AFRU_INC_REF SAP (Confirmation/WIP Batches and Reference Fields) Structure details
Description: Confirmation/WIP Batches and Reference Fields
Structure field list including key, data, relationships and ABAP select examples
AFRU_INC_REF is a standard SAP Structure so does not store data like a database table does. It can be used to define the fields of other actual tables or to process "Confirmation/WIP Batches and Reference Fields" Information within sap ABAP programs.
This is done by declaring abap internal tables, work areas or database tables based on this Structure. These can then be used to store and process the required data appropriately.
i.e. DATA: wa_AFRU_INC_REF TYPE AFRU_INC_REF.
The AFRU_INC_REF table consists of various fields, each holding specific information or linking keys about Confirmation/WIP Batches and Reference Fields data available in SAP. These include MANDT (Client), RUECK (Completion confirmation number for the operation), RMZHL (Confirmation counter), ERSDA (Confirmation entry date).. See below for full list along with technical details, documentation, text table, check tables, foreign key relationships, conversion routines, relevant tcodes and example ABAP select code etc. .
Delivery Class:Display/Maintenance via tcode SM30: Display/Maintenance Allowed but with Restrictions
SAP enhancement categories: Can be enhanced (character-type or numeric)
SAP AFRU_INC_REF structure fields - Full list of fields found in SAP data dictionary
Field | Description | Data Element | Data Type | length (Dec) | Check table | Conversion Routine | Domain Name | MemoryID | SHLP |
MANDT | Client | MANDT | CLNT | 3 | T000 | MANDT | |||
RUECK | Completion confirmation number for the operation | CO_RUECK | NUMC | 10 | CO_RUECK | RCK | |||
RMZHL | Confirmation counter | CO_RMZHL | NUMC | 8 | CIM_COUNT | RZL | |||
ERSDA | Confirmation entry date | RU_ERSDA | DATS | 8 | DATUM | ||||
ERNAM | Name of the person who entered the confirmation | RU_ERNAM | CHAR | 12 | USNAM | ||||
LAEDA | Date of Last Change | LAEDA | DATS | 8 | DATUM | ||||
AENAM | Name of Person Who Changed Object | AENAM | CHAR | 12 | USNAM | ||||
BUDAT | Posting date | BUCHDATUM | DATS | 8 | DATUM | ||||
ARBID | Object ID | OBJEKTID | NUMC | 8 | NUM08 | PON | |||
WERKS | Plant | WERKS_D | CHAR | 4 | T001W | WERKS | WRK | H_T001W_C | |
LTXA1 | Confirmation text | CO_RTEXT | CHAR | 40 | TEXT40 | ||||
TXTSP | Language Key | SPRAS | LANG | 1 | T002 | ISOLA | SPRAS | SPR | H_T002 |
ISERH | Confirmed break time | ISERH | QUAN | 9(3) | VGWRT | ||||
ZEIER | Unit for the break time | DZEIER | UNIT | 3 | T006 | CUNIT | MEINS | ||
ILE01 | Unit of measure for the activity to be confirmed | CO_ISMNGEH | UNIT | 3 | T006 | CUNIT | MEINS | ||
ISM01 | Activity Currently to be Confirmed | RU_ISMNG | QUAN | 13(3) | MENGV13 | ||||
ILE02 | Unit of measure for the activity to be confirmed | CO_ISMNGEH | UNIT | 3 | T006 | CUNIT | MEINS | ||
ISM02 | Activity Currently to be Confirmed | RU_ISMNG | QUAN | 13(3) | MENGV13 | ||||
