SAP Tables | Project System | Information System(PS-IS) SAP PS

ACT01 SAP Activity for LDB 01 Structure







ACT01 is an SAP Structure so does not store data like a database table does but can be used to process "Activity for LDB 01" information within SAP ABAP programs. This is done by declaring ABAP internal tables, work areas or database tables based on this Structure. These can then be used to store and process the required data appropriately.

i.e. DATA: wa_ACT01 TYPE ACT01 .

Below is the documentation avaialable and full details of the fields which make up this Structure. You can view further information via relevant transactions such as SE11 or SE80. Also check out the Comments section below to view or add related contributions and example screen shots.

Delivery Class: A - Application table containing master and transaction data

Display/Maintenance via SM30: Yes but with Restrictions

Enhancement category i: Can be enhanced (character-type or numeric)

==>View Table relationships


Dictionary fields for SAP Structure ACT01

Field
Component Type
Data Typelength (Decimals)ChecktableDescription
.INCLUDEAFVGD Order: Dialog table for Table AFVG (order operation)
.INCLUDEAFVKI Include structure of the operation key
MANDTMANDTCLNT3 T000Client
AUFPLCO_AUFPLNUMC10 Routing number of operations in the order
APLZLCO_APLZLNUMC8 AFVCGeneral counter for order
.INCLUDEAFVGI General include structure of the operation data
PLNFLPLNFOLGECHAR6 Sequence
PLNKNPLNKNNUMC8 Number of the task list node
PLNALPLNALCHAR2 Group Counter
PLNTYPLNTYCHAR1 TCA01Task List Type
VINTVVINTVDEC3 Increment between referenced operations
PLNNRPLNNRCHAR8 Key for Task List Group
ZAEHLCIM_COUNTNUMC8 Internal counter
VORNRVORNRCHAR4 Operation/Activity Number
STEUSSTEUSCHAR4 T430Control key
ARBIDCR_OBJIDNUMC8 CRIDObject ID of the resource
PDESTCR_PDESTCHAR4 TSP03Printer for shop papers
WERKSWERKS_DCHAR4 T001WPlant
KTSCHKTSCHCHAR7 T435Standard text key
LTXA1LTXA1CHAR40 Operation short text
LTXA2LTXA2CHAR40 Second line of the description
TXTSPSPRASLANG1 T002Language Key
VPLTYVPLNTYCHAR1 TCA01Type of the referenced task list
VPLNRVPLNNRCHAR8 Group of the referenced task list
VPLALVPLNALCHAR2 Group counter of the referenced task list
VPLFLVPLBFLCHAR6 Referenced sequence in routing
VGWTSVORGSCHLCHAR4 TC21Standard value key
LAR01LSTARCHAR6 CSLAActivity Type
LAR02LSTARCHAR6 CSLAActivity Type
LAR03LSTARCHAR6 CSLAActivity Type
LAR04LSTARCHAR6 CSLAActivity Type
LAR05LSTARCHAR6 CSLAActivity Type
LAR06LSTARCHAR6 CSLAActivity Type
ZERMADZERMACHAR5 T429Type of standard value calculation
ZGDATDZGDATCHAR4 Date when the standard value was calculated
ZCODEDZCODECHAR6 Reference number for standard value code
ZULNRDZULNRCHAR5 Basis for standard value calculation
LOANZLOHNANZDEC3 Number of Time Tickets
LOARTLOHNARTCHAR4 Wage Type
RSANZCR_RS_ANZNUMC3 Number of confirmation slips
QUALFQUALFCHAR2 T423Suitability
ANZMAANZMSDEC5(2) Number of employees
RFGRPRUEFAGRPCHAR10 T426Setup group category
RFSCHRUEFASCHLUCHAR10 T425Setup group key
RASCHRUEARSCHLUCHAR2 T428Setup Type Key
AUFAKAUSCHUFAKDEC5(3) Scrap factor
LOGRPLOHNGRPCHAR3 T421Wage group
UEMUSUEMUSKZCHAR1 Required overlapping
UEKANUEKANKZCHAR1 Optional overlapping
FLIESFLIESSKZCHAR1 Indicator: continuous flow production
SPMUSSPLITTUNGCHAR1 Required splitting
SPLIMSPLITTANZDEC3 Maximum number of splits
ABLIPKZABLIPKZCHAR1 Indicator: simultaneous teardown and wait
RSTRARSTRACHAR2 T499QReduction strategy per operation/activity
SUMNRSUMKNTNRNUMC8 Node number of the superior operation
SORTLSORTICHAR10 Sort Term for Non-Stock Info Records
LIFNRLIFNRCHAR10 LFA1Account Number of Vendor or Creditor
PREISPREISCURR11(2) Price
PEINHPEINHDEC5 Price Unit
SAKTOKSTARCHAR10 CSKACost Element
WAERSWAERSCUKY5 TCURCCurrency Key
INFNRINFNRCHAR10 EINANumber of Purchasing Info Record
ESOKZESOKZCHAR1 Purchasing info record category
EKORGEKORGCHAR4 T024EPurchasing Organization
EKGRPVG_EKGRPCHAR3 T024Purchasing group for external processing
KZLGFKZLGFCHAR1 Indicator: fixed lot external processing
KZWRTFKZWRTFCHAR1 Indicator: Fixed price for external processing
DDEHNDAUDEHNCHAR1 Indicator: flexible duration
