Messsage Text for 140(CKCC)
Change selection criteria or check allowance for marking
What causes this issue?
No data was selected for marking.
Possible causes:
There is insufficient data in the selection screen to select the
required cost estimates.
The organizational measure was not carried out, or it was issued with a
different costing variant to that of the cost estimates (
Marking Allowance>).
All the cost estimates contain errors.
The cost estimates have already been marked or released.
For detailed information, call up the log.
ABAP Code to add mesage to own reports
MESSAGE W140(CKCC). "warning message
MESSAGE E140(CKCC). "Error message
--> See here for more options
Use the comments section below to add any links, information or screen shots that you feel are relevant to this message. This could include issues you have found that cause the messages to appear incorrectly as well as any fixes you have found or relevant SAP OSS notes. You will then be able to find this information quickly, simply by searching on the message class CKCC and number 140
Return to Message Class CKCC