ILE03 | Unit of measure for the activity to be confirmed | CO_ISMNGEH | UNIT | 3 | T006 | CUNIT | MEINS | ||
ISM03 | Activity Currently to be Confirmed | RU_ISMNG | QUAN | 13(3) | MENGV13 | ||||
ILE04 | Unit of measure for the activity to be confirmed | CO_ISMNGEH | UNIT | 3 | T006 | CUNIT | MEINS | ||
ISM04 | Activity Currently to be Confirmed | RU_ISMNG | QUAN | 13(3) | MENGV13 | ||||
ILE05 | Unit of measure for the activity to be confirmed | CO_ISMNGEH | UNIT | 3 | T006 | CUNIT | MEINS | ||
ISM05 | Activity Currently to be Confirmed | RU_ISMNG | QUAN | 13(3) | MENGV13 | ||||
ILE06 | Unit of measure for the activity to be confirmed | CO_ISMNGEH | UNIT | 3 | T006 | CUNIT | MEINS | ||
ISM06 | Activity Currently to be Confirmed | RU_ISMNG | QUAN | 13(3) | MENGV13 | ||||
ABARB | Confirmation: Degree of processing | CO_ABARB | NUMC | 3 | CO_ABARB | ||||
ISMNW | Actual work | ISMNW | QUAN | 7(1) | ARBEIT | ||||
ISMNE | Unit for work | ARBEITE | UNIT | 3 | T006 | CUNIT | MEINS | ||
LEARR | Activity Type for Confirmation | LEARR | CHAR | 6 | CSLA | LSTAR | |||
IDAUR | Actual Duration for Confirmation | IDAUR | QUAN | 5(1) | DAUER_4_1 | ||||
IDAUE | Unit for actual duration | IDAURE | UNIT | 3 | T006 | CUNIT | MEINS | ||
ZCODE | Reference number for standard value code | DZCODE | CHAR | 6 | ZCODE | ||||
LOART | Wage Type | LOHNART | CHAR | 4 | LOART | ||||
QUALF | Suitability | QUALF | CHAR | 2 | T423 | QUALF | |||
ANZMA | Number of employees | ANZMS | DEC | 5(2) | ANZMA | ||||
LOGRP | Wage group | LOHNGRP | CHAR | 3 | T421 | LOHNGRP | |||
GMNGA | Previously confirmed yield in order unit of measure | RU_GMNGA | QUAN | 13(3) | MENG13 | ||||
LMNGA | Yield to Be Confirmed | RU_LMNGA | QUAN | 13(3) | MENGV13 | ||||
XMNGA | Scrap to Be Confirmed | RU_XMNGA | QUAN | 13(3) | MENGV13 | ||||
GMEIN | Base Unit of Measure | MEINS | UNIT | 3 | T006 | CUNIT | MEINS | ||
MEINH | Confirmation unit of measure | RU_VORME | UNIT | 3 | T006 | CUNIT | MEINS | ||
GRUND | Reason for Variance | CO_AGRND | CHAR | 4 | TRUG | CO_AGRND | |||
PERNR | Personnel number | CO_PERNR | NUMC | 8 | PERNR | PER | |||
ISDD | Confirmed date for start of execution | RU_ISDD | DATS | 8 | DATUM | ||||
ISDZ | Confirmed time for 'Execution start' | RU_ISDZ | TIMS | 6 | ATIME | ||||
IERD | Confirmed date for 'Setup finish' | RU_IERD | DATS | 8 | DATUM | ||||
IERZ | Confirmed time for 'Setup finish' | RU_IERZ | TIMS | 6 | ATIME | ||||
ISBD | Confirmed date for 'Processing start' | RU_ISBD | DATS | 8 | DATUM | ||||
ISBZ | Confirmed time for 'Processing start' | RU_ISBZ | TIMS | 6 | ATIME | ||||
IEBD | Confirmed date for 'processing finish' | RU_IEBD | DATS | 8 | DATUM | ||||
IEBZ | Confirmed time for 'processing finish' | RU_IEBZ | TIMS | 6 | ATIME | ||||
ISAD | Confirmed date for 'teardown start' | RU_ISAD | DATS | 8 | DATUM | ||||
ISAZ | Confirmed time for 'teardown start' | RU_ISAZ | TIMS | 6 | ATIME | ||||
IEDD | Confirmed date for execution finish | RU_IEDD | DATS | 8 | DATUM | EDR | |||
IEDZ | Confirmed time for 'Execution finish' | RU_IEDZ | TIMS | 6 | ATIME | EZR | |||