ANZZLANZKAPINT13 Number of capacities required
PRZNTAPROZENTINT13 Work percentage
MLSTNMILESTONECHAR5 T433Usage
PPRIOPRIORITAETCHAR2 Priority
BUKRSBUKRSCHAR4 T001Company Code
ANFKOANFKOCHAR10 CSKSRequesting cost center
ANFKOKRSANFKOKRSCHAR4 TKA01Controlling area of the requesting cost center
INDETINDETCHAR1 Key for calculation
LARNTLSTARCHAR6 CSLAActivity Type
PRKSTPRKSTCURR11(2) Costs in the activity
APLFLPLNFOLGECHAR6 Sequence
RUECKCO_RUECKNUMC10 Completion confirmation number for the operation
RMZHLCO_RMZHLNUMC8 Confirmation counter
PROJNPS_PSP_ELENUMC8 PRPSWork breakdown structure element (WBS element)
OBJNRJ_OBJNRCHAR22 ONR00Object number
SPANZSPLITTERMDEC3 Actual number of splits
BEDIDBEDIDNUMC12
*
ID of the capacity requirements record
BEDZLCIM_COUNTNUMC8 Internal counter
BANFNCO_BANFNCHAR10 Purchase requisition number
BNFPOCO_BNFPONUMC5 EBANItem number of the purchase requisition in the order
LEK01CO_LEIKZCHAR1 Indicator: No remaining activity expected
LEK02CO_LEIKZCHAR1 Indicator: No remaining activity expected
LEK03CO_LEIKZCHAR1 Indicator: No remaining activity expected
LEK04CO_LEIKZCHAR1 Indicator: No remaining activity expected
LEK05CO_LEIKZCHAR1 Indicator: No remaining activity expected
LEK06CO_LEIKZCHAR1 Indicator: No remaining activity expected
SELKZCO_SELKZCHAR1 TCK08Selection indicator for costing line items
KALIDWFCIDCHAR2 TFACDFactory Calendar
FRSPFRSPCHAR1 Earliest possible activity / Latest possible activity
STDKNSTDKNNUMC8 Node of operation within reference operation set
ANLZUANLZUCHAR1 T357MSyst.Condition
ISTRUISTRUCHAR18 MARAAssembly
ISTTYSTLTYCHAR1 BOM category
ISTNRSTNUMCHAR8 Bill of material
ISTKNSTLKNNUMC8 BOM item node number
ISTPOCIM_COUNTNUMC8 Internal counter
IUPOZUPOSZCHAR4 Subitem Number
EBORTEBORTCHAR20 Installation Point for Subitem
VERTLCR_VERTNCHAR8 TC29Distr.cap.reqmts (plant maint.,process order, network)
LEKNWLEKNWCHAR1 Indicator: No Remaining Work Expected
NPRIONW_PRIOCHAR1 TCN07Priority
PVZKNCO_APLZLNUMC8
*
General counter for order
PHFLGPHFLGCHAR1 Indicator: Phase
PHSEQPHSEQCHAR2 TC52Control Recipe Destination
KNOBJKNOBJNUMC18 Number of Object with Assigned Dependencies
ERFSICHTQERFSICHTCHAR2 Recording View
QPPKTABSQPPKTABSCHAR1 Flow Variants for Inspection Point Completion
OTYPEOTYPECHAR2 T778OObject Type
OBJEKTIDOBJEKTIDNUMC8 Object ID
QLKAPARQL_KAPARTCHAR3 TC26Capacity category
RSTUFRSTUFNUMC1 Reduction level which reduces operation lead time
NPTXTKYTXTKYCHAR12 Internal text number (12-character)
SUBSYSQEIFSUBSYSCHAR6
*
Subsystem Identifier for QM Subsystem Interface
PSPNRPS_SPS_ELENUMC8
*
Standard WBS element
PACKNOPACKNONUMC10
*
Package number
TXJCDTXJCDCHAR15 TTXJTax Jurisdiction
SCOPESCOPE_CVCHAR2 Object Class
GSBERGSBERCHAR4 TGSBBusiness Area
PRCTRPRCTRCHAR10 CEPCProfit Center
NO_DISPNO_DISP_PLUSCHAR1 Effective for Materials Planning
QKZPRZEITQKZPRZEITCHAR1 Interval = Time (Time-Related)
QKZZTMG1QKZZTMG1CHAR1 Quantity Confirmation for Each Partial Lot
QKZPRMENGQKZPRMENGCHAR1 Creation Cycle = Quantity (Quantity-Reference)
QKZPRFREIQKZPRFREICHAR1 Interval Without Reference to Time or Quantity
KZFEATQKZFEATCHAR1 Indicator Is Not Used Currently
QKZTLSBESTQKZTLSBESTCHAR1 Operation with Stock-Related Partial Lot Assignment
AENNRAENNRCHAR12 AENRChange Number
CUOBJ_ARBCUOBJNUMC18 Configuration (internal object number)
EVGEWEV_WEIGHTDDEC8 Aggregation weight for POC (PS progress)
ARBIICR_OBJID_INUMC8 CRIDActual operating resources object identification
WERKIWERKS_ICHAR4 T001WActual plant
CY_SEQNRVCY_SEQNRVNUMC14 Sequence number operation
KAPT_PUFFRKAPT_PUFFRINT410 Operation floats after finite scheduling (in seconds)
EBELNEBELNCHAR10 EKKOPurchasing Document Number
EBELPEBELPNUMC5 EKPOItem Number of Purchasing Document
WEMPFWEMPFCHAR12 Goods Recipient/Ship-To Party
ABLADABLADCHAR25 Unloading Point
CLASFCLASFCHAR1 Ind.: Take Activity Into Account for Project Summarization
FRUNVFRUNVCHAR1 Indicator: External procurement data incomplete
ZSCHLAUFZSCHLCHAR6 Overhead key
KALSMAUFKALSMCHAR6
*
Costing Sheet
SCHED_ENDSCEND_ACTCHAR1 Ind.: Purchase requisition at activity finish date
NETZKONTNETZKONTCHAR1 Indicator for the account assignment of a network(hdr/act.)
