER | |||
ISDD | Confirmed date for start of execution | RU_ISDD | DATS | 8 | DATUM | ||||
ISDZ | Confirmed time for 'Execution start' | RU_ISDZ | TIMS | 6 | ATIME | ||||
IERD | Confirmed date for 'Setup finish' | RU_IERD | DATS | 8 | DATUM | ||||
IERZ | Confirmed time for 'Setup finish' | RU_IERZ | TIMS | 6 | ATIME | ||||
ISBD | Confirmed date for 'Processing start' | RU_ISBD | DATS | 8 | DATUM | ||||
ISBZ | Confirmed time for 'Processing start' | RU_ISBZ | TIMS | 6 | ATIME | ||||
IEBD | Confirmed date for 'processing finish' | RU_IEBD | DATS | 8 | DATUM | ||||
IEBZ | Confirmed time for 'processing finish' | RU_IEBZ | TIMS | 6 | ATIME | ||||
ISAD | Confirmed date for 'teardown start' | RU_ISAD | DATS | 8 | DATUM | ||||
ISAZ | Confirmed time for 'teardown start' | RU_ISAZ | TIMS | 6 | ATIME | ||||
IEDD | Confirmed date for execution finish | RU_IEDD | DATS | 8 | DATUM | EDR | |||
IEDZ | Confirmed time for 'Execution finish' | RU_IEDZ | TIMS | 6 | ATIME | EZR | |||
PEDD | Forecast finish date of operation from confirmation | CO_PEDD | DATS | 8 | DATUM | ||||
PEDZ | Forecast finish time of operation from confirmation | CO_PEDZ | TIMS | 6 | ATIME | ||||
WABLNR | Number of Material Document | MBLNR | CHAR | 10 | ALPHA | BELNR | MBN | ||
WEBLNR | Number of a document from a goods movement with errors | WEBLNR | CHAR | 10 | ALPHA | BELNR | |||
AUERU | Partial/Final Confirmation | AUERU_VS | CHAR | 1 | AUERU_VS | ||||
AUSOR | Clear Open Reservations | AUSBU | CHAR | 1 | XFELD | ||||
STNDR | Indicator: Standard confirmation | STNDR | CHAR | 1 | XFELD | ||||
MANUR | Indicator for type of confirmation | MANUR | CHAR | 1 | MANUR | ||||
MEILR | Indicator: Milestone confirmation carried out | MEILR | CHAR | 1 | MEILR | ||||
AUFPL | Routing number of operations in the order | CO_AUFPL | NUMC | 10 | AUFPL | ||||
APLZL | General counter for order | CO_APLZL | NUMC | 8 | AFVC | CO_APLZL | |||
AUFNR | Order Number | AUFNR | CHAR | 12 | AUFK | ALPHA | AUFNR | ANR | |
APLFL | Sequence | PLNFOLGE | CHAR | 6 | ALPHA | PLNFOLGE | |||
VORNR | Operation/Activity Number | VORNR | CHAR | 4 | NUMCV | VORNR | VGN | ||
SUMNR | Node number of the superior operation | SUMKNTNR | NUMC | 8 | KNTNR | ||||
OFM01 | Forecast value used to update the standard value | CO_SCHAETZ | QUAN | 9(3) | VGWRT | ||||
OFE01 | Unit of measurement for the forecast standard value | RU_PROGVGE | UNIT | 3 | T006 | CUNIT | MEINS | ||
LEK01 | Indicator: No remaining activity expected | CO_LEIKZ | CHAR | 1 | XFELD | ||||
OFM02 | Forecast value used to update the standard value | CO_SCHAETZ | QUAN | 9(3) | VGWRT | ||||
OFE02 | Unit of measurement for the forecast standard value | RU_PROGVGE | UNIT | 3 | T006 | CUNIT | MEINS | ||
LEK02 | Indicator: No remaining activity expected | CO_LEIKZ | CHAR | 1 | XFELD | ||||