PEDD | Forecast finish date of operation from confirmation | CO_PEDD | DATS | 8 | DATUM | ||||
PEDZ | Forecast finish time of operation from confirmation | CO_PEDZ | TIMS | 6 | ATIME | ||||
WABLNR | Number of Material Document | MBLNR | CHAR | 10 | ALPHA | BELNR | MBN | ||
WEBLNR | Number of a document from a goods movement with errors | WEBLNR | CHAR | 10 | ALPHA | BELNR | |||
AUERU | Partial/Final Confirmation | AUERU_VS | CHAR | 1 | AUERU_VS | ||||
AUSOR | Clear Open Reservations | AUSBU | CHAR | 1 | XFELD | ||||
STNDR | Indicator: Standard confirmation | STNDR | CHAR | 1 | XFELD | ||||
MANUR | Indicator for type of confirmation | MANUR | CHAR | 1 | MANUR | ||||
MEILR | Indicator: Milestone confirmation carried out | MEILR | CHAR | 1 | MEILR | ||||
AUFPL | Routing number of operations in the order | CO_AUFPL | NUMC | 10 | AUFPL | ||||
APLZL | General counter for order | CO_APLZL | NUMC | 8 | AFVC | CO_APLZL | |||
AUFNR | Order Number | AUFNR | CHAR | 12 | AUFK | ALPHA | AUFNR | ANR | |
APLFL | Sequence | PLNFOLGE | CHAR | 6 | ALPHA | PLNFOLGE | |||
VORNR | Operation/Activity Number | VORNR | CHAR | 4 | NUMCV | VORNR | VGN | ||
SUMNR | Node number of the superior operation | SUMKNTNR | NUMC | 8 | KNTNR | ||||
OFM01 | Forecast value used to update the standard value | CO_SCHAETZ | QUAN | 9(3) | VGWRT | ||||
OFE01 | Unit of measurement for the forecast standard value | RU_PROGVGE | UNIT | 3 | T006 | CUNIT | MEINS | ||
LEK01 | Indicator: No remaining activity expected | CO_LEIKZ | CHAR | 1 | XFELD | ||||
OFM02 | Forecast value used to update the standard value | CO_SCHAETZ | QUAN | 9(3) | VGWRT | ||||
OFE02 | Unit of measurement for the forecast standard value | RU_PROGVGE | UNIT | 3 | T006 | CUNIT | MEINS | ||
LEK02 | Indicator: No remaining activity expected | CO_LEIKZ | CHAR | 1 | XFELD | ||||
OFM03 | Forecast value used to update the standard value | CO_SCHAETZ | QUAN | 9(3) | VGWRT | ||||
OFE03 | Unit of measurement for the forecast standard value | RU_PROGVGE | UNIT | 3 | T006 | CUNIT | MEINS | ||
LEK03 | Indicator: No remaining activity expected | CO_LEIKZ | CHAR | 1 | XFELD | ||||
OFM04 | Forecast value used to update the standard value | CO_SCHAETZ | QUAN | 9(3) | VGWRT | ||||
OFE04 | Unit of measurement for the forecast standard value | RU_PROGVGE | UNIT | 3 | T006 | CUNIT | MEINS | ||
LEK04 | Indicator: No remaining activity expected | CO_LEIKZ | CHAR | 1 | XFELD | ||||
OFM05 | Forecast value used to update the standard value | CO_SCHAETZ | QUAN | 9(3) | VGWRT | ||||
OFE05 | Unit of measurement for the forecast standard value | RU_PROGVGE | UNIT | 3 | T006 | CUNIT | MEINS | ||
LEK05 | Indicator: No remaining activity expected | CO_LEIKZ | CHAR | 1 | XFELD | ||||
OFM06 | Forecast value used to update the standard value | CO_SCHAETZ | QUAN | 9(3) | VGWRT | ||||
OFE06 | Unit of measurement for the forecast standard value | RU_PROGVGE | UNIT | 3 | T006 | CUNIT | MEINS | ||
LEK06 | Indicator: No remaining activity expected | CO_LEIKZ | CHAR | 1 | XFELD | ||||
OFMNW | Remaining work | REMNW | QUAN | 7(1) | ARBEIT | ||||