OWAEROWAERSCUKY5 TCURCObject currency for network activity
AFNAMAFNAMCHAR12 Name of Requisitioner/Requester
BEDNRBEDNRCHAR10 Requirement Tracking Number
KZFIXCN_KZFIXCHAR1 Indicator: Purchasing info record data are fixed
PERNRCO_PERNRNUMC8 Personnel number
FRDLBCO_FRDLBCHAR1 Indicator: Externally processed op. with subcontracting
QPARTQPARTCHAR8 TQ30Inspection Type
LOEKZAUFLOEKZCHAR1 Deletion flag
WKURSWKURSDEC9(5) Exchange Rate
PROD_ACTPROD_ACTCHAR1 Indicator: Activity is a production activity
FPLNRFPLNRCHAR10
*
Billing plan number / invoicing plan number
OBJTYPEOCM_OBJ_TYPECHAR1 Change indicator
CH_PROCOCM_CH_PROCCHAR1 Process that has lead to the change of an object
KLVARCK_KLVARCHAR4
*
Costing Variant
KALNRCK_KALNRNUMC12
*
Cost Estimate Number for Cost Est. w/o Qty Structure
FORDNSFORDNCHAR10
*
Framework Order
FORDPFORDPNUMC5
*
Item of framework order
MAT_PRKSTMAT_PRKSTCURR11(2) Material planning in networks: primary costs
PRZ01CO_PRZNRCHAR12
*
Business Process
RFPNTCN_RFPNTCHAR20 TCNRFPReference point for BOM transfer
FUNC_AREAFKBERCHAR16 TFKBFunctional Area
TECHSTECHSCHAR12 Parameter Variant/Standard Variant
ADPSPADDCOMPARE_CORECHAR40
*
Reference Element PM/PS
RFIPPNTCN_RPIPCHAR20 TCNRPIPReference Point for Relationship Between iPPE and PS
MES_OPERIDCO_MES_INT_OPERIDCHAR48 Key of an Operation from an ME System
MES_STEPIDCO_MES_INT_STEPIDCHAR6 Key of a Step in a Routing (SAP ME)
/CUM/CUGUIDSYSUUID_XRAW16 /CUM/AFCUUUID in X form (binary)
/ISDFPS/OBJNRJ_OBJNRCHAR22
*
Object number
.APPENDACTIVITY_STATUS Activity Leading Status
AFVC_STATUSACTCMB_DELEINT13 ACTCMB_TABStatus Combination
.APPENDMILL_PP_OC Mill: Order Combination / ATRKZ
.INCLUDEMILL_OC_MERGE_ORDER Mill: Order Number for Combined Order in Operation
MILL_OC_AUFNR_MOMILL_OC_AUFNR_MOCHAR12
*
Number of Combined Order
.APPENDWTYSC_AFVGI_AS ## AFGVI ##### WTYSC
.INCLUDEWTYSC_S_WTY_INDICATOR Warranty Indicator
WTY_INDWTYSC_WTY_INDICATORCHAR1 Warranty indicator
.INCLUDEAFVVI Include structure of the operation quantities/dates/values
MEINHVORMEUNIT3 T006Unit of Measure for Activity/Operation
UMRENCP_UMRENDEC5 Denominator for converting rtg and op units of measure
UMREZCP_UMREZDEC5 Numerator for converting task list and oper. un. of measure
BMSCHBMSCHQUAN13(3) Base Quantity
ZMERHDZMERHQUAN9(3) Break
ZEIERDZEIERUNIT3 T006Unit for the break time
VGE01VGWRTEHUNIT3 T006Unit of measure for the standard value
VGW01VGWRTQUAN9(3) Standard Value
VGE02VGWRTEHUNIT3 T006Unit of measure for the standard value
VGW02VGWRTQUAN9(3) Standard Value
VGE03VGWRTEHUNIT3 T006Unit of measure for the standard value
VGW03VGWRTQUAN9(3) Standard Value
VGE04VGWRTEHUNIT3 T006Unit of measure for the standard value
VGW04VGWRTQUAN9(3) Standard Value
VGE05VGWRTEHUNIT3 T006Unit of measure for the standard value
VGW05VGWRTQUAN9(3) Standard Value
VGE06VGWRTEHUNIT3 T006Unit of measure for the standard value
VGW06VGWRTQUAN9(3) Standard Value
ZEIMUDZEIMUUNIT3 T006Unit for the minimum overlap time
ZMINUDZMINUQUAN9(3) Minimum overlap time
MINWEMINWEIQUAN13(3) Minimum Send-Ahead Quantity
ZEIMBDZEIMBUNIT3 T006Unit for the minimum processing time
ZMINBDZMINBQUAN9(3) Minimum processing time
ZEILMDZEILMUNIT3 T006Unit for the maximum wait time
ZLMAXDZLMAXQUAN9(3) Maximum wait time
ZEILPDZEILPUNIT3 T006Unit for the required wait time
ZLPRODZLPROQUAN9(3) Minimum wait time
ZEIWNDZEIWNUNIT3 T006Unit for the standard queue time
ZWNORDZWNORQUAN9(3) Standard queue time
ZEIWMDZEIWMUNIT3 T006Unit for the minumum queue time
ZWMINDZWMINQUAN9(3) Minimum queue time
ZEITNDZEITNUNIT3 T006Unit for the standard move time
ZTNORDZTNORQUAN9(3) Standard move time
ZEITMDZEITMUNIT3 T006Unit for the minimum move time
ZTMINDZTMINQUAN9(3) Minimum move time
PLIFZPLIFZDEC3 Planned Delivery Time in Days
DAUNODAUNORQUAN5(1) Normal duration of the activity
DAUNEDAUNOREUNIT3 T006Normal duration/unit
DAUMIDAUMINQUAN5(1) Minimum activity duration
DAUMEDAUMINEUNIT3 T006Unit for the minimum duration
EINSAEINSCHRACHAR1 Constraint on the basic start date for the activity
EINSEEINSCHRECHAR1 Constraint on the finish date of the activity
ARBEIARBEITQUAN7(1) Work involved in the activity
ARBEHARBEITEUNIT3 T006Unit for work
MGVRGMGVRGQUAN13(3) Operation Quantity
ASVRGASVRGQUAN13(3) Operation scrap
LMNGALMNGAQUAN13(3) Total Yield Confirmed
XMNGAXMNGAQUAN13(3) Total scrap quantity confirmed
GMNGAGMNGAQUAN13(3) Confirmed yield in order unit of measure
ISM01CO_RUMNGQUAN13(3) Previously confirmed activity
ISM02CO_RUMNGQUAN13(3) Previously confirmed activity
ISM03CO_RUMNGQUAN13(3) Previously confirmed activity
ISM04CO_RUMNGQUAN13(3) Previously confirmed activity
ISM05CO_RUMNGQUAN13(3) Previously confirmed activity
ISM06CO_RUMNGQUAN13(3) Previously confirmed activity
ISMNWCO_ISMNWQUAN13(3) Actual work