OFM03 | Forecast value used to update the standard value | CO_SCHAETZ | QUAN | 9(3) | VGWRT | ||||
OFE03 | Unit of measurement for the forecast standard value | RU_PROGVGE | UNIT | 3 | T006 | CUNIT | MEINS | ||
LEK03 | Indicator: No remaining activity expected | CO_LEIKZ | CHAR | 1 | XFELD | ||||
OFM04 | Forecast value used to update the standard value | CO_SCHAETZ | QUAN | 9(3) | VGWRT | ||||
OFE04 | Unit of measurement for the forecast standard value | RU_PROGVGE | UNIT | 3 | T006 | CUNIT | MEINS | ||
LEK04 | Indicator: No remaining activity expected | CO_LEIKZ | CHAR | 1 | XFELD | ||||
OFM05 | Forecast value used to update the standard value | CO_SCHAETZ | QUAN | 9(3) | VGWRT | ||||
OFE05 | Unit of measurement for the forecast standard value | RU_PROGVGE | UNIT | 3 | T006 | CUNIT | MEINS | ||
LEK05 | Indicator: No remaining activity expected | CO_LEIKZ | CHAR | 1 | XFELD | ||||
OFM06 | Forecast value used to update the standard value | CO_SCHAETZ | QUAN | 9(3) | VGWRT | ||||
OFE06 | Unit of measurement for the forecast standard value | RU_PROGVGE | UNIT | 3 | T006 | CUNIT | MEINS | ||
LEK06 | Indicator: No remaining activity expected | CO_LEIKZ | CHAR | 1 | XFELD | ||||
OFMNW | Remaining work | REMNW | QUAN | 7(1) | ARBEIT | ||||
OFMNE | Unit of measure for remaining work | OFMNE | UNIT | 3 | T006 | CUNIT | MEINS | ||
LEKNW | Indicator: No Remaining Work Expected | LEKNW | CHAR | 1 | XFELD | ||||
ODAUR | Remaining duration of activity | ODAUR | QUAN | 5(1) | DAUER_4_1 | ||||
ODAUE | Unit for remaining duration | ODAUE | UNIT | 3 | T006 | CUNIT | MEINS | ||
STOKZ | Indicator: Document Has Been Reversed | CO_STOKZ | CHAR | 1 | FLAG | ||||
STZHL | Confirmation counter of cancelled confirmation | CO_STZHL | NUMC | 8 | CIM_COUNT | ||||
SMENG | Operation Quantity | MGVRG | QUAN | 13(3) | MENG13 | ||||
RUECK_MST | Completion confirmation number for the operation | CO_RUECK | NUMC | 10 | CO_RUECK | RCK | |||
RMZHL_MST | Confirmation counter | CO_RMZHL | NUMC | 8 | CIM_COUNT | RZL | |||
PDSNR | Sequential number for PDC messages | PDSNR_D | NUMC | 12 | Assigned to domain | PDSNR | |||
KAPID | Capacity ID | KAPID | NUMC | 8 | KAKO | KAPID | |||
SPLIT | Split number | CY_SPLIT | INT1 | 3 | INT1 | ||||
ZAUSW | Time Recording ID Number | DZAUSW | NUMC | 8 | ZAUSW | ||||
ORIND | Origin Indicator of PDC Message (Application) | ORIND | CHAR | 1 | ORIND | ||||
ORIGF | Origin Indicator of PDC Message | ORIGF | CHAR | 1 | ORIGF | ||||
CANUM | Counters for cap. rqmts. records (various caps. + indiv.caps | CY_COUNT | NUMC | 4 | KBED | CY_COUNT | |||
BELNR_IST | Document Number | CO_BELNR | CHAR | 10 | Assigned to domain | ALPHA | CO_BELNR | BLN | |
BELNR_UMB | Document Number | CO_BELNR | CHAR | 10 | Assigned to domain | ALPHA | CO_BELNR | BLN | |
RMNGA | Current rework quantity to be confirmed | RU_RMNGA | QUAN | 13(3) | MENGV13 | ||||
