SAP MCFKENNZ Table in S/4 HANA - Additional key figures PP
MCFKENNZ is a standard SAP Table which is used to store Additional key figures PP data and is available within SAP S/4 HANA systems and previous ECC R/3 systems. Below is the technical details and the field list relevant for an SAP S/4 HANA system, see here for details and fields available within the SAP R/3 version of the MCFKENNZ table(ECC)
Delivery Class:
Display/Maintenance via SM30: Display/Maintenance Allowed but with Restrictions
Enhancement category: Can be enhanced (character-type or numeric)
Dictionary Type: Structure
Database Table: MCFKENNZ
MCFKENNZ table structure field list
Below is the full MCFKENNZ field list that makes up the SAP database table structure, including key fields, description, data type and other technical details of each field
Field | Description | Data Element | Data Type | length (Dec) | Check table | Conversion Routine | Domain Name | MemoryID | SHLP | SHLP Field |
MNGAB | Quantity Variance | MC_MNGAB | QUAN | 15(3) | MENG15 | |||||
WRTAB | Value variance | MC_WRTAB | CURR | 19(2) | WERTV10 | |||||
ANZFA | Number of production orders | MC_ANZFA | DEC | 9(0) | MCZAEHLER | |||||
PGMNG | Planned quantity | MC_PMENG | QUAN | 15(3) | MENG15 | |||||
PAMNG | Planned scrap quantity | MC_PAMNG | QUAN | 15(3) | MENG15 | |||||
ANZVORGANG | Number of operations | MC_ANZVORG | DEC | 9(0) | MCZAEHLER | |||||
IZGR01 | Actual performance efficiency rate for activity type 1 | MCIZGR01 | DEC | 5(1) | PROZENT041 | |||||
IZGR02 | Actual performance efficiency rate for activity type 2 | MCIZGR02 | DEC | 5(1) | PROZENT041 | |||||
IZGR03 | Actual performance efficiency rate for activity type 3 | MCIZGR03 | DEC | 5(1) | PROZENT041 | |||||
IZGR04 | Actual performance efficiency rate for activity type 4 | MCIZGR04 | DEC | 5(1) | PROZENT041 | |||||
IZGR05 | Actual performance efficiency rate for activity type 5 | MCIZGR05 | DEC | 5(1) | PROZENT041 | |||||
IZGR06 | Actual performance efficiency rate for activity type 6 | MCIZGR06 | DEC | 5(1) | PROZENT041 | |||||
PS_MENG | Planned/target quantity deviation | PS_MENG | QUAN | 15(3) | MENGV15_3 | |||||
PI_MENG | Planned/actual quantity deviation | PI_MENG | QUAN | 15(3) | MENGV15_3 | |||||
SI_MENG | Target/actual quantity deviation | DSI_MENG | QUAN | 15(3) | MENGV15_3 | |||||
PS_AUSS | Planned/target scrap deviation | PS_AUSS | QUAN | 15(3) | MENGV15_3 | |||||
PI_AUSS | Planned/actual scrap deviation | PI_AUSS | QUAN | 15(3) | MENGV15_3 | |||||
SI_AUSS | Target/actual scrap deviation | DSI_AUSS | QUAN | 15(3) | MENGV15_3 | |||||
P_DLZ | Planned lead time | P_DLZ | QUAN | 7(1) | DAUER_6_1V | |||||
S_DLZ | Target lead time | S_DLZ | QUAN | 7(1) | DAUER_6_1V | |||||
I_DLZ | Actual lead time | I_DLZ | QUAN | 7(1) | DAUER_6_1V | |||||
PIDLZ | Planned/actual lead time deviation | PIDLZ | QUAN | 7(1) | DAUER_6_1V | |||||
SIDLZ | Target/actual lead time deviation | SIDLZ | QUAN | 7(1) | DAUER_6_1V | |||||
S_WTZ | Target queue time | S_WTZ | QUAN | 7(1) | DAUER_6_1V | |||||
I_WTZ | Actual queue time | I_WTZ | QUAN | 7(1) | DAUER_6_1V | |||||
WTZAB | Queue time deviation | WTZAB | QUAN | 7(1) | DAUER_6_1V | |||||
PS_FREI | Planned/target deviation in scheduled release date | PS_FREI | QUAN | 7(1) | DAUER_6_1V | |||||
PI_FREI | Planned/actual deviation in scheduled release date | PI_FREI | QUAN | 7(1) | DAUER_6_1V | |||||
SI_FREI | Target/actual deviation in scheduled release date | DSI_FREI | QUAN | 7(1) | DAUER_6_1V | |||||
PS_STAR | Planned/target deviation in start date | PS_STAR | QUAN | 7(1) | DAUER_6_1V | |||||
PI_STAR | Planned/actual deviation in scheduled start date | PI_STAR | QUAN | 7(1) | DAUER_6_1V | |||||
SI_STAR | Target/actual schedule deviation in start date | DSI_STAR | QUAN | 7(1) | DAUER_6_1V | |||||
PS_LIEF | Planned/target deviation in scheduled delivery date | PS_LIEF | QUAN | 7(1) | DAUER_6_1V | |||||
PI_LIEF | Planned/actual deviation in scheduled delivery date | PI_LIEF | QUAN | 7(1) | DAUER_6_1V | |||||
SI_LIEF | Target/actual deviation in scheduled delivery date | DSI_LIEF | QUAN | 7(1) | DAUER_6_1V | |||||
DLZAB | Deviation in lead time | DLZAB | QUAN | 7(1) | DAUER_6_1 | |||||
KAPAN | Available capacity | MC_KAPAN | QUAN | 7(1) | DAUER_6_1 | |||||
KSUMS | Total target capacity requirements | MC_KSUMS | QUAN | 7(1) | DAUER_6_1V | |||||
KAPAZ | Capacity Load Utilization | MC_KAPAZ | DEC | 4(0) | MENGEP4 | |||||
Z_TAB | Deviation from scheduled input date | X_TAB | QUAN | 7(1) | DAUER_6_1V | |||||
ZA_TAB | Schedule deviation: input date in relation to output date | DZA_TAB | QUAN | 7(1) | DAUER_6_1 | |||||
A_TAB | Deviation in scheduled output date | A_TAB | QUAN | 7(1) | DAUER_6_1V | |||||
R_TAB | Relative schedule deviation | R_TAB | QUAN | 7(1) | DAUER_6_1V | |||||
ABWMG | Quantity Variance | ABWMG | QUAN | 15(3) | MENG15 | |||||
ABWAS | Scrap Variance | ABWAS | QUAN | 15(3) | MENG15 |
Search for further information about these or an SAP related objects