FSAVDFSAVDDATS8 Earliest scheduled start: Execution (date)
FSAVZFSAVZTIMS6 Earliest scheduled start: Execution (time)
FSSBDFSSBDDATS8 Earliest scheduled start: Processing (date)
FSSBZFSSBZTIMS6 Earliest scheduled start: Processing (time)
FSSADFSSADDATS8 Earliest scheduled start: Teardown (date)
FSSAZFSSAZTIMS6 Earliest scheduled start: Teardown (time)
FSEDDFSEDDDATS8 Earliest scheduled finish: Execution (date)
FSEDZFSEDZTIMS6 Earliest scheduled finish: Execution (time)
FSSLDFSSLDDATS8 Earliest scheduled start: Wait (date)
FSSLZFSSLZTIMS6 Earliest scheduled start: Wait (time)
FSELDFSELDDATS8 Earliest scheduled finish: Wait (date)
FSELZFSELZTIMS6 Earliest scheduled finish: Wait (time)
SSAVDSSAVDDATS8 Latest scheduled start: Execution (date)
SSAVZSSAVZTIMS6 Latest scheduled start: Execution (time)
SSSBDSSSBDDATS8 Latest scheduled start: Processing (date)
SSSBZSSSBZTIMS6 Latest scheduled start: Processing (time)
SSSADSSSADDATS8 Latest scheduled start: Teardown (date)
SSSAZSSSAZTIMS6 Latest scheduled start: Teardown (time)
SSEDDSSEDDDATS8 Latest scheduled finish: Execution (date)
SSEDZSSEDZTIMS6 Latest scheduled finish: Execution (time)
SSSLDSSSLDDATS8 Latest scheduled start: Wait time (date)
SSSLZSSSLZTIMS6 Latest scheduled start: Wait time
SSELDSSELDDATS8 Latest scheduled finish: Wait time (date)
SSELZSSELZTIMS6 Latest scheduled finish: Wait time
ISAVDISAVDDATS8 Actual operation start (date)
IEAVDIEAVDDATS8 Actual finish of operation (date)
ISDDISDDDATS8 Actual start: Execution (date)
ISDZISDZTIMS6 Actual start: Execution/setup (time)
IERDIERDDATS8 Actual finish: Setup (date)
IERZIERZTIMS6 Actual finish: Setup (time)
ISBDISBDDATS8 Actual start: Processing (date)
ISBZISBZTIMS6 Actual start: Processing (time)
IEBDIEBDDATS8 Actual finish: Processing (date)
IEBZIEBZTIMS6 Actual processing finish (time)
ISADISADDATS8 Actual start: Teardown (date)
ISAZISAZTIMS6 Actual start: Teardown (time)
IEDDIEDDDATS8 Actual finish: Execution (date)
IEDZIEDZTIMS6 Actual finish: Execution (time)
PEDDCO_PEDDDATS8 Forecast finish date of operation from confirmation
PEDZCO_PEDZTIMS6 Forecast finish time of operation from confirmation
PUFFRPUFFR_FREIDEC3 Free float
PUFGSPUFFR_GESMDEC3 Total float
NTANFVORGABESTDDATS8 Constraint for activity start (Basic)
NTANZVORGABESTZTIMS6 Constraint for activity start time (Basic)
NTENDVORGABEEND2DATS8 Constraint for Finish of Activity (Basic)
NTENZVORGABEENZTIMS6 Basic finish time of the activity
EWSTDEWSTARTDDATS8 Forecasted start date for the activity
EWSTZEWSTARTZTIMS6 Forecast start time of the activity
EWENDEWENDEDDATS8 Forecast finish date
EWENZEWENDEZTIMS6 Forecast finish time for the activity
EWDANEWDANQUAN5(1) Normal duration (from forecast) of activity
EWDNEEWDNEUNIT3 T006Unit for forecast normal duration
EWDAMEWDAMQUAN5(1) Minimum duration (from forecast) for activity
EWDMEEWDMEUNIT3 T006Unit for forecast minimum duration
EWSTEPS_RESTECHAR1 Forecast date constraint on activity finish
EWSTAPS_RESTACHAR1 Forecast date constraint on activity start
WARTZWARTEZEITFLTP16(16) Queue time used for scheduling
WRTZEWTRZEUNIT3 Unit of measure for queue time
RUESTRUESTFLTP16(16) Setup time
RSTZERSTZEUNIT3 Unit of measure for setup time
BEARZBEARZEITFLTP16(16) Processing time
BEAZEBEAZEUNIT3 Unit of measure for processing time
ABRUEABRUEFLTP16(16) Teardown
ARUZEARUZEUNIT3 Unit of measure for teardown
LIEGZLIEGEZEITFLTP16(16) Wait time used for scheduling
LIGZELIGZEUNIT3 Unit of measure for wait time
TRANZTRANSZEITFLTP16(16) Move time used for scheduling
TRAZETRAZEUNIT3 Unit of measure for move time
ISERHISERHQUAN9(3) Confirmed break time
OFM01CO_SCHAETZQUAN9(3) Forecast value used to update the standard value
OFM02CO_SCHAETZQUAN9(3) Forecast value used to update the standard value
OFM03CO_SCHAETZQUAN9(3) Forecast value used to update the standard value
OFM04CO_SCHAETZQUAN9(3) Forecast value used to update the standard value
OFM05CO_SCHAETZQUAN9(3) Forecast value used to update the standard value
OFM06CO_SCHAETZQUAN9(3) Forecast value used to update the standard value
OFMNWOFMNWQUAN7(1) Forecasted work (actual + remaining)
BZOFFBCP_OBZOFFBCHAR2 TCA54Reference date for start of sub-operation
EHOFFBCP_OEHOFFBUNIT3 T006Unit for offset to start
OFFSTBCP_OOFFSTBQUAN5 Offset to sub-operation start
OFFSTECP_OOFFSTEQUAN5 Offset to sub-operation finish
BZOFFECP_OBZOFFECHAR2 TCA54Reference date for finish of sub-operation
EHOFFECP_OEHOFFEUNIT3 T006Unit for offset to finish
FPAVDFPAVDDATS8 Earliest scheduled start date (forecast)
FPAVZFPAVZTIMS6 Earliest scheduled start time (forecast)
FPEDDFPEDDDATS8 Earliest scheduled finish date (forecast)
FPEDZFPEDZTIMS6 Earliest scheduled finish time (forecast)
SPAVDSPAVDDATS8 Latest scheduled start date (forecast)
SPAVZSPAVZTIMS6 Latest scheduled start time (forecast)