OFMNE | Unit of measure for remaining work | OFMNE | UNIT | 3 | T006 | CUNIT | MEINS | ||
LEKNW | Indicator: No Remaining Work Expected | LEKNW | CHAR | 1 | XFELD | ||||
ODAUR | Remaining duration of activity | ODAUR | QUAN | 5(1) | DAUER_4_1 | ||||
ODAUE | Unit for remaining duration | ODAUE | UNIT | 3 | T006 | CUNIT | MEINS | ||
STOKZ | Indicator: Document Has Been Reversed | CO_STOKZ | CHAR | 1 | FLAG | ||||
STZHL | Confirmation counter of cancelled confirmation | CO_STZHL | NUMC | 8 | CIM_COUNT | ||||
SMENG | Operation Quantity | MGVRG | QUAN | 13(3) | MENG13 | ||||
RUECK_MST | Completion confirmation number for the operation | CO_RUECK | NUMC | 10 | CO_RUECK | RCK | |||
RMZHL_MST | Confirmation counter | CO_RMZHL | NUMC | 8 | CIM_COUNT | RZL | |||
PDSNR | Sequential number for PDC messages | PDSNR_D | NUMC | 12 | Assigned to domain | PDSNR | |||
KAPID | Capacity ID | KAPID | NUMC | 8 | KAKO | KAPID | |||
SPLIT | Split number | CY_SPLIT | INT1 | 3 | INT1 | ||||
ZAUSW | Time Recording ID Number | DZAUSW | NUMC | 8 | ZAUSW | ||||
ORIND | Origin Indicator of PDC Message (Application) | ORIND | CHAR | 1 | ORIND | ||||
ORIGF | Origin Indicator of PDC Message | ORIGF | CHAR | 1 | ORIGF | ||||
CANUM | Counters for cap. rqmts. records (various caps. + indiv.caps | CY_COUNT | NUMC | 4 | KBED | CY_COUNT | |||
BELNR_IST | Document Number | CO_BELNR | CHAR | 10 | Assigned to domain | ALPHA | CO_BELNR | BLN | |
BELNR_UMB | Document Number | CO_BELNR | CHAR | 10 | Assigned to domain | ALPHA | CO_BELNR | BLN | |
RMNGA | Current rework quantity to be confirmed | RU_RMNGA | QUAN | 13(3) | MENGV13 | ||||
CATSBELNR | Document Number | CATSBELNR | CHAR | 10 | ALPHA | BELNR | |||
SATZA | Record type for confirmation | CO_SATZA | CHAR | 3 | CO_SATZA | ||||
ERZET | Confirmation entry time | RU_ERZET | TIMS | 6 | UZEIT | ||||
CATSPRICE | Price in Transaction Currency | CATSPRICE | CURR | 11(2) | WERTV6 | ||||
CATSTCURR | Transaction Currency | TWAER | CUKY | 5 | Assigned to domain | WAERS | FWS | ||
CATSPEINH | Price Unit | PEINH | DEC | 5 | PACK3 | ||||
BEMOT | Accounting Indicator | BEMOT | CHAR | 2 | TBMOT | BEMOT | |||
IPRZ1 | Current quantity to be confirmed for the business process | RU_IPRZS | QUAN | 13(3) | MENGV13 | ||||
IPRE1 | Unit of measurement for conf. quantity for business process | RU_IPRZE | UNIT | 3 | T006 | CUNIT | MEINS | ||
IPRK1 | No remaining quantity expected for business process | RU_IPRZK | CHAR | 1 | XFELD | ||||
EXNAM | External creator of confirmation | RU_EXNAM | CHAR | 12 | USNAM | ||||
EXERD | External date of entry for confirmation | RU_EXERD | DATS | 8 | DATUM | ||||
EXERZ | External time of entry for confirmation | RU_EXERZ | TIMS | 6 | UZEIT | ||||
PRZ01 | Business Process | CO_PRZNR | CHAR | 12 | Assigned to domain | ALPHA | CO_PRZNR | KWP | |
OPRZ1 | Remaining quantity for business process | OPRZ1 | QUAN | 13(3) | MENGV13 | ||||
OPRE1 | Unit for remaining quantity of business process | OPRE1 | UNIT | 3 | T006 | CUNIT | MEINS | ||