CATSBELNR | Document Number | CATSBELNR | CHAR | 10 | ALPHA | BELNR | |||
SATZA | Record type for confirmation | CO_SATZA | CHAR | 3 | CO_SATZA | ||||
ERZET | Confirmation entry time | RU_ERZET | TIMS | 6 | UZEIT | ||||
CATSPRICE | Price in Transaction Currency | CATSPRICE | CURR | 11(2) | WERTV6 | ||||
CATSTCURR | Transaction Currency | TWAER | CUKY | 5 | Assigned to domain | WAERS | FWS | ||
CATSPEINH | Price Unit | PEINH | DEC | 5 | PACK3 | ||||
BEMOT | Accounting Indicator | BEMOT | CHAR | 2 | TBMOT | BEMOT | |||
IPRZ1 | Current quantity to be confirmed for the business process | RU_IPRZS | QUAN | 13(3) | MENGV13 | ||||
IPRE1 | Unit of measurement for conf. quantity for business process | RU_IPRZE | UNIT | 3 | T006 | CUNIT | MEINS | ||
IPRK1 | No remaining quantity expected for business process | RU_IPRZK | CHAR | 1 | XFELD | ||||
EXNAM | External creator of confirmation | RU_EXNAM | CHAR | 12 | USNAM | ||||
EXERD | External date of entry for confirmation | RU_EXERD | DATS | 8 | DATUM | ||||
EXERZ | External time of entry for confirmation | RU_EXERZ | TIMS | 6 | UZEIT | ||||
PRZ01 | Business Process | CO_PRZNR | CHAR | 12 | Assigned to domain | ALPHA | CO_PRZNR | KWP | |
OPRZ1 | Remaining quantity for business process | OPRZ1 | QUAN | 13(3) | MENGV13 | ||||
OPRE1 | Unit for remaining quantity of business process | OPRE1 | UNIT | 3 | T006 | CUNIT | MEINS | ||
SKOKRS | Controlling Area | KOKRS | CHAR | 4 | Assigned to domain | CACCD | CAC | ||
SKOSTL | Sender Cost Center | SKOSTL | CHAR | 10 | Assigned to domain | ALPHA | KOSTL | KSK | |
NODAT | Do not update actual date in the operation | NODAT | CHAR | 1 | XFELD | ||||
ISMNU | Unit for work | ARBEITE | UNIT | 3 | T006 | CUNIT | MEINS | ||
OFMNU | Unit for work | ARBEITE | UNIT | 3 | T006 | CUNIT | MEINS | ||
PACKNO | Package number | PACKNO | NUMC | 10 | Assigned to domain | PACKNO | |||
EXTID | External Key for Confirmation (for example, from PDC System) | RU_EXTID | RAW | 16 | SYSUUID | ||||
SCHGRUP | Grouping for Shift Definitions and Shift Sequences | SCHGRUP | CHAR | 2 | Assigned to domain | SCHGRUP | |||
KAPTPROG | Shift definition | KAPTPROG | CHAR | 4 | Assigned to domain | KAPTPROG | |||
OBMAT | Material from Original Batch | UCMAT | CHAR | 18 | Assigned to domain | MATN1 | MATNR | MAT1 | |
OBCHA | Original Batch | UCCHA | CHAR | 10 | Assigned to domain | CHARG | MCH1 | ||
LICHA | Vendor Batch Number | LICHN | CHAR | 15 | LICHN | ||||
MYEAR | Material Document Year | MJAHR | NUMC | 4 | GJAHR | GJAHR | MJA | ||
ME_SFCID | SFC Number from the ME System | CO_MES_INT_SFCID | CHAR | 60 | CHAR60 | ||||
ME_2ND_CONF_QTY | Rework Quantity Confirmed from SAP ME | CO_MES_SECOND_CONF_QTY | QUAN | 13(3) | MENGV13 | ||||
.INCLU--AP | 0 | ||||||||
ROLE_ID | Role ID for Confirmation in Portal | RMAN_PRSP_ROLEID | CHAR | 1 | RMAN_PRSP_ROLEID | ||||