SPEDDSPEDDDATS8 Latest scheduled finish date (forecast)
SPEDZSPEDZTIMS6 Latest scheduled finish time (forecast)
BEAZPBEAZEPUNIT3 Unit of processing time (Forecast)
PUFGPPPUFF_GESMDEC3 Total float (from forecast)
PUFFPPPUFF_FREIDEC3 Free float (from forecast)
BEARPPBEARZEITFLTP16(16) Processing time (forecast)
EPANFEPANFDATS8 Dispatched start date for operation
EPANZEPANZTIMS6 Dispatched start time for operation
EPENDEPENDDATS8 Dispatched finish date
EPENZEPENZTIMS6 Dispatched finish time
PDAUPDAUQUAN5(1) Forecasted duration of activity from confirmation
PDAEPDAEUNIT3 T006Unit of the forecasted duration from the confirmation
KNOTEKNOTECHAR10 TVKNTransportation Connection Points
VSTZWVSTZWCHAR4 TVTZDeadline function
VSTGAVSTGACHAR4 TVTGDeadline deviation reason
QRASTZEHTQRASTZEHTUNIT3
*
Time Unit
QRASTZFAKQRASTZFAKDEC5(2) Time Factor
QRASTMENGQRASTMENGQUAN13(3) Quantity Between Two Inspections
QRASTEREHQRASTEREHUNIT3
*
Grid Unit of Measure
AUFKTAFAKTDEC3 Execution Factor
RMNGARMNGAQUAN13(3) Total confirmed rework quantity
ILE01CO_ISMNGEHUNIT3
*
Unit of measure for the activity to be confirmed
ILE02CO_ISMNGEHUNIT3
*
Unit of measure for the activity to be confirmed
ILE03CO_ISMNGEHUNIT3
*
Unit of measure for the activity to be confirmed
ILE04CO_ISMNGEHUNIT3
*
Unit of measure for the activity to be confirmed
ILE05CO_ISMNGEHUNIT3
*
Unit of measure for the activity to be confirmed
ILE06CO_ISMNGEHUNIT3
*
Unit of measure for the activity to be confirmed
RWFAKRWFAKDEC5(3) Rework factor (is not used yet)
IPRZ1CO_IPRZSQUAN13(3) Confirmed quantity/work for business process
IPRE1RU_IPRZEUNIT3
*
Unit of measurement for conf. quantity for business process
IPRK1RU_IPRZKCHAR1 No remaining quantity expected for business process
TAKTLD_TAKTNUMC4 takt within a line segment
OPRZ1OPRZ1QUAN13(3) Remaining quantity for business process
OPRE1OPRE1UNIT3
*
Unit for remaining quantity of business process
PSPM_INDICATORPSPM_INDICATORCHAR1 Indicates PMCS date influence activity scheduling
.INCLUDEAFVUI Include structure of the user fields of the operation
SLWIDSLWIDCHAR7 TCN00Key word ID for user-defined fields
USR00USRCHAR20CHAR20 User field with 20 characters
USR01USRCHAR20CHAR20 User field with 20 characters
USR02USRCHAR10CHAR10 User field with 10 characters
USR03USRCHAR10CHAR10 User field with 10 characters
USR04USRQUAN13QUAN13(3) User field for quantity (length 10.3)
USE04USRUNITUNIT3 T006User field: Unit for quantity fields
USR05USRQUAN13QUAN13(3) User field for quantity (length 10.3)
USE05USRUNITUNIT3 T006User field: Unit for quantity fields
USR06USRCURR13CURR13(3) User-defined field for values (length 10,3)
USE06USRCUKYCUKY5 TCURCUser field: Unit for value fields
USR07USRCURR13CURR13(3) User-defined field for values (length 10,3)
USE07USRCUKYCUKY5 TCURCUser field: Unit for value fields
USR08USRDATEDATS8 User field for date
USR09USRDATEDATS8 User field for date
USR10USRFLAGCHAR1 User-defined field: Indicator for reports
USR11USRFLAGCHAR1 User-defined field: Indicator for reports
.INCLUDEGJV_DATA_5 JV data: (GJV_DATA_2),jv_oco
.INCLUDEGJV_DATA_2 JV data: (vname,recid,etype),jv_otype,jv_jibcl,jv_jibsa
.INCLUDEGJV_DATA_0 General assignments of application objects
VNAMEJV_NAMECHAR6 T8JVJoint Venture
RECIDJV_RECINDCHAR2 T8JJRecovery Indicator
ETYPEJV_ETYPECHAR3 T8JGEquity type
JV_OTYPEJV_OTYPECHAR4 Joint Venture Object Type
JV_JIBCLJV_JIBCLCHAR3 T8J6AJIB/JIBE Class
JV_JIBSAJV_JIBSACHAR5 T8J6CJIB/JIBE Subclass A
JV_OCOJV_OR_COCHAR1 JV original cost object
DUMMY_CI_AFVUCHAR1CHAR1 Single-Character Indicator
SPARAMETER1SPARAMETERCHAR4 Scheduling Parameters for External Scheduling
SPARAMETER2SPARAMETERCHAR4 Scheduling Parameters for External Scheduling
SPARAMETER3SPARAMETERCHAR4 Scheduling Parameters for External Scheduling
/MRSS/ID_PROFILE/MRSS/T_REQU_UPDCHAR1 Requirements Profile Was Changed Manually
/MRSS/PROF_KEY/MRSS/T_RSG_REQUIDCHAR10 Profile Key
/MRSS/PROF_GUIDCHAR32CHAR32 Character field, length 32
/MRSS/ACT_TYPE/MRSS/T_ACTIVITY_TYPECHAR1 Process variant
/MRSS/ORDER_PROB/MRSS/T_ORDER_PROBCHAR3 Order probability in percent
/MRSS/INIT_DONE/MRSS/T_INIT_DONECHAR1 Internal initialization carried out once
/MRSS/DATACHANGE/MRSS/T_USCREENCTL_DATACHANGEDCHAR1 Data was changed in the controls on the user screen
/MRSS/DEM_COUNT/MRSS/T_DEM_COUNTNUMC4 Counter for Demands in Operation
/MRSS/SUPERV_CNT/MRSS/T_RAP_SUPERVISOR_COUNTCHAR2 Number of Site Supervisors
/MRSS/RULE_ID/MRSS/T_RSG_TIME_RULE_IDCHAR25 Time Rule Id
/MRSS/REFF_RCNT/MRSS/T_REM_EFFORT_RES_COUNTNUMC3 Determination of Remaining Demand: No. of Resources
/MRSS/REFF_E_BEG/MRSS/T_TIMESTAMP_BEGINNUMC14 Time stamp: start
/MRSS/REFF_E_END/MRSS/T_TIMESTAMP_ENDNUMC14 Time stamp: end
/MRSS/REFF_L_BEG/MRSS/T_TIMESTAMP_BEGINNUMC14 Time stamp: start