SKOKRS | Controlling Area | KOKRS | CHAR | 4 | Assigned to domain | CACCD | CAC | ||
SKOSTL | Sender Cost Center | SKOSTL | CHAR | 10 | Assigned to domain | ALPHA | KOSTL | KSK | |
NODAT | Do not update actual date in the operation | NODAT | CHAR | 1 | XFELD | ||||
ISMNU | Unit for work | ARBEITE | UNIT | 3 | T006 | CUNIT | MEINS | ||
OFMNU | Unit for work | ARBEITE | UNIT | 3 | T006 | CUNIT | MEINS | ||
PACKNO | Package number | PACKNO | NUMC | 10 | Assigned to domain | PACKNO | |||
EXTID | External Key for Confirmation (for example, from PDC System) | RU_EXTID | RAW | 16 | SYSUUID | ||||
SCHGRUP | Grouping for Shift Definitions and Shift Sequences | SCHGRUP | CHAR | 2 | Assigned to domain | SCHGRUP | |||
KAPTPROG | Shift definition | KAPTPROG | CHAR | 4 | Assigned to domain | KAPTPROG | |||
OBMAT | Material from Original Batch | UCMAT | CHAR | 18 | Assigned to domain | MATN1 | MATNR | MAT1 | |
OBCHA | Original Batch | UCCHA | CHAR | 10 | Assigned to domain | CHARG | MCH1 | ||
LICHA | Vendor Batch Number | LICHN | CHAR | 15 | LICHN | ||||
MYEAR | Material Document Year | MJAHR | NUMC | 4 | GJAHR | GJAHR | MJA | ||
ME_SFCID | SFC Number from the ME System | CO_MES_INT_SFCID | CHAR | 60 | CHAR60 | ||||
ME_2ND_CONF_QTY | Rework Quantity Confirmed from SAP ME | CO_MES_SECOND_CONF_QTY | QUAN | 13(3) | MENGV13 | ||||
.INCLU--AP | 0 | ||||||||
ROLE_ID | Role ID for Confirmation in Portal | RMAN_PRSP_ROLEID | CHAR | 1 | RMAN_PRSP_ROLEID | ||||
.INCLU--AP | 0 | ||||||||
UCMAT | Mill: Material in Process Batch | MILL_PCMAT | CHAR | 18 | Assigned to domain | MATN1 | MATNR | MAT1 | |
UCCHA | Mill: Process batch | MILL_PCCHA | CHAR | 10 | Assigned to domain | CHARG | MCH1 | ||
.INCLU--AP | 0 | ||||||||
WTY_IND | Warranty indicator | WTYSC_WTY_INDICATOR | CHAR | 1 | WTYSC_WTY_INDICATOR | ||||
ARBPL | Work Center | RU_ARBPLI | CHAR | 8 | ARBPL | AGR | |||
NAME | Name of employee | RU_NAME | CHAR | 40 | TEXT40 | ||||
PERSA | Personnel Area | PERSA | CHAR | 4 | Assigned to domain | PERSA | PBR | ||
UVORN | Suboperation | UVORN | CHAR | 4 | NUMCV | VORNR | |||
KOSTL | Cost Center | KOSTL | CHAR | 10 | Assigned to domain | ALPHA | KOSTL | KOS | |
KOKRS | Controlling Area | KOKRS | CHAR | 4 | Assigned to domain | CACCD | CAC | ||
INDBT | Field defined as in SY-TABIX | TABIX_D | INT4 | 10 | TABIX | ||||
KAPAR | Capacity category | KAPART | CHAR | 3 | TC26 | KAPART | CAA | ||
ABARBMAX | Deviation (in %) permitted for work in confirmation | DELTAARB | NUMC | 3 | NUM3 | ||||
ABARBIST | Deviation (in %) permitted for work in confirmation | DELTAARB | NUMC | 3 | NUM3 | ||||
ABDAUMAX | Permitted deviation (in %) for duration in confirmation | DELTADAU | NUMC | 3 | NUM3 | ||||
ABDAUIST | Permitted deviation (in %) for duration in confirmation | DELTADAU | NUMC | 3 | NUM3 | ||||
DEFSET | Default values set in collective confirmation | DEFSET | CHAR | 1 | XFELD | ||||
VSDAT | Indicator: Actual data already proposed | VSDAT | CHAR | 1 | XFELD | ||||
VSWBN | Indicator: Goods movements are already determined | VSWBN | CHAR | 1 | XFELD | ||||