.INCLU--AP | 0 | ||||||||
UCMAT | Mill: Material in Process Batch | MILL_PCMAT | CHAR | 18 | Assigned to domain | MATN1 | MATNR | MAT1 | |
UCCHA | Mill: Process batch | MILL_PCCHA | CHAR | 10 | Assigned to domain | CHARG | MCH1 | ||
.INCLU--AP | 0 | ||||||||
WTY_IND | Warranty indicator | WTYSC_WTY_INDICATOR | CHAR | 1 | WTYSC_WTY_INDICATOR | ||||
ARBPL | Work Center | RU_ARBPLI | CHAR | 8 | ARBPL | AGR | |||
NAME | Name of employee | RU_NAME | CHAR | 40 | TEXT40 | ||||
PERSA | Personnel Area | PERSA | CHAR | 4 | Assigned to domain | PERSA | PBR | ||
UVORN | Suboperation | UVORN | CHAR | 4 | NUMCV | VORNR | |||
KOSTL | Cost Center | KOSTL | CHAR | 10 | Assigned to domain | ALPHA | KOSTL | KOS | |
KOKRS | Controlling Area | KOKRS | CHAR | 4 | Assigned to domain | CACCD | CAC | ||
INDBT | Field defined as in SY-TABIX | TABIX_D | INT4 | 10 | TABIX | ||||
KAPAR | Capacity category | KAPART | CHAR | 3 | TC26 | KAPART | CAA | ||
ABARBMAX | Deviation (in %) permitted for work in confirmation | DELTAARB | NUMC | 3 | NUM3 | ||||
ABARBIST | Deviation (in %) permitted for work in confirmation | DELTAARB | NUMC | 3 | NUM3 | ||||
ABDAUMAX | Permitted deviation (in %) for duration in confirmation | DELTADAU | NUMC | 3 | NUM3 | ||||
ABDAUIST | Permitted deviation (in %) for duration in confirmation | DELTADAU | NUMC | 3 | NUM3 | ||||
DEFSET | Default values set in collective confirmation | DEFSET | CHAR | 1 | XFELD | ||||
VSDAT | Indicator: Actual data already proposed | VSDAT | CHAR | 1 | XFELD | ||||
VSWBN | Indicator: Goods movements are already determined | VSWBN | CHAR | 1 | XFELD | ||||
LDATE | Logical Date | LDATE | DATS | 8 | DATUM | ||||
LTIME | Logical time | LTIME | TIMS | 6 | UZEIT | ||||
GRDTX | Text describing the reason for a variance in a confirmation | CO_GRDTX | CHAR | 30 | TEXT30 | ||||
ISMNW_2 | Actual Work | ISMNW_2 | QUAN | 8(2) | ARBEIT_2 | ||||
OFMNW_2 | Remaining Work | REMNW_2 | QUAN | 8(2) | ARBEIT_2 | ||||
SLK01 | Indicator: Determine target activity | RU_TARGET_ACTIVITY | CHAR | 1 | XFELD | ||||
SLK02 | Indicator: Determine target activity | RU_TARGET_ACTIVITY | CHAR | 1 | XFELD | ||||
SLK03 | Indicator: Determine target activity | RU_TARGET_ACTIVITY | CHAR | 1 | XFELD | ||||
SLK04 | Indicator: Determine target activity | RU_TARGET_ACTIVITY | CHAR | 1 | XFELD | ||||
SLK05 | Indicator: Determine target activity | RU_TARGET_ACTIVITY | CHAR | 1 | XFELD | ||||
SLK06 | Indicator: Determine target activity | RU_TARGET_ACTIVITY | CHAR | 1 | XFELD | ||||
SPRK1 | Indicator: Determine target qty for business transaction | RU_TARGET_BUS_PROC | CHAR | 1 | XFELD | ||||
EAML_TABIX | Field defined as in SY-TABIX | TABIX_D | INT4 | 10 | TABIX | ||||
MATNR | Material Number | MATNR | CHAR | 18 | Assigned to domain | MATN1 | MATNR | MAT | S_MAT1 |