/MRSS/REFF_L_END/MRSS/T_TIMESTAMP_ENDNUMC14 Time stamp: end
/MRSS/RELEVANT/MRSS/T_RELEVANT_FOR_MRSCHAR1 Operation Set as MRS-Relevant
/MRSS/TEAM_PLAN/MRSS/T_RSG_TEAM_PLANNINGCHAR1 Team Planning flag for Demand
/MRSS/SINGL_RES/MRSS/T_RSG_FORCE_SINGLE_RESCHAR1 Indicator for Forcing a Single Resource
/MRSS/TO_BEGDATDATSDATS8 Field of type DATS
/MRSS/TO_BEGTIMTIMSTIMS6 Field of type TIMS
/MRSS/TO_ENDDATDATSDATS8 Field of type DATS
/MRSS/TO_ENDTIMTIMSTIMS6 Field of type TIMS
/MRSS/TO_DURATCHAR10CHAR10 Character Field Length = 10
/MRSS/TO_DUNITMEINSUNIT3
*
Base Unit of Measure
/MRSS/TO_DISTANCHAR19CHAR19 19 Characters
/MRSS/TO_MANUAL/MRSS/T_RSG_BOOLEANCHAR1 Boolean Variable
/MRSS/FR_BEGDATDATSDATS8 Field of type DATS
/MRSS/FR_BEGTIMTIMSTIMS6 Field of type TIMS
/MRSS/FR_ENDDATDATSDATS8 Field of type DATS
/MRSS/FR_ENDTIMTIMSTIMS6 Field of type TIMS
/MRSS/FR_DURATCHAR10CHAR10 Character Field Length = 10
/MRSS/FR_DUNITMEINSUNIT3
*
Base Unit of Measure
/MRSS/FR_DISTANCHAR19CHAR19 19 Characters
/MRSS/FR_MANUAL/MRSS/T_RSG_BOOLEANCHAR1 Boolean Variable
.APPENDAFVUI_OLC AFVUI APPEND for Operation Account Assignment
ILART_OPILACHAR3
*
Maintenance activity type
.APPENDFERC_AFVUI Append structure for Regulatory Reporting
FERC_INDFE_INDCHAR4 FERC_C7Regulatory indicator
.INCLUDECOOPRINF Order: Additional dialog fields for AFVGF
FLGATFOLGENARTCHAR1 TCA07Sequence category
APLFZPLIFZDEC3 Planned Delivery Time in Days
ARBPLARBPLCHAR8 Work center
LOSVGCX_LOSVGQUAN13(3) Operation quantity in order unit of measure
LOSMEMEINSUNIT3 T006Base Unit of Measure
FLG_KMPFLG_KMPCHAR1 Indicator: Components allocated
FLG_PRMFLG_PRMCHAR1 Indicator: Inspection Characteristics Assigned
FLG_FHMFLG_FHTCHAR1 Indicator: PRTs Assigned
FLG_EVPFLG_EVPCHAR1 Indicator: Trigger points allocated
FLG_PSTFLG_PSTCHAR1 Indicator: PS texts exist
UVORNUVORNCHAR4 Suboperation
KOSTLKOSTLCHAR10
*
Cost Center
KOKRSKOKRSCHAR4
*
Controlling Area
DAWARCO_DAUWARQUAN7(1) Queue time
DARUECO_DAURUEQUAN7(1) Setup time
DABEACO_DAUBEAQUAN7(1) Processing time
DAABRCO_DAUABRQUAN7(1) Teardown time
DALIECO_DAULIEQUAN7(1) Wait time
VSTTXTCO_STTXTCHAR40 System Status
FLG_UVOFLG_UVOCHAR1 Indicator: Suboperation exists
FLG_MSTFLG_MSTCHAR1 Indicator: Milestone
FLG_RCKFLG_RCKCHAR1 Indicator: Operation requires confirmation
FLG_OFFFLG_OFFCHAR1 Indicator: Open operation (not finally confirmed)
FLG_FREFLG_FRECHAR1 Indicator: Release operation
FLG_LOEFLG_LOECHAR1 Indicator: Operation is deleted
FLG_FRDFLG_FRDCHAR1 Indicator: Operation is processed externally
FLG_AWEFLG_AWECHAR1 Indicator: automatic goods receipt
VARTCIM_VARTCHAR1 Dummy
INDBTTABIX_DINT410 Field defined as in SY-TABIX
AUFNRDAUFNRCHAR12
*
Order Number
DAPBECO_DAUBEAPQUAN7(1) Duration of processing time (forecast)
WEMNG_OPRWEMNGQUAN13(3) Quantity of Goods Received
WEMEH_OPRBSTMEUNIT3
*
Purchase Order Unit of Measure
DATRACO_DAUTRAQUAN7(1) Duration of move time
DADRFCO_DAUDRFQUAN7(1) Duration of execution time (setup + processing + teardown)
FSEVDFSEVDDATS8 Earliest finish of operation (date)
FSEVZFSEVZTIMS6 Earliest finish of operation (time)
SSEVDSSEVDDATS8 Latest finish date of operation
SSEVZSSEVZTIMS6 Latest operation finish (time)
BANFN_DELCO_BANFNCHAR10 Purchase requisition number
BNFPO_DELCO_BNFPONUMC5
*
Item number of the purchase requisition in the order
KALTXKALTXCHAR20 Description of the factory calendar
FLG_PURSFLG_PURSCHAR1 Indicator: Purchase order exists
KONNRKONNRCHAR10 EKKONumber of Principal Purchase Agreement
KTPNRKTPNRNUMC5 EKPOItem Number of Principal Purchase Agreement
PVZNRPVZNRCHAR4 Superordinate Operation
PVZINTABIX_DINT410 Field defined as in SY-TABIX
FLG_VABFLG_VABCHAR1 Indicator: Sub-network exists
QLSEARCHQL_SEARCHCHAR12 Search term for qualification requirements
QLSTEXTSTEXTCHAR40 Object Name
PSTXTARNPTXARTCHAR2
*
Type of PS text to be copied into the purchase requisition
PSTXTTITXTTICHAR20 PS text description
INDEXSUMNRTABIX_DINT410 Field defined as in SY-TABIX
ARBPIARBPL_ICHAR8 Actual work center
AUDISPAUDISP_PLUSCHAR1 Reservation Relevance/Generation of Purchase Requisition
FLIEFFLIEFCHAR10
*
Fixed Vendor
TXCHGTXCHGCHAR1 Indicator: long text changed
COMP_RESOCM_COMP_RESCHAR1 OCM: Result of comparison of two order objects
ASKUMX_KUM_PERQUAN13(3) Cumulative Scrap Qty of Subsequent Reporting Pts (Cur. Per.)
PSTXCHGPSTXCHGCHAR1 Ind.: Changed PS text
FLG_DLFLG_DLCHAR1 Document links exist
FLG_CALCFLG_CALCCHAR1 Indicator: Order (network etc.) still to be calculated
SPLQSPLIT_QTYQUAN13(3) Split Quantity in Order Split
EQUNREQUNRCHAR18
*
Equipment Number
TPLNRTPLNRCHAR30
*
Functional Location
IDENTOPRIDCHAR8 Operation ID
SERVCHGXFELDCHAR1 Checkbox
FLG_OBJCKKNOBJONCHAR1 KNOBJ Is Filled, Object Dependencies Exist
QMNUMQMNUMCHAR12
*
Notification No