LDATE | Logical Date | LDATE | DATS | 8 | DATUM | ||||
LTIME | Logical time | LTIME | TIMS | 6 | UZEIT | ||||
GRDTX | Text describing the reason for a variance in a confirmation | CO_GRDTX | CHAR | 30 | TEXT30 | ||||
ISMNW_2 | Actual Work | ISMNW_2 | QUAN | 8(2) | ARBEIT_2 | ||||
OFMNW_2 | Remaining Work | REMNW_2 | QUAN | 8(2) | ARBEIT_2 | ||||
SLK01 | Indicator: Determine target activity | RU_TARGET_ACTIVITY | CHAR | 1 | XFELD | ||||
SLK02 | Indicator: Determine target activity | RU_TARGET_ACTIVITY | CHAR | 1 | XFELD | ||||
SLK03 | Indicator: Determine target activity | RU_TARGET_ACTIVITY | CHAR | 1 | XFELD | ||||
SLK04 | Indicator: Determine target activity | RU_TARGET_ACTIVITY | CHAR | 1 | XFELD | ||||
SLK05 | Indicator: Determine target activity | RU_TARGET_ACTIVITY | CHAR | 1 | XFELD | ||||
SLK06 | Indicator: Determine target activity | RU_TARGET_ACTIVITY | CHAR | 1 | XFELD | ||||
SPRK1 | Indicator: Determine target qty for business transaction | RU_TARGET_BUS_PROC | CHAR | 1 | XFELD | ||||
EAML_TABIX | Field defined as in SY-TABIX | TABIX_D | INT4 | 10 | TABIX | ||||
POSNR | Order Item Number | CO_POSNR | NUMC | 4 | CO_POSNR | ||||
AJAHR | Year in Which Original Batch was Created | OB_AJAHR | NUMC | 4 | GJAHR | GJAHR | |||
VCWRK | Plant of Predecessor Batch | CO_WIPB_PREB_PLNT | CHAR | 4 | Assigned to domain | WERKS | |||
VCMAT | Material of Predecessor Batch | CO_WIPB_PREB_MAT | CHAR | 18 | Assigned to domain | MATN1 | MATNR | ||
VCCHA | Predecessor Batch | CO_WIPB_PREB_BATCH | CHAR | 10 | Assigned to domain | CHARG | |||
PCWRK_REF | Plant of Reference WIP Batch | CO_WIPBPLNT_REF | CHAR | 4 | Assigned to domain | WERKS | |||
PCMAT_REF | Material of Reference WIP Batch | CO_WIPBMAT_REF | CHAR | 18 | Assigned to domain | MATN1 | MATNR | ||
PCCHA_REF | Reference WIP Batch | CO_WIPBBATCH_REF | CHAR | 10 | Assigned to domain | CHARG | |||
ECWRK_REF | Plant of Reference Input Batch (GI) | IBPLNT_REF | CHAR | 4 | Assigned to domain | WERKS | |||
ECMAT_REF | Material of Reference Input Batch (GI) | IBMAT_REF | CHAR | 18 | Assigned to domain | MATN1 | MATNR | ||
ECCHA_REF | Reference Input Batch (GI) | IBBATCH_REF | CHAR | 10 | Assigned to domain | CHARG | |||
BCWRK_REF | Plant of Reference Stock Batch (GR) | SBPLNT_REF | CHAR | 4 | Assigned to domain | WERKS | |||
BCMAT_REF | Material of Reference Stock Batch (GR) | SBMAT_REF | CHAR | 18 | Assigned to domain | MATN1 | MATNR | ||
BCCHA_REF | Reference Stock Batch (GR) | SBBATCH_REF | CHAR | 10 | Assigned to domain | CHARG | |||
AUFNR_PRE | Predecessor Order Number | CO_ORDERPRE | CHAR | 12 | Assigned to domain | ALPHA | AUFNR | ||
POSNR_PRE | Predecessor Item Number | CO_POSPRE | NUMC | 4 | CO_POSNR | ||||
MATNR | Material Number | MATNR | CHAR | 18 | Assigned to domain | MATN1 | MATNR | MAT | S_MAT1 |
CHARG | Batch Number | CHARG_D | CHAR | 10 | Assigned to domain | CHARG | CHA | ||
MATNR_PRE | Material of Predecessor Batch | CO_WIPB_PREB_MAT | CHAR | 18 | Assigned to domain | MATN1 | MATNR | ||
CHARG_PRE | Predecessor Batch | CO_WIPB_PREB_BATCH | CHAR | 10 | Assigned to domain | CHARG | |||