CHARG | Batch Number | CHARG_D | CHAR | 10 | Assigned to domain | CHARG | CHA | ||
AUFNR_PRE | Predecessor Order Number | CO_ORDERPRE | CHAR | 12 | Assigned to domain | ALPHA | AUFNR | ||
POSNR_PRE | Predecessor Item Number | CO_POSPRE | NUMC | 4 | CO_POSNR | ||||
MATNR_PRE | Material of Predecessor Batch | CO_WIPB_PREB_MAT | CHAR | 18 | Assigned to domain | MATN1 | MATNR | ||
CHARG_PRE | Predecessor Batch | CO_WIPB_PREB_BATCH | CHAR | 10 | Assigned to domain | CHARG | |||
LFDNR | Sequence Number | LFDNR | CHAR | 3 | LFDNR | ||||
LAST_LMNGA | Total Yield Confirmed | LMNGA | QUAN | 13(3) | MENG13 | ||||
LAST_MEINH | Unit of Measure for Display | MEINH | UNIT | 3 | Assigned to domain | CUNIT | MEINS | ||
LAST_VORNR | Operation/Activity Number | VORNR | CHAR | 4 | NUMCV | VORNR | VGN | ||
BTYPE | Type of Batch in WIP Batch Management | CO_WIPBTYPE | CHAR | 2 | CO_WIPBTYPE | ||||
FLGGR | Indicator: Goods Receipt Status | CO_GRSTAT | CHAR | 1 | CO_GRSTAT | ||||
POSNR | Order Item Number | CO_POSNR | NUMC | 4 | CO_POSNR | ||||
PCLVL | WIP Batch Level | CO_WIPB_LVL | NUMC | 3 | NUMC03 | ||||
PCLVL_PRE | Predecessor WIP Batch Level | CO_WIPB_LVL_PRE | NUMC | 3 | NUMC03 | ||||
MBLNR | Number of Material Document | MBLNR | CHAR | 10 | ALPHA | BELNR | MBN | ||
MJAHR | Material Document Year | MJAHR | NUMC | 4 | GJAHR | GJAHR | MJA | ||
ZEILE | Item in Material Document | MBLPO | NUMC | 4 | MBLPO | POS | |||
FMATNR | Material Number | MATNR | CHAR | 18 | Assigned to domain | MATN1 | MATNR | MAT | S_MAT1 |
FCHARG | Batch Number | CHARG_D | CHAR | 10 | Assigned to domain | CHARG | CHA | ||
FCHARG_OLD | Batch Number | CHARG_D | CHAR | 10 | Assigned to domain | CHARG | CHA | ||
UMATNR | Material from Original Batch | UCMAT | CHAR | 18 | Assigned to domain | MATN1 | MATNR | MAT1 | |
UCHARG | Original Batch | UCCHA | CHAR | 10 | Assigned to domain | CHARG | MCH1 | ||
FLGUC | Indicator for Original Batches | CO_WIPB_FLG_OB | CHAR | 1 | XFELD | ||||
FLGPPC | Indicator for WIP Batches with Item Reference | CO_WIPB_FLG_POS | CHAR | 1 | XFELD | ||||
FLGFC | Indictor for Finished Batches | CO_WIPB_FLG_GRBATCH | CHAR | 1 | XFELD | ||||
FLGVC | Indicator: Predecessor Batch Exists | CO_WIPB_PREB_EXIST | CHAR | 1 | XFELD | ||||
FLGWA | Indicator for Assigned Goods Issue Batches | CO_WIPB_FLG_GIBATCH | CHAR | 1 | XFELD | ||||
FLGUC_CLR | Character Field Length 1 | CHAR01 | CHAR | 1 | CHAR1 | ||||
FLGPPC_CLR | Character Field Length 1 | CHAR01 | CHAR | 1 | CHAR1 | ||||
INV_FLG | Character Field Length 1 | CHAR01 | CHAR | 1 | CHAR1 | ||||
INACTIVE_FLG | Character Field Length 1 | CHAR01 | CHAR | 1 | CHAR1 | ||||
UPD_FLG | Character Field Length 1 | CHAR01 | CHAR | 1 | CHAR1 | ||||
FLGFC_UPD | Update indicator (I/U/D) | INDUPD | CHAR | 1 | INDUPD | ||||
FLGUC_UPD | Character Field Length 1 | CHAR01 | CHAR | 1 | CHAR1 | ||||