NPLDANPLDADATS8 Next planned date
EPROFILEMEPROFILECHAR2 External Procurement Profile
/CUM/INTCUNR/CUM/INTCUNRNUMC6 CU: Internal CU Number in a Work Order
.INCLUDEVSOPRINF Include activities for versions
VSNMRVSNMRCHAR12 Number or description of a version
.INCLUDEVSACTINF Version include for original key activity
ORGAUFPLCO_AUFPLNUMC10 Routing number of operations in the order
ORGAPLZLCO_APLZLNUMC8
*
General counter for order
INACTVSINACTCHAR1 Version inactive indicator


Key field
Non-key field


Relations between ACT01 and other tables


ARKOPF-Archiving run header data
      VSKOPF-Version: Header - general data for a
            RSTHIE-BRST structure of the hierarchy table
                  PSDYRH-LDB PSJ: Dummy structure under RSTHIE
            PROJ-Project definition
                  PSDYPD-LDB PSJ: Dummy structure under PROJ
            VBAK-Sales Document: Header Data
                  VBUK-Sales Doc.: Header Status and Administrative Data
                  VBKD-Sales Document: Business Data
                  VBAP-Sales Document: Item Data
                        VBUP-Sales Document: Item Status
                        VBKDPO-Sales document: Business item data (POSNR > 0)
                              FPLA-Billing plan
                                    FPLT-Billing Plan: Dates
                        PSDYVB-LDB PSJ: Dummy structure under VBAP
                  PSDYVK-LDB PSJ: Dummy structure under VBAK
            PRPS_R-Project Hierarchy Reporting Structure
                  PRTE-Scheduling Data for Project Item
                  PSMLST-Milestone I/O Table
                  PSTX-PS Texts (Header)
                  PLAF-Planned order
                  PSMERK_PRPS-Characteristics for Summarization for WBS Elements
                        KBED04-Capacity Requirement Recs for Planned Orders (LDB)
                        RESB04-Reservation/dependent reqs for plan order (LDB)
                  PSDYPR-LDB PSJ: Dummy structure under PRPS_R
            AUFK-Order master data
                  AFKO-Order Header Data PP Orders
                        AFPO-Order Item
                        AFFL-Work order sequence
                              ACT01-Activity for LDB 01
                                    AFAB01-Network Relationship (for LDB) - 01
                                    MLSTD-Milestone I/O Table
                                    PSTX1-PS Texts (Header) for Activity (1)
                                    AFFH01-Order PRT Data (for LDB) - 01
                                    KBED01-Capacity Requirement Records (for LDB) - 01
                                          KBEZ-Additional data for table KBED (for ind.req/split)
                                                KPER-Additional data for KBEZ (person split in days)
                                          AFRU02-Order Confirmations (for LDB) -02
                                    RESB01-Reservation/Dependent Requirement for LDB-01
                                          PSDYOK-LDB PSJ: Dummy structure under RESB01
                                    AFRU01-Order Confirmations (for LDB) - 01
                                    PSMERK_ACT-Charactersitics for Summarization for Activity
                                    PSDYNV-LDB PSJ: Dummy structure under ACT01
                  AFIH-Maintenance order header
                  PSDYNP-LDB PSJ: Dummy structure under AUFK
            IMTP-Investment programs
                  IMPR-Investment Program Positions
                        PSDYIP-LDB PSJ: Dummy structure under IMPR
                  PSDYPG-LDB PSJ: Dummy structure under IMTP
            PEGOB-Peg (master data of the CO object)
                  PEGQTY-Assigned pegging object quantities
                  PSDYPEG-LDB PSJ: Dummy Structure Under PEGOB
            ELM_PS-Additional data for hierarchy nodes (LDB PSJ)
                  JSTO-Status object information
                        PSTAT-Condensed status display
                        JCDO-Change Documents for Status Object (Table JSTO)
                        JEST-Individual Status per Object
                              JCDS-Change docs. for system/user status (table JEST)
                  ONR00-General Object Number
                        RPSCO1-Summarization Table for Project Reporting
                        RPSQT-Summarization table for project reporting (quants)
                        EV_PARAM-Object parameters for earned value analysis
                        EV_POC-Earned value analysis: percentage of completion
                        EV_VAL-Earned value analysis: earned value
                        COBRA-Settlement Rule for Order Settlement
                              COBRB-Distribution rules for sett. rule for order sett.