PCLVL | WIP Batch Level | CO_WIPB_LVL | NUMC | 3 | NUMC03 | ||||
PCLVL_PRE | Predecessor WIP Batch Level | CO_WIPB_LVL_PRE | NUMC | 3 | NUMC03 | ||||
BTYPE | Type of Batch in WIP Batch Management | CO_WIPBTYPE | CHAR | 2 | CO_WIPBTYPE | ||||
FLGUC | Indicator for Original Batches | CO_WIPB_FLG_OB | CHAR | 1 | XFELD | ||||
FLGPPC | Indicator for WIP Batches with Item Reference | CO_WIPB_FLG_POS | CHAR | 1 | XFELD | ||||
FLGFC | Indictor for Finished Batches | CO_WIPB_FLG_GRBATCH | CHAR | 1 | XFELD | ||||
FLGGR | Indicator: Goods Receipt Status | CO_GRSTAT | CHAR | 1 | CO_GRSTAT | ||||
FLGUC_CLR | Single-Character Indicator | CHAR1 | CHAR | 1 | CHAR1 | ||||
FLGPPC_CLR | Single-Character Indicator | CHAR1 | CHAR | 1 | CHAR1 | ||||
MBLNR | Number of Material Document | MBLNR | CHAR | 10 | ALPHA | BELNR | MBN | ||
MJAHR | Material Document Year | MJAHR | NUMC | 4 | GJAHR | GJAHR | MJA | ||
ZEILE | Item in Material Document | MBLPO | NUMC | 4 | MBLPO | POS | |||
AUFPS_REF | Reference Production Order | CO_POSREF | NUMC | 6 | Assigned to domain | POSNR | |||
AUFNR_UT | Order Number | AUFNR | CHAR | 12 | Assigned to domain | ALPHA | AUFNR | ANR | |
FMATNR | Material Number | MATNR | CHAR | 18 | Assigned to domain | MATN1 | MATNR | MAT | S_MAT1 |
FCHARG | Batch Number | CHARG_D | CHAR | 10 | Assigned to domain | CHARG | CHA | ||
CHARG_DEF | Batch Number | CHARG_D | CHAR | 10 | Assigned to domain | CHARG | CHA | ||
UMATNR | Material Number | MATNR | CHAR | 18 | Assigned to domain | MATN1 | MATNR | MAT | S_MAT1 |
UCHARG | Batch Number | CHARG_D | CHAR | 10 | Assigned to domain | CHARG | CHA | ||
CUOBJ | Configuration (internal object number) | CUOBJ | NUMC | 18 | CUOBJ | CUX | |||
AUART | Order Type | AUFART | CHAR | 4 | Assigned to domain | AUFART | AAT | ||
AUTYP | Order category | AUFTYP | NUMC | 2 | AUFTYP | ||||
BWART | Movement Type (Inventory Management) | BWART | CHAR | 3 | Assigned to domain | BWART | BWA | ||
KZBEW | Movement Indicator | KZBEW | CHAR | 1 | KZBEW | ||||
FLGNOBATCH | Indicator: Create Entry for COWIPB-CHVW Only | CO_FLG_NOWIPB | CHAR | 1 | XFELD | ||||
LAST_VORNR_CPY | Operation/Activity Number | VORNR | CHAR | 4 | NUMCV | VORNR | VGN | ||
FLGDUP_MERGE | Single-Character Indicator | CHAR1 | CHAR | 1 | CHAR1 | ||||
LFDNR | Sequence Number | LFDNR | CHAR | 3 | LFDNR |
Key field | Non-key field |
How do I retrieve data from SAP structure AFRU_INC_REF using ABAP code?
As AFRU_INC_REF is a database structure and not a table it does not store any data in the SAP data dictionary. The ABAP SELECT statement is therefore not appropriate and can not be performed on AFRU_INC_REF as there is no data to select.How to access SAP table AFRU_INC_REF
Within an ECC or HANA version of SAP you can also view further information about AFRU_INC_REF and the data within it using relevant transactions such asSE11 (ABAP Dictionary Maintenance)
SM30 (Maintain Table Data)
SE80 (Object Navigator)
SE16 (Data Browser).
Search for further information about these or an SAP related objects