T_AUFNR | Order Number of Assignment Target of WIP Batch | CO_WIPB_ORDER | CHAR | 12 | Assigned to domain | ALPHA | AUFNR | ||
C_AUFNR | Order Number at Time of Creation of WIP Batch | CO_WIPB_ORD | CHAR | 12 | Assigned to domain | ALPHA | AUFNR | ||
CHARG_DEF | Batch Number | CHARG_D | CHAR | 10 | Assigned to domain | CHARG | CHA | ||
FLGACT | Activity Confirmation WIP Batch | CO_WIPBACT | CHAR | 46 | TV_IMAGE | ||||
POMVT | Indicator: Goods Movement for a WIP Batch | CO_WIPB_FLG_GM | CHAR | 1 | XFELD | ||||
PAMNG | Quantity in Unit of Entry | ERFMG | QUAN | 13(3) | MENG13 | ||||
PAMNE | Unit of Entry | ERFME | UNIT | 3 | Assigned to domain | CUNIT | MEINS | ||
LGORT | Storage Location | LGORT_D | CHAR | 4 | Assigned to domain | LGORT | LAG | ||
SOBKZ | Special Stock Indicator | SOBKZ | CHAR | 1 | Assigned to domain | SOBKZ | |||
INSMK | Stock Type | INSMK | CHAR | 1 | INSMK | ||||
BWART | Movement Type (Inventory Management) | BWART | CHAR | 3 | Assigned to domain | BWART | BWA | ||
PAKZG | Direction of Goods Movement | SHKZG_MIGO | CHAR | 1 | SHKZG_MIGO | ||||
MAT_PSPNR | Valuated Sales Order Stock WBS Element | MAT_PSPNR | NUMC | 8 | Assigned to domain | KONPR | PS_POSNR | ||
MAT_KDAUF | Sales Order Number of Valuated Sales Order Stock | MAT_KDAUF | CHAR | 10 | Assigned to domain | ALPHA | VBELN | AUN | |
MAT_KDPOS | Sales Order Item of Valuated Sales Order Stock | MAT_KDPOS | NUMC | 6 | NUM06 | KPO | |||
HSDAT | Date of Manufacture | HSDAT | DATS | 8 | DATUM | ||||
VFDAT | Shelf Life Expiration or Best-Before Date | VFDAT | DATS | 8 | DATUM | ||||
BWTAR | Valuation Type | BWTAR_D | CHAR | 10 | Assigned to domain | BWTAR | BWT | ||
GRBEW | Reason for Movement | MB_GRBEW | NUMC | 4 | Assigned to domain | MB_GRBEW | |||
ELIKZ | 'Delivery Completed' Indicator | ELIKZ | CHAR | 1 | XFELD | ||||
KZVBR | Consumption Posting | KZVBR | CHAR | 1 | KZVBR | ||||
FLGBWTAR | Split valuation | COWB_FLG_BWTAR | CHAR | 1 | FLAG | ||||
FLGMHD | Indicator HSDAT or MHDAT | COWB_FLG_MHD | CHAR | 1 | FLG_MHD | ||||
MAKTX | Material Description (Short Text) | MAKTX | CHAR | 40 | TEXT40 |
Key field | Non-key field |
How do I retrieve data from SAP structure AFRU_WIPB_RT using ABAP code?
As AFRU_WIPB_RT is a database structure and not a table it does not store any data in the SAP data dictionary. The ABAP SELECT statement is therefore not appropriate and can not be performed on AFRU_WIPB_RT as there is no data to select.How to access SAP table AFRU_WIPB_RT
Within an ECC or HANA version of SAP you can also view further information about AFRU_WIPB_RT and the data within it using relevant transactions such asSE11 (ABAP Dictionary Maintenance)
SM30 (Maintain Table Data)
SE80 (Object Navigator)
SE16 (Data Browser).
Search for further information about these or an SAP related objects