                        BPHI1-Cross-hierarchy data Control
                        BPTR1-Object Data Control
                              BPGE1-Totals record total value Control
                                    BPVG1-Table Generated for View BPVG1
                                    BKHS1-Header - Unit Costing (Control + Totals)
                                          HEAD10-SAPscript: Text Header
                                                LINE10-SAPscript: Text Lines
                                          BKHT1-Texts for CKHS
                                          BKIS1-Individual calculation/verification item gen.
                                                BKIT1-Texts for CKIS
                                          BKIP1-Periodic Values for Unit Costing Item
                              BPJA1-Totals record for total year value Control
                                    BPVJ1-Table Generated for View BPVJ1
                                    BKHS2-Header - Unit Costing (Control + Totals)
                                          HEAD20-SAPscript: Text Header
                                                LINE20-SAPscript: Text Lines
                                          BKHT2-Texts for CKHS
                                          BKIS2-Individual calculation/verification item gen.
                                                BKIT2-Texts for CKIS
                                          BKIP2-Periodic Values for Unit Costing Item
                              BPPE1-Totals Record for Period Values Control
                                    BPVP1-Table Generated for View BPVP1
                              BPIG1-Budget Object Index (Overall Budget)
                              BPIJ1-Budget Object Index (Annual Budget)
                        COKA1-CO Object: Cost Element Control Data
                        COKP1-CO Object: Primary Planning Control Data
                              HEAD11-SAPscript: Text Header
                                    LINE11-SAPscript: Text Lines
                              CKHS1-Header - Unit Costing (Control + Totals)
                                    CKHT1-Texts for CKHS
                                    HEAD12-SAPscript: Text Header
                                          LINE12-SAPscript: Text Lines
                                    CKIS1-Individual calculation/verification item gen.
                                          CKIT1-Texts for CKIS
                                    CKIP1-Periodic Values for Unit Costing Item
                        COSP1-CO Object: Cost Totals for External Postings
                              COVP11-CO object: Line items with doc. header (by period)
                                    COEPD11-CO object: Unvaluated ln. item settlement w/status
                                          COEPBR11-CO Object: Valuated Line Item Settlement
                              COVJ11-CO object: Line items with doc header (by year)
                              COVO1-CO Object: Open Items for Line Items (w/o doc.Hdr)
                        COSPD1-CO object: External cost totals - calculated
                        COSPP-Transfer of Order in the COSP Table to the Project
                        COKS1-CO Object: Control Data for Secondary Planning
                              HEAD13-SAPscript: Text Header
                                    LINE13-SAPscript: Text Lines
                        COSS1-CO Object: Cost Totals for Internal Postings
                              COVP12-CO object: Line items with doc. header (by period)
                                    COEPD12-CO object: Unvaluated ln. item settlement w/status
                                          COEPBR12-CO Object: Valuated Line Item Settlement
                              COVJ12-CO object: Line items with doc header (by year)
                              COVO12-CO object: Fxd price agreement commitment ln items
                        COSSD1-CO object: Internal cost totals - calculated
                        COSSP-Transfer of the Order COSS Table to the Project
                        COKR1-CO Object: Control Data for Statistical Key Figs
                              HEAD14-SAPscript: Text Header
                                    LINE14-SAPscript: Text Lines
                        COSR1-CO Object: Statistical Key Figure Totals
                              COVPR1-CO object: Stat. key figure line items by period
                              COVJR1-CO object: Line items stat. key figures (by year)
                        COSL1-CO Object: Activity Type Totals
                              COVPL1-CO object: Activity type line items by period
                              COVJL1-CO object: Line items for acty types (by year)
                        COSLD-CO object: Activity type sums - calculated
                        COSB1-CO Object: Total Variances/Results Analyses
                              COVPB1-CO object: Variance/accrual line items by period
                        COSBD1-CO object: Sums of variance/accrual - calculated
                        ANIA1-Depr. simulation for invest. projects
                              ANIB1-Invest. projects: Depr. simulation analysis report
                        ANLI1-Link table for capital investment measure -> AuC
                        FMSU1-FM totals records for financial data
                              COVFP1-CO object: Financial data line items with doc. hdr
                        TPI031-CO Objects: Date of Last Interest Run
                  EKKO-Purchasing Document Header
                        EKPO-Purchasing Document Item
                              EKET-Scheduling Agreement Schedule Lines
                              EKKN-Account Assignment in Purchasing Document
                              EKBE-Purchasing Document History
                  EBAN-Purchase requisition
                        EBKN-Purchase Requisition Account Assignment
                  FPLAPS-Billing plan for PSP network plan
                        FPLTPS-Billing plan for PSP/network (dates)
                  LIKP-SD Document: Delivery Header Data
                        LIPS-SD document: Delivery: Item data
                  PSMERK-Characteristics for summarization wo.classificatn
                  DRAD-Document-object link